| MONDAY - June 30, 2008 |
|
|
Conference Room B |
Conference Room C |
Conference Room D & E |
Conference Room G |
Conference Room F |
Windsor West |
Windsor East |
Essex Ballroom |
Conference Room H |
| MON 8:00-9:20 |
KEYNOTE SESSION - David K. Foot, Speaker |
| MON 9:25-9:55 |
COFFEE BREAK (Exhibit Hall) |
| MON 10:00-11:00 |
CDR.01 |
PS.01 |
EST.01 |
COM.01 |
ADV.S01 |
TCM.01 |
DEV.01 |
SK.01 |
SOFT.01 |
|
(Panel Discussion) The Claims Business Practice Forum
 Mr. Kenji P. Hoshino PSP CFCC; Mr Frank J Giunta PE; Mr.
John C. Livengood PSP CFCC; Mr James G Zack Jr CFCC; Dr Anamaria I Popescu PE |
Business Rules in CPM Scheduling Software
 Mr. Abhimanyu Basu PE PSP |
10 Cents on Estimating
 Mr. Barrett L Richards CCC PSP |
(Presentation) Technical Board Overview
 Mr. Larry R Dysert CCC |
Damage Control: Covering Your Assets
 Mr. Thomas
C. Hoffman; Mr. Nathan Florio; Mr. Steven Gottlieb |
Managing Large Complex Projects and the Role of Project
Controls
 Mr. George B. Bradshaw PE CCE |
Project Controls Professional Development Program at
Parsons
 Mr. Michael R. Nosbisch CCC PSP; Ms. Andrea Bach |
Skills and Knowledge of Cost Engineering: Estimating
 Mr.
Charles P. Woodward PE CCESK |
Software Showcase: Cost Data |
| Room host: |
|
|
|
|
|
|
|
| MON 11:10-12:10 |
CDR.02 |
PS.02 |
EST.02 |
CSC.01 |
ADV.02 |
TCM.02 |
DEV.02 |
SOFT.02 |
|
Using the Contemporaneous Period Analysis During
Projects
 Mr. Mark F. Nagata PSP; Mr Brian Furniss |
Schedule Design Planning for Schedule Development
 Mr. Christopher W Carson PSP; Mr Patrick M. Kelly |
Reviewing Change Orders 101
 Mr. Brian S. Clare CCC |
The Project Controls Maturity Model
 Mr. H. Lance Stephenson CCC |
Complex Urgency: Recovering from Katrina and Wilma

Dr. Randy R. Rapp PE CCE |
Linking the Estimate, the Schedule and the Cost Control
through a Standardized WBS
 Ms. Marie Helene Biffi P.Eng |
(Panel
Discussion) Costs and Benefits of Building Green (Sponsored by the AACE
Women in Project Controls Taskforce)

Ms. Alexia A Nalewaik CCE; Ms. Valerie G Venters CCC |
Software Showcase: Deltek |
| Room host: |
|
|
|
|
|
|
|
|
| MON 12:15-1:45 |
INTERNATIONAL LUNCHEON - Mr. Adesh Jain, M. Eng CPP MPD, Speaker |
| MON 1:50-2:50 |
CDR.03 |
PS.03 |
EST.03 |
CSC.02 |
BIM.01 |
TCM.03 |
DEV.03 |
SK.02 |
SOFT.03 |
|
Put Some Punch in Your Pen
 Mr. Jeffery L. Ottesen PE PSP CFCC |
(Panel Discussion) The Great Debate III: Who Owns Float?

Mr. Edward E Douglas III CCC PSP; Mr. Donald F McDonald
Jr. PE CCE PSP; Mr. Ronald M. Winter PSP; Mr. Timothy T. Calvey PE PSP; Mr. Michael R.
Nosbisch CCC PSP |
An Introduction to Parametric Estimating
 Mr. Larry R Dysert CCC |
Integrating SAP with the Project Execution Platform -
Was it Worth it?
