Ad for a new executive director, April, pg. 4; May, pg. 30.
Ad for the AACE International Cyber Section, April, pg. 23; Sept., pg. 25; Oct., pg. 24; and
Dec., pg. 28.
Cooperative Advertising
Stevens Institute of Technology: April, pg. 34; June, pg., 28; July, pg. 6; and Dec., pg, 23.
Bokhary, Wail. Project Evaluation and Control System, July, pgs. 7-15.
Chilcott, Alan J., CCE. Risk Management—A Developing Field of Study and Application, Sept., pgs. 9-16.
Evrenosoglu, Faik Burak, CCE PSP. Modeling Historical Cost Data for Probabilistic Range Estimating,
May, pgs. 11-18.
Hanopy, Christopher P., CCC. Pre-Construction Management by the Independent Cost Engineer. Aug., pgs. 9-13.
Hoelscher, James W., Jr., CCC. Discussion of Well Design and Pump Selection for Water Wells. Jan., pgs. 19-23.
Grace, Martin J., CCE. Pre-Construction Cost Control for Hard Bid Projects, Feb., pgs. 8-17.
McElreath, Russell. Using On-Screen Takeoff in Construction Cost Estimating,
June, pgs. 11-16.
Portilla, Ancizar, CCE PSP. Productivity Loss for Sewer Pipe Installation. April, pgs. 11-16.
Storms, Katherine, CCC. Earned Value Management Implementation in a Public Agency Capital Improvement Project. March, pgs. 6-9.
CERTIFICATION ARTICLES (BY TITLE)
Discussion of Well Design and Pump Selection for Water Wells. James W. Hoelscher Jr., CCC, Jan., pgs. 19-23.
Earned Value Management Implementation in a Public Agency Capital Improvement Project. Katherine Storms, CCC. March, pgs. 6-9.
Modeling Historical Cost Data for Probabilistic Range Estimating. Faik Burak Evrenosoglu, CCE PSP, May, pgs. 11-18.
Pre-Construction Cost Control for Hard Bid Projects. Martin J. Grace, CCE, Feb., pgs. 8-17.
Pre-Construction Management by the Independent Cost Engineer. Christopher P. Hanopy, CCC, Aug., pgs. 9-13.
Productivity Loss for Sewer Pipe Installation. Ancizar Portilla, CCE PSP, April, pgs. 11-16.
Project Evaluation and Control System. Wail Bokhary, July, pgs. 7-15.
Risk Management—A Developing Field of Study and Application. Alan J. Chilcott, CCE, Sept., pgs. 9-16.
Using On-Screen Takeoff in Construction Cost Estimating. Russell McElreath, June, pgs. 11-16.
TECHNICAL
TECHNICAL ARTICLES (BY AUTHOR)
Brasco, Christopher J. and Christopher M. Anzidei. Concurrent Delay and the Critical Path: Views from the Bench. Feb., pgs. 18-24.
Cabano, Stephen L. The Changing Face of Owner Project Risks. Nov., pgs. 20-23.
Christensen-Dey, Carol J. EVP PSPEarned Value on Fixed-Price Projects. Oct., pgs. 12-17.
Creese, Dr. Robert C., PE CCE, and Yi FangTime-Based Schedule Performance Index. March, pgs. 18-20.
Kiess, Dr. Thomas E., and Sarah MorganSix States Defined by Earned Value Variance and It’s Use to Form New Project Performance Indicators. March, pgs., 10-17.
Leo, Douglas W. CCC CEP MRICSOwner Review Process for Mega-Project Estimates. Oct., pgs. 18-22.
Nalewaik, Alexia A., CCE MRICS, and Jeffrey WittChallenges Reporting Project Costs and Risks to Owner Decisionmakers. Aug., pgs. 15-19.
Okere, George O., CCCThe Elusive Goal of Consistently Meeting Contract Administration Objectives: A Conceptual Report. April, pgs. 24-29.
O’Neill, Stephen and Limor RozmarinSteel Fabrication Costs in China. Sept., pgs. 18-24.
Owen, Julie K., CCC PSP, and Thomas W. BamhartSchedule Collaboration on Mars Science Laboratory With Multi-Users and Tools. March, pgs., 22-26.
Rowe, JohnSimplified Approach to Cash Flows: How to Predict the Future in Your Space Time. July, pgs. 18-23.
