Log InForumsContactSite MapHome
AACE International
 
 home < annual meeting < technical program < authors

Technical Program Authors
The following individuals are scheduled to present at this years meeting:

(Subject to change.)

 

NameTrackTimeLocation TitleAll Authors/Presenters (Primary authors are listed first)
AbdullahPM.09WED 8:00-9:00Wallingford (3rd Floor)Setting Up a Project Management Office - Public Sector EnvironmentMr Habib Abdullah P Eng
AibinuCDR.S02WED 11:00-12:00Issaquah (3rd Floor)Reducing Dispute in Construction Claims: The Role of Decision-making ProcessDr Ajibade Ayodeji Aibinu
AlexanderEST.11WED 8:00-9:00Grand A Ballroom (2nd Floor)Historical Lessons for Today: How the Savings and Loan Crisis Affected the US Construction SectorMr Basil P Alexander Esq; Mr. Fred J. Saldana III PSP; Mr John E Mauk
AlkassBIM.04MON 11:15-12:15Diamond (1st Floor)Constructability Assessment using BIM/4D CAD Simulation ModelMr Wissam Hijazi; Dr Sabah Alkass P Eng; Dr Tarek Zayed
AminiPS.04MON 3:45-4:45Aspen (2nd Floor)Schedule Compression for Construction Projects by Interruption in LOB SchedulingDr Gholamreza Heravi; Mr Seyyed Mohammad Amini
AnantatmulaPM.02MON 11:15-12:15Issaquah (3rd Floor)Attributes of a Harmonious Project TeamDr Parviz F Rad PE CCE; Dr. Vittal S. Anantatmula
AnantatmulaPM.S02MON 3:45-4:45Issaquah (3rd Floor)Characteristics of a Project- Friendly EnterpriseDr Parviz F Rad PE CCE; Dr. Vittal S. Anantatmula
AndersonCDR.14WED 1:15-2:15 Willow A (2nd Floor)Impacts to Labor Productivity in Framing, Drywall and Taping TradesDr. Gerald H Williams PE; Dr. Timothy R Anderson
AnzideiCDR.01MON 10:00-11:00Willow A (2nd Floor)Will Courts Adopt AACE Forensic Schedule Analysis RP: 29R-03?Mr Christopher J Brasco Esq; Mr Christopher Michael Anzidei
AvalonCDR.06TUE 9:45-10:45Willow A (2nd Floor)"The New Modeled, Subtractive, Multiple Base MIP 3.9 Forensic Schedule Analysis Protocol"Mr Andrew Avalon PE PSP; Mr. Ronald J. Rider
BallentineTCM.04MON 3:45-4:45Willow B (2nd Floor)"Using the TCM Framework to Increase the Quality, Objectivity, Transparency, and Reproducibility of Risk Analyses"Mr Derek Michael Ladd; Mr Darwin L Nelson PE; Mr. Gordon Lee Ballentine
BarnhartPS.13WED 9:45-10:45Aspen (2nd Floor)Schedule Collaboration on Mars Science Laboratory with Multi-Users and Tools (Sponsored by WPC)Ms Julie K Owen PSP CCC; Mr Thomas Barnhart
BenninkCDR.02MON 11:15-12:15Willow A (2nd Floor)AACE International Recommended Practices in Action: A Case StudyMr John J Ciccarelli PE CCE PSP; Mr Michael J Bennink PE CCE PSP
BerendsRISK.S02TUE 1:45-2:45Issaquah (3rd Floor)Risk Base Estimate Self- ModelingDr Ovidiu Cretu PE; Mr. Terry Berends PE
BettingerDEV.04WED 8:00-9:00Diamond (1st Floor)The Talent Vacuum -- Keeping Your Best Talent in a DownturnMr Jeffrey Bettinger; Ms Shayna Lynn Brown
BolyardRISK.04TUE 11:00-12:00Issaquah (3rd Floor)Applying Risk Management to Project Performance Mr Sagar B Khadka PSP; Mr. Charles E Bolyard, Jr. PSP CFCC
BornePM.08TUE 1:45-2:45Diamond (1st Floor)"Quality Control, Assurance and Verification in Service and Construction Contracts"Mr. Terry L Borne PE CCE
BorowiczOWN.03WED 8:00-9:00Willow B (2nd Floor)A Method for Developing a Truly Effective Construction Wage RateMr Jeffery J Borowicz CCC PSP
