Presentation Slides from AACE International's 2006
Annual Meeting, held in Las Vegas, Nevada, June 19-22, 2006
|
Please Note:
Only AACE
International Members can view these slides. You will need your user name and password.
|
ADV.03: Challenges of Post Disaster Contingency
Operations
by Dr. James Edward Koch PE
Presentation Slide Format
Handout Format
|
|
ADV.05: Economic Benefit of Natural Disaster Mitigation
by Jason Van Howell CCE
Presentation Slide Format
Handout Format
|
|
CDR.02: The Claims Consultant as a Peacemaker
by Dr. George F. Jergeas P ENG and Stephen O. Revay CCC
Presentation Slide Format
Handout Format |
|
CDR.05: Displaying Complex Technical Data
by John Potter, PSP
Presentation Slide Format |
|
CDR.07: Quantification of Damages
by John J. Ciccarelli, PE CCE
Presentation Slide Format |
|
CDR.19: The Link Between Planning and Programming Practice and the Analysis of Delay and Disruption Claims
by Nuhu Braimah, Dr. Issaka Ndekugri and Paul Olomolaiye
Presentation Slide Format
Handout Format |
|
CDR.20: Delay Analysis Considering Productivity
by Dr. Jae-Seob Lee
Presentation Slide Format
Handout Format |
|
CSC.01: Relentless Trending - Key to Effective Cost &
Schedule Management
by Nelson E. Bonilla CCE
Presentation Slide Format
Handout Format |
|
CSC.02: Revitalizing Project Controls: A Roadmap to Excellence
by Christopher F. Michalak and H. Lance Stephenson
Presentation Slide Format
Handout Format |
|
CSC.03: Change Management for Today's Projects - A Process
Approach
by Stephen E. Goodman
Presentation Slide Format |
|
CSC.04: Construction Audit - An Essential Project Controls
Function
by Alexia A. Nalewaik CCE
Presentation Slide Format
Handout Format |
|
CSC.05: The Cumulative Effect of Change
by Bob M. McCally
Presentation Slide Format
Handout Format |
|
CSC.12: A Study of Advanced Project Control System for Korean
Nuclear Power Plant Construction Project
by Myung Youl Yoon and Jae Hee Han
Presentation Slide Format
Handout Format |
|
DEV.01: Core Competencies, Expectations, and Career Path for an
Estimating Professional
by John K. Hollmann PE CCE and Bruce G. Elliott CCC
Presentation Slide Format
Handout Format |
|
DEV.03: Development and Training of the Planning and Scheduling
Professional
by Edward E. Douglas III CCC PSP
Presentation Slide Format
Handout Format |
|
DEV.05: A Study of How Cost Engineers Think
by Oliver W. Houseman, Fiona Coley and Dr. Rajkumar
Roy
Presentation Slide Format
Handout Format |
|
EST.01: Is "Estimate Accuracy" an Oxymoron?
by Larry R. Dysert CCC
Presentation Slide Format
Handout Format |
|
EST.02: China Learnings
by Bernard A. Pietlock CCC
Presentation Slide Format
Handout Format |
|
EST.03: Bad Estimates Just Don't Happen
by Joseph A. Lukas PE CCE
Presentation Slide Format
Handout Format |
|
EST.05: Estimate Plans Start to Finish
by Lawrence W. Louie PE and Mark Balcezak
Presentation Slide Format
Handout Format |
|
EST.06: Increasing Steel Price Effect On Equipment Price
by Laura Mayo and Raisa Nuriyeva
Presentation Slide Format
Handout Format |
|
EST.07: So - Is this the Estimate?
by Kul B. Uppal PE
Presentation Slide Format
Handout Format |
|
EST.11: Choose Your Weapon (Selecting Estimating Tools and
Databases)
by Todd Pickett CCC
Presentation Slide Format
Handout Format |
|
EST.13: Historical Data Practices of Construction Contractors
by John Jeffrey Hannon
Presentation Slide Format |
|
EST.15: Estimate Reconciliations
by Barrett L. Richards CCC PSP
Presentation Slide Format
Handout Format |
|
EST.16: Scope Definition for Expanding Operating Projects
by Amitab Sharma CCE and Chitram Lutchman
Presentation Slide Format
Handout Format |
|
EST.17: How Accurate Are Your Estimates?
