Login  Forums  Members Only Services  Advertising  Contact Us  Site Keys  Home
Women in Project Controls
 home > technical > professional practice guides

Professional Practice Guides (PPGs)
The AACE International Professional Practice Guides (PPGs) are reference CDs containing the most worthwhile existing contributions by AACE members and committees to the advancement of total cost management. They are intended to be comprehensive, well organized, and timely. PPG content consists of selected Cost Engineering articles, AACE International Transactions papers, and other previously published documents to which AACE has rights.

Currently, the following PPGs have been published:


(All PPGs may be ordered through our online bookstore.


PPG #1: Contracts and Claims, 4th edition (CD)
James G. Zack, Jr., Editor, AACE International, 2008

Covers: Contract Administration; Management of Construction Schedules; Schedule Control; Schedule Float Ownership; Cost Control; Management of Change; Cost Impacts; Productivity Impacts; Management and Analysis of Delay; Concurrent Delay Issues; Pricing of Delay; Mitigation of Claims; Documentation and Claims Management; Claim Recognition and Analysis; Claims Management; Negotiation Process; Alternative Dispute Remedy Process; Litigation and the Cost Engineer; and Project Audits.

View Table of Contents Adobe Acrobat Document


PPG #2: Risk, 2nd edition (CD)
Kenneth D. Brienzo PE, Editor, AACE International, 2007

CDictionary; Capital Investments; Cash Flow; Competitive Bidding; Contingency Analysis; Contracts; Cost Engineering; Decision Analysis; Economic Analysis; Escalation; Human Factors; Manufacturing; Research & Development; Safety & Health; Schedule; Technological Risk; and Value Engineering

View Table of Contents Adobe Acrobat Document


PPG #3: Cost Engineering in Aerospace and Aviation (CD)
Sarwar A. Samad, Editor, AACE International, 1998

Covers: Aerospace, and Aviation.

View Table of Contents Adobe Acrobat Document


PPG #4: Planning and Scheduling, 2nd edition (CD)
Trevor X. Crawford CCC, Editor, AACE International, 2006

Covers: Planning; Schedule Development; Schedule Management/Control; and Classics.

View Table of Contents Adobe Acrobat Document


PPG #5: Earned Value, 2nd edition (CD)
Robert A. Marshall, Editor, AACE International, 2007

Covers: Why Use Earned Value?; Basics of Earned Value; Cost/Schedule Control System Criteria; Actual Physical Percent Complete; Productivity and Earned Value; Earned Value Reporting; Applications of Earned Value Project Management; Earned Value and Loss of Productivity Claims; and Additional Information on Earned Value Management.

View Table of Contents Adobe Acrobat Document


PPG #6: Construction Cost Estimating, 2nd edition (CD)
Douglas D. Gransberg PE CCE and Carla Lopez del Puerto CCC, Editors, AACE International, 2006

Covers: Recommended Practices; Estimating Theory; Conceptual, Parametric, and Range Estimating; Estimating Factors and Indices; Estimating Material Costs and Quantity Surveying; Estimating Labor Costs; Estimating Equipment Costs; Subcontracting Costs; Estimating Overhead and Indirect Costs; Profit, Contingencies, and Mark-Ups; Estimating International Construction Costs; Heavy Civil Project Estimating; Estimating Specialty Projects; Scheduling Input to the Estimate and Change Orders; Bidding Decisions; and Computer Applications to Construction Cost Estimating.

View Table of Contents Adobe Acrobat Document


PPG #7: Cost Engineering in the Utility Industries, 2nd edition (CD)
Dennis M. Thompson, Editor, AACE International, 2007

Covers: Auditing, Cost Estimating, Cost Modeling, Cost/Schedule Control, Generation Power Plant, Natural Gas Industry, Nuclear Power Plant, Other Energy Related Topics, Planning and Scheduling, Project Management, Utility Rates, and Utility Property Valuation.

View Table of Contents Adobe Acrobat Document


PPG #8: Contingency, 3rd edition (CD)
Kul B. Uppal PE, Editor, AACE International, 2010

Covers: General Topics On Contingency; Cost Estimating and Contingency; Risk Analysis and Contingency; Other Related Topics; and AACE International Recommended Practices..

View Table of Contents Adobe Acrobat Document


PPG #10: Project Delivery Methods, 2nd edition (CD)
Douglas D. Gransberg PE CCE, Tammy L. McCuen, and Keith Molenaar, Editors, AACE International, 2008

Covers: Design-Bid-Build (DBB) – DBB Estimating, DBB Scheduling, DBB Project Management; Construction Management (CM) – CM Estimating, CM Scheduling, CM Project Management; Design-Build (DB) – DB Estimating, DB Scheduling, DB Project Management; International Project Delivery; Constructability; and Partnering.

View Table of Contents Adobe Acrobat Document


PPG #11: Environmental Remediation and Decommissioning, 2nd edition (CD)
Richard A. Selg CCE, Editor, AACE International, 2009

Covers: Environmental Remediation Planning and Scheduling Methodology; Cost Estimating, Project Controls, Cost Modeling, and Reporting; Contingency Management, Risk Analysis, and Environmental Regulations; Benchmarking and Lessons Learned; Economics of Environmental and Waste Management; Cost-Effective Waste Minimization and Pollution Prevention; Design, Construction Practices, and Other Related Topics; Standardized Approach to Estimating Decommissioning Cost; Decontamination and Decommissioning Estimating Approaches; Development of Decontamination and Decommissioning Cost Estimating Models; and Decontamination and Decommissioning Estimating Issues and Challenges.