BradleyEST.01MON 10:00-11:00Grand A Ballroom (2nd Floor)The Professional Estimator -- Fact or Fiction?Mr. Bruce E. Bradley
BrascoCDR.01MON 10:00-11:00Willow A (2nd Floor)Will Courts Adopt AACE Forensic Schedule Analysis RP: 29R-03?Mr Christopher J Brasco Esq; Mr Christopher Michael Anzidei
BrownPS.08TUE 11:00-12:00Aspen (2nd Floor)Building Green -- Potential Impacts to the Project ScheduleMs Jacqueline Therese Doyle PE; Mr Robert B Brown PE; Mr Dax Ponce de Leon; Ms Laura Ludwig
BrownDEV.04WED 8:00-9:00Diamond (1st Floor)The Talent Vacuum -- Keeping Your Best Talent in a DownturnMr Jeffrey Bettinger; Ms Shayna Lynn Brown
BrittOWN.S03MON 3:45-4:45Grand A Ballroom (2nd Floor)Project Portfolio Management for Value Growth and Cost ControlMs. Beth Britt
BuziakCDR.S04WED 2:30-3:30Willow A (2nd Floor)Deceptive Schedules: What Can We Do About Them?Mr John P Buziak PE; Mr Jonathan Head Esq
CabanoOWN.02TUE 3:30-4:30Diamond (1st Floor)The Changing Face of Owner Project RisksMr. Stephen L. Cabano
CaddellRISK.06WED 8:00-9:00Issaquah (3rd Floor)A Recommended Total Project Cost Risk Model ApproachMr Christopher P Caddell PE
CalveyPS.01MON 10:00-11:00Aspen (2nd Floor)AACE Recommended Practices 49R-06 "Identifying the Critical Path" & 26R-03 "Scheduling Specification Models" (Sponsored by WPC)Ms Hannah E Schumacher PSP; Mr Timothy T Calvey PE PSP
CalveyDEV.05WED 9:45-10:45Diamond (1st Floor)Being a Consultant?Mr Edward E Douglas III CCC PSP; Mr Timothy T Calvey PE PSP; Mr. Ronald M Winter PSP
CarsonCDR.03MON 2:00-3:00Willow A (2nd Floor)(Panel Discussion) Minimizing Expert Witness Mistakes in TestimonyMr Christopher W Carson PSP; Mr Sidney J Hymes CFCC; Mr Robert D Kelly PSP
CarsonPS.09TUE 3:30-4:30Aspen (2nd Floor)Schedule Development - A Methodical Approach to Building a ScheduleMr. Christopher W. Carson PSP; Mr. John C. Potter PSP
CarsonPS.14WED 1:15-2:15Aspen (2nd Floor)(Panel Discussion) The Great Debate: Punchlist - Before or After Substantial Completion?Mr Christopher W Carson PSP; Mr. John C. Potter PSP; Mr Mark C Sanders PE CCE PSP; Mr John James Stauffer PSP
CarterCDR.10WED 9:45-10:45Willow A (2nd Floor)Applications of Monte Carlo Simulations in Dispute Resolution and Claims WorkMr. Rod Charles Carter; Mr. Richard J. Long
CianfaglioneCDR.12WED 11:00-12:00Willow A (2nd Floor)When Less is Not More: Providing Subcontractors Early and Late DatesMr John C Livengood CFCC; Mr. Rick Gaetano Cianfaglione PE PSP
CiccarelliCDR.02MON 11:15-12:15Willow A (2nd Floor)AACE International Recommended Practices in Action: A Case StudyMr John J Ciccarelli PE CCE PSP; Mr Michael J Bennink PE CCE PSP
CoronaEVM.06TUE 3:30-4:30Willow B (2nd Floor)"In Search of the Elusive "Corporate EVMS Certification""Ms Robin J Corona CCC; Mr Michael R Nosbisch CCC PSP
CressmanEST.S03TUE 1:45-2:45Grand A Ballroom (2nd Floor)Selling Recognition and Acceptance of AACE Recommended PracticesMr William E Kraus PE CCE; Mr Ken Cressman CCC EVP
CretuRISK.S02TUE 1:45-2:45Issaquah (3rd Floor)Risk Base Estimate Self- ModelingDr Ovidiu Cretu PE; Mr. Terry Berends PE
CrewEVM.03TUE 11:00-12:00Willow B (2nd Floor)Activity Duration-Based Schedule Progress and Prediction MetricsMr Scott William Crew PSP CCE EVP
CurranCOM.07TUE 4:45-5:45Issaquah (3rd Floor)Decision & Risk Management Committee MeetingMr. Michael W Curran