Ruwanpura, Dr. Janaka and Dr. George Jergeas, P.EngWhy Cost and Schedule Overruns on Mega Oil Sands Projects? Jan., pgs. 24-27.
Sarper, Dr. Hüseyin, PE, and Burak L. UnayA Cost Estimation Methodology for a Pre-Feasibility Study of Wind Energy Projects. Nov., pgs. 16-21.
Serpell, Alfredo F. Modeling Project’s Scope for Conceptual Cost Estimating. Aug., pgs. 20-26.
Shane, Dr. Jennifer S. Dr. Keith R. Molendar, Dr. Stuart D. Anderson, PE, and Dr. Cliff J. Schexnayder, PEHighway Cost Estimating and Estimate Management: A Concept to Completion
Process Approach. May, pgs., 19-29.
Uppal, Kul B., PE CEP
TCM Projects Use Integrated Cost, Schedule and Team Empowerment. Nov., pgs. 23-27.
Wolf, Britton
Ultra Fast Track Project Execution on an International Biopharmaceutical Production Facility. June, pgs., 17-27.
TECHNICAL ARTICLES (BY TITLE)
A Cost Estimation Methodology for a Pre-Feasibility Study of Wind Energy Projects. Dr. Hüseyin Sarper, PE, and Burak L. Unay. Nov., pgs. 16-21.
Challenges Reporting Project Costs and Risks to Owner Decisionmakers. Alexia A. Nalewaik, CCE MRICS, and Jeffrey Witt. Aug., pgs. 15-19.
Concurrent Delay and the Critical Path: Views from the Bench. Christopher J. Brasco and Christopher M. Anzidei. Feb., pgs. 18-24.
Earned Value on Fixed-Price Projects. Carol J. Christensen-Dey, EVP PSP. Oct., pgs. 12-17.
Highway Cost Estimating and Estimate Management: A Concept to Completion Process Approach. Dr. Jennifer S. Shane, Dr. Keith R. Molendar, Dr. Stuart D. Anderson, PE, and Dr.
Cliff J. Schexnayder, PE. May, pgs., 19-29.
Modeling Project’s Scope for Conceptual Cost Estimating. Alfredo F. Serpell. Aug., pgs. 20-26.
Owner Review Process for Mega-Project Estimates. Douglas W. Leo, CCC CEP MRICS. Oct., pgs. 18-22.
Schedule Collaboration on Mars Science Laboratory With Multi-Users and Tools. Owen, Julie K. Owen, CCC PSP, and Thomas W. Bamhart. March, pgs., 22-26.
Simplified Approach to Cash Flows: How to Predict the Future in Your Space Time. John Rowe, July, pgs. 18-23.
Six States Defined by Earned Value Variance and It’s Use to Form New Project Performance Indicators. Dr. Thomas E. Kiess and Sarah Morgan. March, pgs., 10-17.
Steel Fabrication Costs in China. Stephen O’Neill and Limor Rozmarin. Sept., pgs. 18-24.
TCM Projects Use Integrated Cost, Schedule and Team Empowerment. Kul B. Uppal, PE CEP. Nov., pgs. 23-27.
The Changing Face of Owner Project Risks. Stephen L. Cabano. Nov., pgs. 20-23.
The Elusive Goal of Consistently Meeting Contract Administration Objectives: A Conceptual Report. George O. Okere, CCC. April, pgs. 24-29.
Time-Based Schedule Performance Index. Dr. Robert C. Creese, PE CCE, and Yi Fang. March, pgs. 18-20.
Ultra Fast Track Project Execution on an International Biopharmaceutical Production Facility. Britton Wolf. June, pgs., 17-27.
Why Cost and Schedule Overruns on Mega Oil Sands Projects? Dr. Janaka Ruwanpura and Dr. George Jergeas,
P.Eng. Jan., pgs. 24-27.
OTHER PUBLISHED ARTICLES
EXECUTIVE ARTICLES
Goldsmith, Dr. Barton. Emotional Fitness at Work, Creating a Positive Workplace.
Sept., pgs. 6-7.
Kaye, Steve. Able Leader, Life Strategy for Success. April, pg. 10.
Kaye, Steve. Able Leader, How to Deal With Uncertainty. Nov., pg. 9.
FEATURE AND SPECIAL FEATURE ARTICLES
Kelley, Jean. Take Your Business Networking to a New Level. July, pgs. 5-6.
Kraus, William E. PE CCE. Hostage to Poor Design. Jan., pg. 3.