 Mr. Wayne M. Ushijima |
Scheduling, Estimating, and BIM: A Profitable
Combination
 Ms. Tamera Lee McCuen |
What is Project Portfolio Management?
 Dr. Parviz F. Rad PE CCE; Dr Ginger Levin |
The Seven Secrets of Speaking Like a Project Controls
Leader!
 Mr. Rohit Singh P.Eng CCE |
Skills and Knowledge of Cost Engineering: Planning and Scheduling
 Ms. Vera A. Lovejoy CCE PSP |
Software Showcase: Skire |
| Room host: |
|
|
|
|
|
|
|
| MON 2:55-3:20 |
COFFEE BREAK (Exhibit Hall) |
| MON 3:25-4:25 |
CDR.04 |
PS.04 |
EST.04 |
CSC.03 |
BIM.02 |
TCM.04 |
DEV.04 |
SK.02 continued |
SOFT.04 |
|
Risk Review of Recovery Schedules
 Mr. John J Ciccarelli PE CCE PSP; Mr Matthew Murch |
Update on RDM 2007
 Mr. Fredric L. Plotnick PE |
A Practical Application of Monte Carlo Simulation in
Forecasting
 Mr. James D Whiteside II PE |
Total Float Management: Renovating a Misused and Abused
Approach
 Dr. Anamaria I Popescu PE; Mr. John Jerz |
CAD Automation - Establishing Best Practices
 Mr. Peter R Bredehoeft JR; Mr. Rob Brawn |
Using the TCM Framework for Consistency and
Comparability of Various Types of Environmental Cost Estimates
 Mr. Gordon Lee Ballentine; Ms Amy Gignac |
(Panel Discussion) Open Forum on ICEC and United Nations
Programs
 Mr. Murtala Ayodeji Oladapo; Dr Kenneth K.
Humphreys PE CCE |
Software Showcase: Humphreys &
Associates |
| Room host: |
|
|
|
|
|
|
| MON 4:35-5:00 |
CDR.05 |
PS.05 |
EST.05 |
CSC.04 |
BIM.03 |
TCM.05 |
SOFT.05 |
|
The Measured Mile - A Better Way Of Utilizing An Old
Tool
 Mr. Glen R Palmer PSP |
Linear Scheduling Fundamentals for Cost Engineers
 Ms. Carla Lopez del Puerto CCC; Dr Douglas
D. Gransberg PE CCE |
What is the U.S. Gulf Coast Baseline when Estimating
Site Productivity?
 Mr. Bruce E. Bradley |
Increasing Field Use of Planning, Scheduling and Project
Cost through Assessed Training Programs
 Dr. Daphene Cyr Koch |
Leveraging the Power of 4D Models for Analyzing and
Presenting CPM Schedule Delay Analyses
 Mr. Kevin T. Coyne PE PSP |
Project Coding Conundrum as it Relates to Project
Controls, A Study of EPC Project/s in Canada
 Mr. Tanveer Nabi Ahmed CCE; Mr Peter D George; Mr Schalk
W van Heerden; Dr Janaka Y Ruwanpura |
Software Showcase: PMSI |
| Room host: |
|
|
|
| MON 5:10-5:35 |
CSC.05 |
TCM.06 |
DEV.05 |
|
Influence of Quality on Construction Costs
 Dr. John A. Kuprenas PE |
The Process of Knowledge Transfer and Its Significance
in Integrated Environments
 Dr. Champika Liyanage; Dr Qiuping Li; Dr Taha Elhag; Dr
Tabarak Ballal |
Are We Really a Teflon Coated Profession?