DennisCDR.05TUE 8:00-9:00Willow A (2nd Floor)Compliant Registered Method: A Sample SubmissionMr Kenji P Hoshino PSP CFCC; Mr Michael S Dennis CCC
DikeDEV.S03WED 1:15-2:15Wallingford Room (3rd Floor)Four Critical Components to Fostering Positive Morale & Effectiveness in the Workplace Mr. Terry A Dike
DouglasPS.05TUE 9:45-10:45Aspen (2nd Floor)Understanding Schedule Change ManagementMr Edward E Douglas III CCC PSP
DouglasDEV.05WED 9:45-10:45Diamond (1st Floor)Being a Consultant?Mr Edward E Douglas III CCC PSP; Mr Timothy T Calvey PE PSP; Mr. Ronald M Winter PSP
DoylePS.08TUE 11:00-12:00Aspen (2nd Floor)Building Green -- Potential Impacts to the Project ScheduleMs Jacqueline Therese Doyle PE; Mr Robert B Brown PE; Mr Dax Ponce de Leon; Ms Laura Ludwig
EvrenosogluPS.15WED 2:30-3:30Aspen (2nd Floor)Much Ado about Dates: Understanding P6 Date InformationMr Faik Burak Evrenosoglu CCE PSP; Mr. Ronald M Winter PSP
FigueiredoRISK.08WED 1:15-2:15Issaquah (3rd Floor)Defining Risk and Contingency for Pipeline ProjectsMs Cristina Figueiredo P Eng; Mr Brent Kitson P Eng
FranklinSK.01MON 10:00-12:15Cirrus (35th Floor)Written and Oral CommunicationMr Michael Steven Franklin CCE; Mr Donald F McDonald Jr PE CCE PSP
GardnerPM.03MON 2:00-3:00Issaquah (3rd Floor)Organizational Change: All We Want is Better Projects - Why So Difficult?Mr Philip (Phil) James Gardner PEng PMP
GonzalesRISK.10WED 2:30-3:30Issaquah (3rd Floor)Mitigating Cost and Schedule Risks on Power Generation Construction ProjectsMr Anthony Gonzales
GoodTCM.01MON 10:00-11:00Willow B (2nd Floor)Project Development and Cost Estimating -- A Business PerspectiveMr Gordon Keith Good
GriesmyerCOM.04MON 5:00-6:00Willow B (2nd Floor)Academic SIG MeetingMr Peter W Griesmyer
GruberRISK.07WED 9:45-10:45Issaquah (3rd Floor)Risk Management on the National Compact Stellarator Project (NCSX)"Mr Robert T Simmons; Mr Philip J Heitzenroeder; Mr Wayne T Reiersen; Dr George H Neilson; Mr. Ronald Strykowsky; Mr. Donald Rej; Mr. Christopher O. Gruber, CCC"
HarbuckRISK.05TUE 3:30-4:30Issaquah (3rd Floor)Life Cycle Cost Analysis for Transportation ProjectsMr Robert H Harbuck PE CCE CEP
HarbuckCOM.08TUE 4:45-5:45Diamond (1st Floor)Transportation SIG MeetingMr Robert H Harbuck PE CCE CEP
HastiePS.12WED 8:00-9:00Aspen (2nd Floor)An Agency Enterprise Implementation of a Project Management ProgramMs Cathy Hastie
HeadCDR.S04WED 2:30-3:30Willow A (2nd Floor)Deceptive Schedules: What Can We Do About Them?Mr John P Buziak PE; Mr Jonathan Head Esq
HeitzenroederRISK.07WED 9:45-10:45Issaquah (3rd Floor)Risk Management on the National Compact Stellarator Project (NCSX)"Mr Robert T Simmons; Mr Philip J Heitzenroeder; Mr Wayne T Reiersen; Dr George H Neilson; Mr. Ronald Strykowsky; Mr. Donald Rej; Mr. Christopher O. Gruber, CCC"
HeraviPS.04MON 3:45-4:45Aspen (2nd Floor)Schedule Compression for Construction Projects by Interruption in LOB SchedulingDr Gholamreza Heravi; Mr Seyyed Mohammad Amini
HijaziBIM.04MON 11:15-12:15Diamond (1st Floor)Constructability Assessment using BIM/4D CAD Simulation ModelMr Wissam Hijazi; Dr Sabah Alkass P Eng; Dr Tarek Zayed
HitchingsEST.S01MON 11:15-12:15Grand A Ballroom (2nd Floor)Predict Piping Quantities Based on 30% Model Review or Earlier DownloadsMr. Lakshmanan Simhadri P Eng CCE; Mr Blair Hitchings