Suprick, Joseph and Vittal Anantatmula. Project Managing Your Single Largest Investment, A Guide to Building Your Own Home.
April, pgs. 17-23.
Warhoe, Stephen P. Here’s Your Opportunity to Recognize Your Peers. Feb., pg. 34.
SPECIAL FOCUS ARTICLE
Dunavant, Erin. A Look at the 2010 Spring Symposium. Dec., pgs. 26-27.
GENERAL ARTICLES
Prezioso, Danelle. McDonough Bolyard Peck Receives an CMAA 2009 National Project Achievement Award, Jan., pg. 27.
High School Students Design Assistive Technology Drives to Help People With Disabilities, April, pg. 8.
Hill International Acquires Boyken International, March, pg., 17.
Hill International Acquires TRS Consultants, March, pg. 32.
Liraz, Meir. Tips for Business Owners. April, pg. 4.
Survey Polls Girls on Their Interest in Engineering. Aug., pg. 6.
ISO Offers Standard on Risk Assessment, Aug., pg. 13.
US Army Supports Minority Students for Careers in Engineering, Sept., pg. 31.
AACE INTERNATIONAL
ANNUAL MEETING PROMOTION
Atlanta, Georgia - Host of the 2010 Annual Meeting, Feb., pg. 3.
Atlanta Marriott Marquis Host Hotel for the 2010 Annual Meeting, March, pg. 5.
Atlanta Host of the 2010 Annual Meeting, Home of Many Attractions, April, pg. 5.
Atlanta How to Get Around at the 2010 AACE Annual Meeting, May, pg. 5.
Atlanta 2010 AACE Annual Meeting, June, pg.5.
Annual Meeting Keynote Speaker, June, pg. 4.
Reasons for Getting Your Annual Meeting Paper in on Time, Aug., pgs. 7-8
Ad for the June 19-22, 2011 Anaheim, Calif., 55th Annual Meeting, Aug., pg. 8; Oct., pg. 22; Nov., pg. 22; and Dec., pg. 8.
Abstract Notices Will be E-mailed in Late October. Oct., pg. 22.
Photo pages for 2010 AACE Annual Meeting Awards,
Oct., pgs. 28-30.
Nomination Process for AACE International Annual Awards,
Oct., pgs. 30-31.
ARTICLE REPRINTS AND PERMISSIONS
Jan.-Feb., pg. 35; March, pg. 33; and April-Dec., pg. 35;.
ASSOCIATION PROMOTIONAL ARTICLES
How to Use the AACE International Forums, Jan., pg. 23.
New AACE International Sections Approved, (Jordan Section, Korea Section, and Sudan Section), March, pg. 3.
The AACE International 2009 Salary Survey Results Posted. April, pg. 16.
The AACE International Board of Directors Names Dennis G. Stork as the New Executive Director, Oct., pg. 4.
Photo page from the 2010 Fall AACE Board Meeting, Oct., pg. 23.
AACE International Board of Directors Announces 2011 Membership Dues Increase, Nov., pg. 27.
New Calendar of Courses Feature Added to the Website, Nov., pg. 27.
April—Did You Know? What Sets AACE International’s Certification Program Apart, Ken Cressman, CCE EVP, Vice President-TEC, April, pg. 9.
May—Certification Technical Paper Graders Needed, How to Make the Request and What is Involved. Valerie Venters, CCC, Certification Board Chairman. May, pgs. 7-8.
June—Exam Day, Michael J. Bennink, PE CCE PSP, Certification Board Member. June, pg. 9.
How to Submit Section News to the Cost Engineering Journal, Jan., pg. 33; Feb. pg. 33; March, pg. 30; April-May, pg. 34; June, pg. 32; July, pg. 29; Aug., pg. 32; Sept., pg. 31; Oct.,
pg.31; Nov., pg.32; and Dec., pg. 33.
New Look for Cost Engineering Coming in 2011, Nov.-Dec., pg. 29.
Practical Articles Sought for the Cost Engineering Journal, Jan. pg. 29; Feb.-March, pg. 27; April, pg. 30.
Would You Like Your Project or Section Activity Featured on the Cover of the Cost Engineering journal? Aug.-Dec., pg. 36.
EDUCATION
EDUCATION BOARD NEWS
April—Skills & Knowledge of Cost Engineering, Chinese Translation. By Mark T. Chen, PE CCE, Education Board Member, April, pg. 8.