 Mr. Peter Cox |
| Room host: |
|
|
|
|
|
|
|
|
| MON 5:45-6:45 |
COM.02 |
COM.14 |
COM.04 |
COM.05 |
COM.06 |
COM.07 |
DEV.14 |
INT.01 |
SOFT.06 |
|
Claims and Dispute Resolution Committee Meeting (1)
 Mr. John C. Livengood PSP CFCC; Mr. Thomas F. Peters PE
CFCC |
Academic SIG Meeting
 Mr. Peter W. Griesmyer |
Construction SIG Meeting
 Ms. Carla Lopez del Puerto CCC |
Project and Cost Control Committee Meeting
 Mr. Stephen M. Jacobson CCC |
Building Information Modelling Committee
 Mr. Philip D. Larson CCE PSP |
Decision and Risk Management Committee Meeting
 Mr. Michael W Curran |
The Role of Project Managers in Construction Industry Development
 Dr. Martyn James Hills; Dr. Paul William Fox; Dr. Martin Skitmore; Ms. Carol K.H. Hon;
Dr. Patrick Sik-Wah Fong |
Economic Internal Rate of Return (EIRR) Estimation in
Vietnam Hydro Power Project
 Mr. Li Kai; Dr Robert Tiong |
Software Showcase:
E-Builder |
| Room host: |
|
|
|
|
|
|
|
|
TUESDAY - July 1, 2008 |
|
|
Conference Room B |
Conference Room C |
Conference Room D & E |
Conference Room G |
Conference Room F |
Windsor West |
Windsor East |
Essex Ballroom |
Conference Room H |
| TUE 8:00-9:00 |
CDR.06 |
PS.06 |
EST.06 |
PM.01 |
EVM.01 |
INT.02 |
HPG.01 |
SK.03 |
SOFT.07 |
|
(Panel Discussion) The Great Debate: Concurrency vs.
Pacing - Slaying the Two-Headed Dragon
 Mr. John C. Livengood PSP CFCC; Mr. Thomas F. Peters PE
CFCC; Mr. Kenji P. Hoshino PSP CFCC |
The Problem With Hiring A Scheduler
 Mr. John P. Buziak PE |
Parametric Estimating for Environmental Remediation
Projects
 Ms. Angela R. Brunsman ICC; Mr. Kenneth F. Robson; Dr
Douglas D. Gransberg PE CCE |
Project Management, Cost Engineering, Project
Definition, Action Plans or What?
 Mr. Kul B. Uppal PE |
Earned Value Analysis - Why it Doesn't Work
 Mr. Joseph A Lukas PE CCE |
(Workshop) ICEC International Cost Model/Location Factor
Workshop/Rollout
 Mr. John K. Hollmann PE CCE |
Adaptation of Cost Estimating Validation Process (CEVP)
to a Major Urban Renewal Program
 Ms. Veronica Ruth Bergs P ENG; Mr John J Reilly PE |
Skills and Knowledge of Cost Engineering: Statusing for Progress and Forecasting Trends
 Dr. Joseph J. Orczyk PE CCE |
Software Showcase: Asst. Perf.
Networks |
| Room host: |
|
|
|
|
|
|
|
| TUE 9:05-9:35 |
COFFEE BREAK (Exhibit Hall) |
| TUE 9:40-10:40 |
CDR.07 |
PS.07 |
EST.07 |
PM.02 |
EVM.02 |
INT.03 |
HPG.02 |
SK.03 Continued |
SOFT.08 |
|
Causation - How is it Proved?