HollmannRISK.01TUE 8:00-9:00Issaquah (3rd Floor)Recommended Practices for Risk Analysis & Cost Contingency EstimatingMr John K Hollmann PE CCE CEP
HoshinoCDR.05TUE 8:00-9:00Willow A (2nd Floor)Compliant Registered Method: A Sample SubmissionMr Kenji P Hoshino PSP CFCC; Mr Michael S Dennis CCC
HoshinoCDR.11WED 8:00-9:00Willow A (2nd Floor)P6 Discovery Under the U.S. Federal Rules of Civil ProcedureMr. Kelly Roger Wallace PSP; Mr Kenji P Hoshino PSP CFCC
HumphreysEVM.02TUE 9:45-10:45Willow B (2nd Floor)"Using EVM Reports, Models, and Indices to Identify Problems Early"Mr. Gary Humphreys
HymesCDR.03MON 2:00-3:00Willow A (2nd Floor)(Panel Discussion) Minimizing Expert Witness Mistakes in TestimonyMr Christopher W Carson PSP; Mr Sidney J Hymes CFCC; Mr Robert D Kelly PSP
JarnaganEVM.01TUE 8:00-9:00Willow B (2nd Floor)"Lessons Learned in Using Earned Value Systems, (a case study)"Mr Harry W Jarnagan PE CCE
JohnsonTCM.02MON 11:15-12:15Willow B (2nd Floor)(Panel Discussion) Adding Value By Reinventing Yourself As A Total Cost EngineerMr. James Alfred Johnson; Mr William E Kraus PE CCE; Mr Richard A Selg CCE
KellyCDR.03MON 2:00-3:00Willow A (2nd Floor)(Panel Discussion) Minimizing Expert Witness Mistakes in TestimonyMr Christopher W Carson PSP; Mr Sidney J Hymes CFCC; Mr Robert D Kelly PSP
KhadkaCDR.03TUE 11:00-12:00Issaquah (3rd Floor)Applying Risk Management to Project Performance Mr Sagar B Khadka PSP; Mr. Charles E Bolyard, Jr. PSP CFCC
KimEVM.S01TUE 1:45-2:45Wallingford (3rd Floor)Progress Evaluation - Applying Earned Value Management in the Construction of Commercial Buildings Mr. Allen Kim; Mr. Hreinn Thormar
KitsonRISK.08WED 1:15-2:15Issaquah (3rd Floor)Defining Risk and Contingency for Pipeline ProjectsMs Cristina Figueiredo P Eng; Mr Brent Kitson P Eng
KitsonEST.13WED 11:00-12:00Grand A Ballroom (2nd Floor)General Liquids Pipeline Projects Scope and Cost Estimating ChallengesMr Brent Kitson P Eng
KortamPM.10WED 9:45-10:45Wallingford (3rd Floor)Do You Suffer Managing Multiple Projects?Mr. Ali Mohamed Farouk Kortam CCE PSP
KrausTCM.02MON 11:15-12:15Willow B (2nd Floor)(Panel Discussion) Adding Value By Reinventing Yourself As A Total Cost EngineerMr. James Alfred Johnson; Mr William E Kraus PE CCE; Mr Richard A Selg CCE
KrausEST.S03TUE 1:45-2:45Grand A Ballroom (2nd Floor)Selling Recognition and Acceptance of AACE Recommended PracticesMr William E Kraus PE CCE; Mr Ken Cressman CCC EVP
KrausEST.10TUE 3:30-4:30Grand A Ballroom (2nd Floor)Strategies for Reduction of Estimating Variances on Projects at Atlanta’s AirportMr William E Kraus PE CCE; Mr Richard A Selg CCE
LaddTCM.04MON 3:45-4:45Willow B (2nd Floor)"Using the TCM Framework to Increase the Quality, Objectivity, Transparency, and Reproducibility of Risk Analyses"Mr Derek Michael Ladd; Mr Darwin L Nelson PE; Mr. Gordon Lee Ballentine
LarsonCOM.03MON 5:00-6:00Diamond (1st Floor)BIM Committee MeetingMr Philip D Larson CCE PSP CEP
LazarczykOWN.05WED 11:00-12:00Willow B (2nd Floor)Project Audit -- Joint Engineer and Accountant Team ApproachMr Jack A Lazarczyk CCC
LeeCDR.S01TUE 11:00-12:00Willow A (2nd Floor)Delay Analysis Using Learning Effect and Linear Scheduling in ConstructionDr Jae-Seob Lee
LeoCOM.02MON 5:00-6:00Grand A Ballroom (2nd Floor)Cost Estimating Committee MeetingMr Douglas W Leo CCC CEP