by Dan E. Schottlander CCE
Presentation Slide Format
Handout Format |
|
EST.20: Estimating Design Fees for Transportation Projects
by Carla Lopez del Puerto ICC, Dr. Douglas D. Gransberg
PE CCE and Kenneth F. Robson
Presentation Slide Format
Handout Format |
|
EVM.05: Deploying an Earned Value Management System
by Andrea Bach
Presentation Slide Format
Handout Format |
|
EVM.09: Don't Create Variances During Planning
by Leah V. Zimmerman CCC PSP
Presentation Slide Format
Handout Format |
|
IT.01: Estimating in 3D: The Next Dimension
by Aziz E Barmania and Leslie E McMullan
Presentation Slide Format
Handout Format |
|
OWN.01: Financial Administration of Construction Contracts by
Owners
by W. Doug Creech CCC
Presentation Slide Format
Handout Format |
|
OWN.02: Estimating at Owner Companies
by Waymon D. Lofton
Presentation Slide Format |
|
OWN.05: Bid Preparation Using Cost Templates and Range
Estimating - An Equipment Manufacturer's Perspective
by Dr. Iqbal Noor PE CCE, Matthew Grumo, Matthew
W. Kniskern and Andrew Kopach
Presentation Slide Format
Handout Format |
|
PM.01: How to Create a World Class Project Management
Organization
by Nick J Lavingia PE
Presentation Slide Format
Handout Format |
|
PM.02: Attracting and Retaining Project Resources
by Stephen L. Cabano
Presentation Slide Format
Handout Format |
|
PM.05: Performance Management - Making It Work
by Gary Cokins
Presentation Slide Format |
|
PM.07: "Root Causes": The Six Reasons for CHANGE
by Robert L. Tichacek PE
Presentation Slide Format
Handout Format |
|
PM.09: The "Cool Hand Luke" Theory of Project
Communication
by William E. Kraus PE CCE
Presentation Slide Format |
|
PM.12: Authentic Community Concept Applied to A/E/C
by John Jeffrey Hannon
Presentation Slide Format |
|
PM.13: The Beach Boys Historical Landmark Project
by Harry W. Jarnagan PE CCE
Presentation Slide Format
Handout Format |
|
PS.02: The Great Negative Lag Debate
by Edward E. Douglas III CCC PSP, Timothy T. Calvey
PE PSP, Donald F. McDonald Jr. PE CCE PSP, Ronald M. Winter PSP and Glen R. Palmer PSP
Presentation Slide Format
Handout Format |
|
PS.03: Applying Trapezoidal Technique in Resource Management
by Mark T Chen PE CCE
Presentation Slide Format
Handout Format |
|
PS.04: Schedule Analysis Indices
by Dr. Gary Rock Spencer PE and Rose Mary Lewis PE
Presentation Slide Format
Handout Format |
|
PS.06: Claims Analysis Nested in Schedule Updates
by Christopher Willis Carson
Presentation Slide Format
Handout Format |
|
PS.08: RDM - Relationship Diagramming Method
by Fredric L. Plotnick PE
Presentation Slide Format
Handout Format |
|
PS.09: Scheduling: The Good, the Bad and the Ugly
by H. Lance Stephenson CCC
Presentation Slide Format
Handout Format |
|
PS.10: Making CPM More Transparent
by Ronald M. Winter PSP
Presentation Slide Format
Handout Format |
|
PS.13: Effective Construction Work Packages
by George Richard Gardner
Presentation Slide Format
Handout Format |
|
PS.15: Predicting Construction Duration of Building Projects
by Theresa Burrows and Joseph L. N. Martin
Presentation Slide Format
Handout Format |
|
PS.18: Scheduling Specifications for the 21st Century
by Paul Levin
Presentation Slide Format
Handout Format |
|
PS.20: Project Planning and Scheduling and its Impact to
Project Outcome - A Study of EPC Project/s in Canada
by Dr. Janaka Y. Ruwanpura, Tanveer Nabi Ahmed and Gerald Mulvany
Presentation Slide Format
Handout Format |
|
PS.21: CPM Not Working Well On Small Projects
by Albert Joseph Kuhn PSP
Presentation Slide Format
Handout Format |
|
RISK.01: Using PRISM to Quantify Qualitative Data
by Dr. Flynn L. Auchey PE and Dr. Gloria J. Auchey
Presentation Slide Format
Handout Format |
|
RISK.02: Project Risk Management Using Monte Carlo Simulation
by Mohamed Khedr
Presentation Slide Format
Handout Format |
|
RISK.05: Significance of WBS in Contingency Modeling
by John Gengxin Zhao
Presentation Slide Format |
|
SK.01 & SK.02: Skills & Knowledge of Cost Engineering: Cost Estimating
by Charles P Woodward PE CCE
Presentation Slide Format
Handout Format |
|
SK.05 & SK.06: Skills & Knowledge of Cost Engineering: Earned Value
by Marlene M. Hyde CCE
Presentation Slide Format
Handout Format |
|
TCM.01 & TCM.02: The Total Cost Management (TCM) Framework
by John K. Hollmann PE CCE and Wesley R. Querns CCE
Presentation Slide Format
Handout Format |
|