 Mr. James E Krebs PE CCE; Mr Michael J Reynolds |
When is the "Critical Path" Not the Most
Critical Path
 Mr. Murray Woolf |
If You Build It They Will Come - Making Project
Historical Data Useful
 Mr. John G. Musgrove PE |
Mega-Project Control: Effective Program, Project, and
WBS Granularity Decisions
 Mr. Paul Verveniotis PE |
Using EVM Performance Reports, Models, and Indices to
Identify Problems Early
 Mr. Gary Humphreys |
A Roadmap for the Contractor Bid Process - An Equipment
Manufacturers Perspective
 Dr. Iqbal Noor PE CCE; Mr Joe Martin PE; Mr. Alfred Carl
Hagen III; Mr Tariq Cheema |
Cost and Energy Tradeoff in the Lifecycle of
Construction Projects
 Dr. Jose Alberto Faria; Dr Yimin Zhu CCE; Dr Tulio
Sulbaran |
Software Showcase: Primavera |
| Room host: |
|
|
|
|
|
|
|
| TUE 10:50-11:15 |
CDR.08 |
PS.08 |
EST.08 |
PM.03 |
EVM.03 |
INT.04 |
HPG.03 |
SOFT.09 |
|
Single-Line Critical Path Shift Analysis

Mr. Gordon R. Costa PSP CFCC |
Assessing Execution Planning on Oil and Gas
Mega-Projects
 Mr. Lloyd Kenneth Rankin; Dr George F Jergeas
P ENG; Mr Tim Slootman |
Escalation Estimation: Lessons Learned in Addressing
Market Demand
 Mr. John K. Hollmann PE CCE; Mr Larry R
Dysert CCC |
Managing Evidence Preservation at a Construction
Accident Site
 Mr. John R. Spittler PE; Mr. Robert B Brown
PE; Mr John F Lattyak PE |
ABC of Earned Value Application

Mr. Mark T Chen PE CCE |
Managing International Contract Administration

Mr. Niall Reynolds |
The Cost of Sustainable Development
 Mr. Timothy J Guarnieri |
Software Showcase: US Cost |
| Room host: |
|
| TUE 11:25-11:50 |
HPG.04 |
|
Understanding Green Building Cost and Value
 Mr. Tavis McAuley |
| Room host: |
|
|
|
|
|
|
|
|
| TUE 11:55-1:25 |
AWARDS LUNCHEON |
| TUE 1:30-2:30 |
CDR.09 |
PS.09 |
EST.09 |
PM.04 |
EVM.04 |
INT.05 |
IT.01 |
SK.04 |
SOFT.10 |
|
A Synthesis of Forensic Schedule Analysis Techniques
 Mr. J Scott Lowe; Mr. Mark F. Nagata PSP |
P5 to P-Sixes: Transition from P5 to P6
 Mr. J. Scott Palmer PE |
Estimating Preconstruction Services Fees for CM-at-Risk
Projects
 Dr. Douglas D. Gransberg PE CCE; Mr. Jeremy B. Carlisle
ICC |
Linking Project Controls Implementation Planning and
Project Success: The Northern Canadian Mining Projects Lessons
 Mr. Akinlolu Isaac Oni CCE |
Time is Money: Understanding the Root of All that is
Good and Evil in Construction
 Mr. Mike Debiak |
Estimating International Hydroelectric Projects
 Mr. Paul Martin Hewitt |
Designing a Cost/Schedule Application for Current Day
Project Execution
 Mr. Ian C. Simpson |
Skills and Knowledge of Cost Engineering: Change Management for EPC Contracting
 Mr. Donald F. McDonald Jr PE CCE PSP |
Software Showcase: Ontrack |
| Room host: |
|
|
|
|
|
|
|
|
| TUE 2:35-3:05 |
COFFEE BREAK (Exhibit Hall) |
| TUE 3:10-3:35 |
CDR.10 |
PS.10 |
PS.S05 |
PM.05 |
EVM.05 |
INT.06 |
IT.02 |
SK.04 Continued |
SOFT.11 |
|
The Eichleay Formula - Is Standby the Standard?