LeoEST.06TUE 9:45-10:45Grand A Ballroom (2nd Floor)Owner Review Process for Mega- Project EstimatesMr Douglas W Leo CCC CEP
LivengoodCOM.01MON 5:00-6:00Willow A (2nd Floor)Claims & Dispute Resolution Committee Meeting (1)Mr John C Livengood CFCC
LivengoodCOM.06TUE 4:45-5:45Willow A (2nd Floor)Claims & Dispute Resolution Committee Meeting (2)Mr John C Livengood CFCC
LivengoodCDR.12WED 11:00-12:00Willow A (2nd Floor)When Less is Not More: Providing Subcontractors Early and Late DatesMr John C Livengood CFCC; Mr. Rick Gaetano Cianfaglione PE PSP
LoftonEST.03MON 2:00-3:00Grand A Ballroom (2nd Floor)Estimating Today’s Mega ProjectsMr. Waymon D. Lofton
LongCDR.10WED 9:45-10:45Willow A (2nd Floor)Applications of Monte Carlo Simulations in Dispute Resolution and Claims WorkMr. Rod Charles Carter; Mr. Richard J. Long
LoweCDR.09TUE 3:30-4:30Willow A (2nd Floor)"Measuring Delays Using the Contemporaneous Period Analysis, Part 2"Mr J Scott Lowe
LudwigPS.08TUE 11:00-12:00Aspen (2nd Floor)Building Green -- Potential Impacts to the Project ScheduleMs Jacqueline Therese Doyle PE; Mr Robert B Brown PE; Mr Dax Ponce de Leon; Ms Laura Ludwig
LukasPS.10TUE 1:45-2:45Aspen (2nd Floor)Top Ten Scheduling Mistakes and How to Prevent ThemMr Joseph Arthur Lukas PE CCE
MartinezEST.15WED 1:15-2:15Grand A Ballroom (2nd Floor)Assessment of Methods for Adjusting Construction Cost Estimates by Geographical LocationMr Adam A Martinez; Dr Giovanni C Migliaccio; Dr Paul Zandbergen; Mr Su Zhang
MatasSK.04TUE 1:45-5:45Cirrus (35th Floor)Statusing for Progress and Forecasting TrendsDr Sean Thomas Regan CCE CEP; Ms Lisa Dianne Matas EVP
MaukEST.11WED 8:00-9:00Grand A Ballroom (2nd Floor)Historical Lessons for Today: How the Savings and Loan Crisis Affected the US Construction SectorMr Basil P Alexander Esq; Mr. Fred J. Saldana III PSP; Mr John E Mauk
McCuenBIM.01MON 10:00-11:00Diamond (1st Floor)The Quantification Process and Standards for BIM: AACE International Task Force Project Development and RecommendationsMs Tamera Lee McCuen
McDonaldSK.01MON 10:00-12:15Cirrus (35th Floor)Written and Oral CommunicationMr Michael Steven Franklin CCE; Mr Donald F McDonald Jr PE CCE PSP
McDonaldSK.06WED 1:15-3:45Cirrus (35th Floor)Change Management for EPC ContractingMr Donald F McDonald Jr PE CCE PSP
McDowellEST.07TUE 11:00-12:00Grand A Ballroom (2nd Floor)Effective Project History Collection and Retrieval - Back to BasicsMr. Kevin McDowell CCE
MigliaccioEST.15WED 1:15-2:15Grand A Ballroom (2nd Floor)Assessment of Methods for Adjusting Construction Cost Estimates by Geographical LocationMr Adam A Martinez; Dr Giovanni C Migliaccio; Dr Paul Zandbergen; Mr Su Zhang
MusgroveIT.01WED 11:00-12:00Wallingford (3rd Floor)Data Warehouse or Data Closet - Size Doesn’t Really MatterMr. John G. Musgrove PE
NalewaikCOM.10TUE 4:45-5:45Willow B (2nd Floor) International Cost Engineering Council Meeting Ms Alexia A Nalewaik CCE MRICS
NalewaikOWN.S02TUE 8:00-9:00Diamond (1st Floor)Challenges in Reporting Project Costs and Risks to Owner Decisionmakers (Sponsored by WPC)Ms Alexia A Nalewaik CCE; Mr Jeffrey Witt
NeilsonRISK.07WED 9:45-10:45Issaquah (3rd Floor)Risk Management on the National Compact Stellarator Project (NCSX)"Mr Robert T Simmons; Mr Philip J Heitzenroeder; Mr Wayne T Reiersen; Dr George H Neilson; Mr. Ronald Strykowsky; Mr. Donald Rej; Mr. Christopher O. Gruber, CCC"