December—Recognizing a Distinguished Educator, Mark Chen and John Evans, Education Board Members, Dec., pg. 8,
ELECTION
The 2010-2011 Slate of Candidates, Jan., pgs. 12-18.
It’s Time to Vote ad, Feb., pg. 34; March, pg. 5.
2010 AACE International Election Results, May, pg. 4.
EDUCATION AND ENDOWMENT FUND
AACE International Would Like to Thank the 2009 Contributors to the AACE Scholarship and Endowment Funds, Feb., pgs. 6-7.
FOR THE BOOKSHELF
July: Roy W. Stratton, EVP, a review of “Earned Schedule,” by Walter H. Lipke, July, pgs. 16-17.
November: William R. Taylor, a review of “Practical Schedule Risk Analysis,” by David Hulett, Nov., pg. 28.
FROM THE COVER
AACE International Sections Conduct Successful Workshops in October, March, pg. 21.
Kraus, William E., PE CCE, The Maynard H. Jackson Jr. International Terminal at Hartsfield-Jackson Atlanta International Airport. Feb., pgs. 25-26.
AACE International and the Defense Acquisition University (DAU) signed a cooperative agreement on Aug. 19, 2010, at Fort Belvoir, Virginia, Nov., pg. 15.
The 2010 Cost Engineering Journal Index of Articles; Jan., pgs. 5-11.
LEGAL BRIEF
May:Kurt Rossetti, CCE and Sean Bluni, PE. Insurance, Do Commercial General Liability Policies Cover Subcontractors Work? May, pg. 9.
LEADERSHIP RETREAT
Several AACE International Sections, task forces, committees, and others sponsored a Leadership Retreat, Oct. 2, 2010, at Houston, Texas.
2010 MONTHLY THEMES
January - Project Management
February - Claims & Dispute Resolution
March - Earned Value Management
April - Productivity
May - Cost Estimating & Analysis
June - Annual Meeting Issue
July - Earned Value Management
August - Annual Meeting Follow-Up
September - Risk
October - Planning & Scheduling
November - Total Cost Management
December - Sustainability
ON THE COVER
January - A look back at the 2009 covers.
February - Scenes from the Atlanta Airport International Terminal construction project.
March - Scenes from a Skills & Knowledge Workshop at the Chinook-Calgary Section and a Cost Certification Workshop at the Kansas City Section.
April - A look at the architecturally impressive 470 feet (143 meters) high atrium area of the Atlanta Marriott Marquis.
May - AACE International Sections Continue to be Active (Montreal Section scholarships, Upcountry South Carolina speaker plaque, and Southern California Section joint meeting.)
June - Scenes from Atlanta, Ga.
July - Scenes from the 2010 Western Winter Workshop.
August - Scenes from the 54th Annual Meeting.
September - Photos of the 2010-2011 AACE International Board of Directors.
October - Various photos of award winners from the 2010 Annual Meeting.
November - AACE International and the Defense Acquisition University (DAU) signed a cooperative agreement on Aug. 19, 2010, at Fort Belvoir, Virginia.
December - Photos from the 2010 Spring Symposium of the Southern California and South Central California Sections, March 12-14.
ORGANIZATION CHART
Sept., pg.34;. Oct., pg. 34;
PRESIDENT'S MESSAGE
January: No message published.
February: No message published.
March:Invest in Your Future, Mark G. Grotefend, CCC, President. Jan., pg. 3.
April:An Update, Mark G. Grotefend, CCC, President. April, pgs. 3-4.
May:Grab Hold of the Reins, Mark G. Grotefend, CCC, President. May, pgs. 3-4.
June:Legacy, Mark G. Grotefend, CCC, President. June, pgs. 3-4.
July:Mixed Emotions, Stephen O. Revay, CCC CFCC, President. July, pgs. 3-4.
August:What A Deal! Stephen O. Revay, CCC CFCC, President. Aug., pgs. 3-4.
September:Truly International, Stephen O. Revay, CCC CFCC, President. Sept., pgs. 3-4.
October:What If I Am Right? Stephen O. Revay, CCC CFCC, President. Oct., pgs. 3-4.
November:E-Mail Cumulative Impact, Stephen O. Revay, CCC CFCC, President. Nov., pgs. 3-4.
December:“The Times They Are A-Changin,” Stephen O. Revay, CCC CFCC, President. Dec., pgs. 3-4.