 Mr. Robert A Dieterle CCE |
Construction Scheduling: Keeping Relevance
 Mr. Amit Sarkar |
Project Planning Using Logic Diagramming Method
 Dr. Gui Ponce De Leon PE |
Validation - Success Key in Lump Sum Projects
 Mr. Madhu P. Pillai CCC |
Evolution of Performance Measurement Techniques
 Mr. Hasani Widemond EVP; Mr Amir Moore A |
Construction Labor Productivity in Developing Countries
 Dr. Enno Koehn PE; Mr C Reddy Guntuk; Dr. James F. Koehn |
Development and Implementation of Collaborative &
Integrated Cost Management Tools in a Global Energy Company
 Mr. Robert E Stein |
Software Showcase: ARES |
| Room host: |
|
| TUE 3:45-4:10 |
INT.07 |
|
Steel Construction Costs for Early Project Phases,
Germany
 Mr. Christopher Hagmann; Dr Christian Stoy; Ms Nannette
Terashima |
| Room host: |
|
|
|
|
|
|
|
| TUE 4:20-4:45 |
CDR.11 |
PS.11 |
EST.11 |
PM.06 |
EVM.06 |
INT.08 |
IT.03 |
Soft.12 |
|
Forensic Schedule Analysis: Example Implementation
 Mr. Mark C. Sanders PE CCE PSP |
Turnaround Planning
 Ms. Rashmi Prasad; Mr Mohammad Altaf |
Methodology for Calculating a Pipeline Repair Cost
 Dr. John R Shultz; Mr Jefferson Gordon Underwood;
Mr Richard J Denton |
Time is Money: Top Ten Targets for Improving
Construction Productivity
 Dr. Janaka Y. Ruwanpura;
Dr. George F. Jergeas P.Eng |
Summary Analysis of Earned Value Metrics in the
Department of Energy
 Dr. John R. Shultz; Mr Jefferson Gordon
Underwood; Mr. Richard J. Denton |
Making Investments in Russia. Mega-Projects: Cost
Deviation Factors (On Example of Sakhalin-2 Project)
 Mr. Aleksey V
Ferentsev |
Web-Based Electronic Tendering - UK Practical Experience
 Mr. Joseph L. N. Martin |
Software Showcase: Kildrummy |
| Room host: |
|
|
|
| TUE 4:55-5:20 |
EVM.07 |
INT.09 |
IT.04 |
|
Producing Earned Value from a Geographic Information
System where Scheduling Tools were Impractical
 Mr. Mark Buell |
Owner-CM-Contractor 'Silver Fox' Jump-Start SWAT Teams
 Mr. Earl T Glenwright JR PE PSP |
Improving the Tender Stage through Integrating
Collaborative Extranet with Project Integrated Databases
 Mr. Maher Ajam; Dr Mustafa Al Shawi; Dr. Toufic
Mezhe |
| Room host: |
|
|
|
|
|
|
r |
|
| TUE 5:30-5:55 |
COM.08 |
COM.13 |
COM.09 |
PM.12 |
COM.11 |
INT.10 |
DEV.06 |
COM.03 |
SOFT.13 |
|
Claims and Dispute Resolution Committee Meeting (2)
 Mr. John C. Livengood PSP CFCC; Mr. Thomas
F. Peters PE CFCC |
Transportation SIG Meeting
 Mr. Robert H. Harbuck, PE CCE |
Cost Estimating Committee Meeting
 Mr. Bernard A Pietlock CCC; Mr Douglas W Leo
CCC |
The Industry's Perspective on Workforce Planning for
Major Projects
 Mr Lloyd Kenneth Rankin; Mr. Tim Slootman; Dr. George F. Jergeas
P.Eng |
Earned Value Management Committee Meeting
 Mr. Robert A Marshall |
Project Management Approach of the European funds
2007-2013 for Romania
 Dr. Nicolae Postavaru |
The Update of the Certification Reference Material in
Estimation
 Mr. Didier Barrault |
Cost Engineering Committee Meeting
 Mr. John K. Hollmann PE CCE |
Software Showcase: Suncor Energy |
| Room host: |
|
|
| TUE 6:05-6:30 |
COM.10 |
DEV.07 |
|
Economic & Financial Analysis Committee Meeting
 Dr. Robert C Creese PE CCE |
An Investigation Into the Curriculum of the
Construction-Related Associate Degree in Hong Kong
 Mr. Eric Cheng |
| Room host: |
|
|
|
|
|
|
|
|
WEDNESDAY - July 2, 2008 |
|
|
Conference Room B |
Conference Room C |
Conference Room D & E |
Conference Room G |
Conference Room F |
Windsor West |
Windsor East |
Essex Ballroom |
Conference Room H |
| WED 8:00-9:00 |
CDR.12 |
PS.12 |
EST.12 |
PM.07 |
RISK.01 |
OWN.01 |
DEV.08 |
SK.05 |
SOFT.14 |
|
(Panel Discussion) Mock Arbitration of a Regional Light
Rail Construction Dispute
 Mr. Bryan Payne PE CCE CFCC; Mr Ghulam Mujtaba Shaikh;
Mr James B French; Mr W John Irwin II CFCC |
The Case for Construction Schedule Validation and
Auditing SVA
 Mr. Earl T Glenwright Jr PE PSP; Mr Aldo Dorea Mattos |
How Six Sigma Approach Solve Escalation Issue?