NelsonTCM.04MON 3:45-4:45Willow B (2nd Floor)"Using the TCM Framework to Increase the Quality, Objectivity, Transparency, and Reproducibility of Risk Analyses"Mr Derek Michael Ladd; Mr Darwin L Nelson PE; Mr. Gordon Lee Ballentine
NordeanDEV.07WED 1:15-2:15Diamond (1st Floor)Data Collection and Project Closeouts from a Non-Engineering PerspectiveMs Lesley Nordean
NorfleetRISK.02TUE 9:45-10:45Issaquah (3rd Floor)A Fresh Look at Some Past Risk Management TechniquesMr. David A. Norfleet CCC CFCC
NosbischCSC.01MON 2:00-3:00Diamond (1st Floor)Enterprise-Wide Schedule Management the Practical WayMr Michael R Nosbisch CCC PSP
NosbischEVM.06TUE 3:30-4:30Willow B (2nd Floor)"In Search of the Elusive "Corporate EVMS Certification""Ms Robin J Corona CCC; Mr Michael R Nosbisch CCC PSP
OrczykSK.03TUE 8:00-12:00Cirrus (35th Floor)Planning and SchedulingDr Joseph J Orczyk PE
OttesenCDR.08TUE 1:45-2:45Willow A (2nd Floor)Window Analysis in a Crunch (Sponsored by WPC)Mr. Jeffery L. Ottesen PE PSP CFCC; Dr Anamaria I Popescu PE
OwenPS.13WED 9:45-10:45Aspen (2nd Floor)Schedule Collaboration on Mars Science Laboratory with Multi-Users and Tools (Sponsored by WPC)Ms Julie K Owen PSP CCC; Mr Thomas Barnhart
PhilipenkoOWN.07WED 2:30-3:30Willow B (2nd Floor)Project Scoping in a Large Pipeline CompanyMr Ray S Philipenko P Eng
PlotnickCDR.04MON 3:45-4:45Willow A (2nd Floor)"Proactive Schedule and Claims Control by the Owner, of the Owner, and for the Owner"Mr Fredric L Plotnick PE
PlotnickPS.S02TUE 8:00-9:00Aspen (2nd Floor)Update on RDCPM 2009Mr Fredric L Plotnick PE
Ponce de LeonPM.05MON 10:00-11:00Issaquah (3rd Floor)Designing and Constructing Cost-Neutral Greener Facilities in the "Energy-Climate" EraMr. John R. Spittler PE; Mr Dax Ponce de Leon; Mr John M Zann PE PSP
Ponce de LeonPS.08TUE 11:00-12:00Aspen (2nd Floor)Building Green -- Potential Impacts to the Project ScheduleMs Jacqueline Therese Doyle PE; Mr Robert B Brown PE; Mr Dax Ponce de Leon; Ms Laura Ludwig
PopescuCSC.02MON 3:45-4:45Diamond (1st Floor)Total Float Distribution: A SANE Way to Manage Schedule Contingency (Sponsored by WPC)Dr Anamaria I Popescu PE
PopescuCDR.08TUE 1:45-2:45Willow A (2nd Floor)Window Analysis in a Crunch (Sponsored by WPC)Mr. Jeffery L. Ottesen PE PSP CFCC; Dr Anamaria I Popescu PE
PotterPS.09TUE 3:30-4:30Aspen (2nd Floor)Schedule Development - A Methodical Approach to Building a ScheduleMr. Christopher W. Carson PSP; Mr. John C. Potter PSP
PotterPS.14WED 1:15-2:15Aspen (2nd Floor)(Panel Discussion) The Great Debate: Punchlist - Before or After Substantial Completion?Mr Christopher W Carson PSP; Mr. John C. Potter PSP; Mr Mark C Sanders PE CCE PSP; Mr John James Stauffer PSP
RadPM.02MON 11:15-12:15Issaquah (3rd Floor)Attributes of a Harmonious Project TeamDr Parviz F Rad PE CCE; Mr. Vittal S. Anantatmula
RadPM.S02MON 3:45-4:45Issaquah (3rd Floor)Characteristics of a Project-Friendly EnterpriseDr Parviz F Rad PE CCE; Mr. Vittal S. Anantatmula
ReganSK.04TUE 1:45-5:45Cirrus (35th Floor)Statusing for Progress and Forecasting TrendsDr Sean Thomas Regan CCE CEP; Ms Lisa Dianne Matas EVP
ReganSK.05WED 8:00-12:00Cirrus (35th Floor)Earned Value ManagementDr Sean Thomas Regan CCE CEP