View Table of Contents Adobe Acrobat Document


PPG #12: Construction Project Controls (CD)
Douglas D. Gransberg PE CCE, and James E. Koch, Editors, AACE International, 2002

Covers: Introduction to Construction Project Controls; Cost Control; Schedule Control; Quality Control; Document Control; Computer Applications; and International Project Controls

View Table of Contents Adobe Acrobat Document


PPG #13: Parametric and Conceptual Estimating, 2nd edition (CD)
Douglas W. Leo CCC, Larry R. Dysert CCC, and Bruce Elliott CCC, Editors, AACE International, 2004

Covers: Parametric/Conceptual Estimating Overview; Estimate Classification; Parametric/Conceptual Estimating Methodology; Capacity Factoring; Parametric/Conceptual Estimating in the Process Industries;  Parametric/Conceptual Estimating in the Non-Process Industries; and Parametric/Conceptual Estimating Systems

View Table of Contents Adobe Acrobat Document


PPG #14: Portfolio and Program Management, 2nd Edition (CD)
Randy R. Rapp PE CCE, Editor, AACE International, 2007

Covers: Enterprise Management: General Imperatives and Concerns; Asset Requirements Elicitation and Analysis; Asset Planning and Investment Decision-Making; Asset Performance Assessment and Change Management; and Program Management.

View Table of Contents Adobe Acrobat Document


PPG #15: Life-Cycle Cost Analysis (CD)
Carla Lopez del Puerto CCC, and Dr. Douglas D. Gransberg PE CCE, Editors, AACE International, 2007

Covers: Life-Cycle Cost Theory; Life-Cycle Cost Calculation Methods; Determining Discount Rate; Estimating Capital Cost of Design and Construction; Estimating Operations Costs; Estimating Salvage/Residual Value; Estimating Sustainability; Life-Cycle Cost Risk Analysis; Life-Cycle Cost Case Studies; and Life-Cycle Cost Analysis in the International Context

View Table of Contents Adobe Acrobat Document


PPG #16: Cost Engineering in the Global Environment (CD)
Kul B. Uppal PE, Editor, AACE International, 2007

Covers: General Topics on International Projects; Applicable AACE International Recommended Practices; Cost Estimating Methodology; Risk and Contingency; and Miscellaneous Topics

View Table of Contents Adobe Acrobat Document


PPG #17: Public Sector Estimating (CD)
Joseph L. Macaluso CCC, Editor, AACE International, 2007

Covers: Basis of Estimates; Labor Costs; Overhead and Profit; Soft Costs; Bid/Estimate Reconciliation; and Change Orders

View Table of Contents Adobe Acrobat Document


PPG #18: Green Building (CD)
Joseph L. Macaluso CCC, Editor, AACE International, 2008

Covers: Recognition of Affects and Economic Costs on the Environment; Formulating Ways of Addressing Green Building Strategies and Associated Economic Costs; Specific Green Building Strategies and Project Costs; Budgeting and Justifying the Cost Sustainable Practices; Evaluating Competing Sustainable Strategies: Using Value Engineering; Evaluating Competing Sustainable Strategies: Other Techniques.

View Table of Contents Adobe Acrobat Document


PPG #19: Leadership and Management of People (CD)
John J. Jannon CEP, Editor, AACE International, 2008

Covers: Leadership; Teams; Leadership Roles; Motivation; and Ethics.

View Table of Contents Adobe Acrobat Document


PPG #20: Forensic Schedule Analysis (CD)
James G. Zack, Jr. CFCC, Editor, AACE International, 2008

Covers: Recommended Practice No. 29R-03 Forensic Schedule Analysis; Synopsis of Recomended Practice; Basics of Schedule Delay Analysis; MIP-Observational/Static/Gross; MIP-Observational/Static/Perodic; MIP-Observational/Dynamic/Contemporaneious As-is; MIP-Observational/Dynamic/Contemporaneous/Split; MIP-Observational/Dynamic/Modified or Recreated; MIP-Modeled/Additive/Single Base; MIP-Modeled/Additive/Multiple Base; MIP-Modeled/Subtractive/Single Simulation; Non-CPM Schedule Delay Analysist Techniques; and General Schedule Analysis Articles.

View Table of Contents Adobe Acrobat Document


PPG #21: Cost Engineering in the Process Industries
Kul B. Uppal, PE CEP, Editor, AACE International, 2009

Covers: General Topics on Process Industries; Cost Estimating Methodology; Project Management; International Projects; Scheduling; Construction Activities; Risk Management; Project Controls; and Applicable AACE International Recommended Practices..

View Table of Contents Adobe Acrobat Document


AACE International

Advertisements:
Login |  Membership |  Technical |  Education |  Certification |  About Us |  Corporate Sponsorship |  Resources |  Career Center |  Annual Meeting |  Forums |  Contact |  Home