 Mr. Hee Kyu Kwon CCE |
Project Management Office (PMO) Principles in
Practice
 Mr. Jose Angelo Santos do Valle; Dr Wainer da Silviera e
Silvia; Dr Carlos Alberto Pereira Soares |
Knowledge-Based Proactive Project Risk Management
 Mr. James Arrow |
Owners - Make Your GMP Contract Work Effectively
 Mr. W. Doug Creech CCC |
Where Are All the Estimators???
 Mr. Jeff Bettinger; Mr Barrett L Richards CCC PSP |
Skills and Knowledge of Cost Engineering: Earned Value
 Dr. Sean T. Regan CCE; Mr. Chris A. Boyd CCE |
Software Showcase: Decision
Dynamics |
| Room host: |
|
|
|
|
|
|
|
| WED 9:05-9:35 |
COFFEE BREAK |
| WED 9:40-10:05 |
CDR.14 |
PS.13 |
EST.13 |
EVM.S04 |
RISK.02 |
OWN.02 |
DEV.09 |
SK.05 Continued |
SOFT.15 |
|
Delay Analysis Considering Dynamic Resource Allocation
and Multiple Baselines
 Dr. Tarek M Hegazy P ENG; Mr. Wail Menesi |
Schedule Acceleration - What, Why and How
 Mr. Sunu Mohan PSP EVP |
How to Perform a Location Factor Survey
 Ms. Aafje M. Jansen-Romijn |
EVM for World Class Project Controls
 Mr. Willem J. Viljoen ICC |
Trade-Off Economics in Refinery and Plant Turnarounds -
A Dynamic Decision-Making Model
 Mr. Jan A Jackson |
Recommended Ways to Reduce the Number of Change Orders
on School and Hospital Building Projects
 Ms. Jacqueline Therese
Doyle; Mr J Michael Molnar; Mr. Robert B Brown PE |
(Panel Discussion) Women in
International Business
 Dr. Anamarie Popescu PE and
Ms. Marlene Hyde CCE |
Software Showcase: EOS Group |
| Room host: |
|
| WED 10:15-10:40 |
PS.14 |
|
Advanced Scheduling Technology for Shorter Resource Constrained Project Durations
 Dr. Robert Richards |
| Room host: |
|
|
|
|
|
|
|
| WED 10:50-11:50 |
CDR.13 |
COM.12 |
EST.14 |
PM.09 |
RISK.03 |
OWN.03 |
DEV.10 |
SOFT.16 |
|
Primavera Project Management Software and the Claims
Consultant
 Ms Anne Marie Tombros; Mr Sunu Mohan PSP EVP |
Planning and Scheduling Committee Meeting
 Mr. Edward E Douglas III CCC PSP; Mr. Timothy T. Calvey
PE PSP; Mr. Ronald M. Winter PSP |
Unit Price Estimation in Division 1 to 16 Format Using
MS Excel and/or MS Access Database
 Mr. Indirakumar Sinnathamby |
Does Standard Project Management Data Provide Useful
Information for Portfolio Management Review and Decision Making?
 Mr. Caoimhin Ardren |
Range Estimating - The Implications!
 Mr. William E. Maddex |
Change Management During FEED - Owner's Case Study
 Mr. Vijay S. Jambhekar; Mr. Stephen D. Weeks |
Project Controls: A Roadmap to a Choice Career

Ms. Nyssa-Dawn Amelinda Corria-Simpson; Mr. Bernd R.