ReiersenRISK.07WED 9:45-10:45Issaquah (3rd Floor)Risk Management on the National Compact Stellarator Project (NCSX)"Mr Robert T Simmons; Mr Philip J Heitzenroeder; Mr Wayne T Reiersen; Dr George H Neilson; Mr. Ronald Strykowsky; Mr. Donald Rej; Mr. Christopher O. Gruber, CCC"
RejRISK.07WED 9:45-10:45Issaquah (3rd Floor)Risk Management on the National Compact Stellarator Project (NCSX)"Mr Robert T Simmons; Mr Philip J Heitzenroeder; Mr Wayne T Reiersen; Dr George H Neilson; Mr. Ronald Strykowsky; Mr. Donald Rej; Mr. Christopher O. Gruber, CCC"
RichardsPS.S03MON 11:15-12:15Aspen (2nd Floor)An Introduction to Critical Chain Project ManagementMr. Hilbert Robinson; Dr Robert Richards
RiderCDR.06TUE 9:45-10:45Willow A (2nd Floor)"The New Modeled, Subtractive, Multiple Base MIP 3.9 Forensic Schedule Analysis Protocol"Mr Andrew Avalon PE PSP; Mr. Ronald J. Rider
RobinsonPS.S03MON 11:15-12:15Aspen (2nd Floor)An Introduction to Critical Chain Project ManagementMr. Hilbert Robinson; Dr Robert Richards
SaldanaEST.11WED 8:00-9:00Grand A Ballroom (2nd Floor)Historical Lessons for Today: How the Savings and Loan Crisis Affected the US Construction SectorMr Basil P Alexander Esq; Mr. Fred J. Saldana III PSP; Mr John E Mauk
SandersPS.14WED 1:15-2:15Aspen (2nd Floor)(Panel Discussion) The Great Debate: Punchlist - Before or After Substantial Completion?Mr Christopher W Carson PSP; Mr. John C. Potter PSP; Mr Mark C Sanders PE CCE PSP; Mr John James Stauffer PSP
SchumacherPS.01MON 10:00-11:00Aspen (2nd Floor)"AACE Recommended Practices 49R-06 "Identifying the Critical Path" & 26R-03 "Scheduling Specification Models" (Sponsored by WPC)"Ms Hannah E Schumacher PSP; Mr Timothy T Calvey PE PSP
SchumacherCOM.09WED 11:00-12:00Aspen (2nd Floor)Planning & Scheduling Committee MeetingMr. Ronald M Winter PSP; Ms Hannah E Schumacher PSP
SelgTCM.02MON 11:15-12:15Willow B (2nd Floor)(Panel Discussion) Adding Value By Reinventing Yourself As A Total Cost EngineerMr. James Alfred Johnson; Mr William E Kraus PE CCE; Mr Richard A Selg CCE
SelgCOM.05MON 5:00-6:00Aspen (2nd Floor)Environmental SIG MeetingMr Richard A Selg CCE
SelgEST.10TUE 3:30-4:30Grand A Ballroom (2nd Floor)Strategies for Reduction of Estimating Variances on Projects at Atlanta’s AirportMr William E Kraus PE CCE; Mr Richard A Selg CCE
SimhadriEST.S01MON 11:15-12:15Grand A Ballroom (2nd Floor)Predict Piping Quantities Based on 30% Model Review or Earlier DownloadsMr. Lakshmanan Simhadri P Eng CCE; Mr Blair Hitchings
SimmonsRISK.07WED 9:45-10:45Issaquah (3rd Floor)Risk Management on the National Compact Stellarator Project (NCSX)"Mr Robert T Simmons; Mr Philip J Heitzenroeder; Mr Wayne T Reiersen; Dr George H Neilson; Mr. Ronald Strykowsky; Mr. Donald Rej; Mr. Christopher O. Gruber, CCC"
SinghCSC.07TUE 11:00-12:00Diamond (1st Floor)SOX and Project Controls Reporting: An Integrative SolutionMr Rohit Singh P Eng CCE
SpittlerPM.05MON 10:00-11:00Issaquah (3rd Floor)Designing and Constructing Cost- Neutral Greener Facilities in the "Energy-Climate" EraMr. John R. Spittler PE; Mr Dax Ponce de Leon; Mr John M Zann PE PSP
StaufferPS.14WED 1:15-2:15Aspen (2nd Floor)(Panel Discussion) The Great Debate: Punchlist - Before or After Substantial Completion?Mr Christopher W Carson PSP; Mr. John C. Potter PSP; Mr Mark C Sanders PE CCE PSP; Mr John James Stauffer PSP