Langer; Ms Pamela Handor |
Software Showcase: Hard Dollar |
| Room host: |
|
|
|
|
|
|
|
|
| WED 11:55-12:55 |
LUNCH ON YOUR OWN |
| WED 1:00-1:25 |
CDR.15 |
PS.15 |
EST.15 |
PM.10 |
RISK.04 |
OWN.04 |
DEV.11 |
BIM.04 |
SOFT.17 |
|
The Use of Forensic Animations in Resolving Complex
Disruption Claims - A Case Study
 Mr Keith Pickavance |
RP 53R-06, Schedule Update Review
 Mr. Ronald M. Winter PSP |
Distinguish the difference between Parametric Estimating
and Factored Estimating and how they relate to cost and proposals
 Mr. Warren Charles Tasca |
Evaluating Best Practices for Oil Sands Projects
 Mr. James Peter Lozon P.Eng; Dr. George F. Jergeas P.Eng |
Danish Infrastructure Projects New Budgeting Method - A
Rational Process to Manage Political Decisions
 Mr. Djon Lind Andersen |
Impact Costs Litigation in Montreals
Mega-hospitals
 Dr. Jean-Claude Huot PE |
The International Cost Engineering Council (ICEC) &
the Global Demand for Cost Engineers
 Dr. Peter Vincent Smith |
Building Information Modeling (BIM) in Construction:
Benefits, Risks and Challenges
 Dr. Salman Azhar |
Software Showcase |
| Room host: |
|
|
|
| WED 1:35-2:00 |
EST.16 |
RISK.06 |
BIM.05 |
|
Historical Construction Cost Database and their
Application
 Mr. Selvanayagam Assiskumar |
The Implications of Cost and Risk Management for
Equipment Manufacturing
 Mr. Behnad Sarlak |
The Construction of Project Cost Information Management
System in China Electric Power Industry
 Ms. Huiping Zhu |
| Room host: |
|
|
|
|
|
|
|
|
| WED 2:10-2:35 |
CDR.16 |
PS.16 |
EST.17 |
PM.11 |
CDR.S06 |
OWN.02 |
DEV.12 |
INT.11 |
SOFT.18 |
|
Use of Relational Databases in Forensic Delay Analysis
 Mr. Faik Burak Evrenosoglu CCE PSP |
Schedule Constructability Review
 Mr Edward E Douglas III CCC PSP |
Factors Affecting Contingency Determination
 Dr. Ali Ali Shash; Mr. Fahad Mohammed Al-Azzaz CCE |
Promoting Power Plant Construction Project Productivity
 Dr. Johannes E Picard; Mr John Hutcheson |
Errors and Omissions Damage Claims
 Mr. Joseph W. Wallwork PE CCE PSP CFCC |
Five Simple Steps to Better Capital Planning
 Mr. Bruce A. Lower |
The Role of the Estimator in Today's Construction
Industry
 Mr. Steve J Rajpatty |
Methodology for Field Appropriation of
Detailed Estimates
 Mr. Paulo Roberto Vilela; Mr.
Orlando Celso Longo |
Software Showcase |
| Room host: |
|
|
|
|
| WED 2:45-3:10 |
EST.18 |
CSC.06 |
DEV.13 |
INT.12 |
|
A Few Good Cost Estimators
 Mr. Gregory Nelson McDowell CCC |
Discussion on Preparation and Control of Construction
Cost of Hydro Power Projects
 Mr. Xinmin Shi |
The Pillars of Quantity Surveying for a Learned Society
 Dr. J.J.P. Verster; Ms. Benita G Kotze; Dr. A.C.
Hauptfleisch |
Procurement Challenges in the UK Oil and Gas Sector
 Dr. M. Fadhil Mohammad; Dr. Andrew Price |
| Room host: |
|
|
|
|
|
|
|
|
| WED 3:20-4:00 |
GREAT GIVE-AWAY |