StrykowskyRISK.07WED 9:45-10:45Issaquah (3rd Floor)Risk Management on the National Compact Stellarator Project (NCSX)Mr Robert T Simmons; Mr Philip J Heitzenroeder; Mr Wayne T Reiersen; Dr George H Neilson; Mr. Ronald Strykowsky; Mr. Donald Rej; Mr. Christopher O. Gruber, CCC
ThorndikePS.S04MON 2:00-3:00Aspen (2nd Floor)Methodology Behind PlanningMs. Carmelita Thorndike
ThormarCDR.03TUE 9:45-10:45Diamond (1st Floor)Cost Controls of Capital Costs Throughout the Design PhaseMr Hreinn Thormar
ThormarEVM.S01TUE 1:45-2:45Wallingford (3rd Floor)Progress Evaluation - Applying Earned Value Management in the Construction of Commercial Buildings Mr. Allen Kim; Mr. Hreinn Thormar
UmanEST.12WED 9:45-10:45Grand A Ballroom (2nd Floor)The Estimating World of the 21st CenturyMr. Daniel Matthew Uman ECCE CEP
UppalTCM.03MON 2:00-3:00Willow B (2nd Floor)"Cost Estimating, Project Performance & Life Cycle"Mr Kul B Uppal PE CEP
WaddleEST.05TUE 8:00-9:00Grand A Ballroom (2nd Floor)Bid Preparation For Contractors (Avoiding Estimating Errors)Mr Todd W Waddle CCC
WallaceCDR.11WED 8:00-9:00Willow A (2nd Floor)P6 Discovery Under the U.S. Federal Rules of Civil ProcedureMr. Kelly Roger Wallace PSP; Mr Kenji P Hoshino PSP CFCC
WhitesideDEV.01WED 11:00-12:00Diamond (1st Floor)How to Write a Technical PaperMr James D Whiteside II PE
WhitesideDEV.06WED 2:30-3:30Diamond (1st Floor)How to Present a Technical PaperMr James D Whiteside II PE
WilliamsCDR.14WED 1:15-2:15 Willow A (2nd Floor)Impacts to Labor Productivity in Framing, Drywall and Taping TradesDr. Gerald H Williams PE; Dr. Timothy R Anderson
WinterCOM.09WED 11:00-12:00Aspen (2nd Floor)Planning & Scheduling Committee MeetingMr. Ronald M Winter PSP; Ms Hannah E Schumacher PSP
WinterPS.15WED 2:30-3:30Aspen (2nd Floor)Much Ado about Dates: Understanding P6 Date InformationMr Faik Burak Evrenosoglu CCE PSP; Mr. Ronald M Winter PSP
WinterDEV.05WED 9:45-10:45Diamond (1st Floor)Being a Consultant?Mr Edward E Douglas III CCC PSP; Mr Timothy T Calvey PE PSP; Mr. Ronald M Winter PSP
WittOWN.S02TUE 8:00-9:00Diamond (1st Floor)Challenges in Reporting Project Costs and Risks to Owner Decisionmakers (Sponsored by WPC)Ms Alexia A Nalewaik CCE; Mr Jeffrey Witt
WoodwardSK.02MON 2:00-6:00Cirrus (35th Floor)EstimatingMr Charles P Woodward PE CCE CEP
WyandtOWN.06WED 1:15-2:15Willow B (2nd Floor)A Case for Third Party Project ControlsMr. Randall Scott Wyandt
ZandbergenEST.15WED 1:15-2:15Grand A Ballroom (2nd Floor)Assessment of Methods for Adjusting Construction Cost Estimates by Geographical LocationMr Adam A Martinez; Dr Giovanni C Migliaccio; Dr Paul Zandbergen; Mr Su Zhang
ZannPM.05MON 10:00-11:00Issaquah (3rd Floor)Designing and Constructing Cost- Neutral Greener Facilities in the "Energy-Climate" EraMr. John R. Spittler PE; Mr Dax Ponce de Leon; Mr John M Zann PE PSP
ZayedBIM.04MON 11:15-12:15Diamond (1st Floor)Constructability Assessment using BIM/4D CAD Simulation ModelMr Wissam Hijazi; Dr Sabah Alkass P Eng; Dr Tarek Zayed
ZhangEST.15WED 1:15-2:15Grand A Ballroom (2nd Floor)Assessment of Methods for Adjusting Construction Cost Estimates by Geographical LocationMr Adam A Martinez; Dr Giovanni C Migliaccio; Dr Paul Zandbergen; Mr Su Zhang
AACE International
Advertisements:
Membership |  Technical |  Education |  Certification |  Resources |  Career Center |  Annual Meeting |  Log In |  Forums |  Contact |  Site Map |  Home



Web This Site