| Name | Track | Time | Location | Title | All Authors/Presenters (Primary author is listed first) |
|
| Akin-Ojelabi | CDR.04 | MON 3:45-4:45 | Room Int'l A | Implications of Mandatory Court-Ordered Construction Mediation | Dr Aijbade Ayodeji Aibinu; Dr Lola Akin-Ojelabi; Blair Gardiner |
|
| Ahmed | PM.09 | WED 1:15-2:15 | Room M103 | Integrated project teams with multi office
execution, A Study of EPC Project/s in Canada | Dr. Pattita Brandell, Mr Tanveer Nabi Ahmed CCE; Dr Janaka Y Ruwanpura |
|
| Alkass | BIM.02 | WED 9:45-10:45 | Room M102 | Integrated Cost Budgeting and Estimating Model
for Building Projects | Mr Sarmad Al-Mashta; Dr Sabah Alkass P Eng |
|
| Al-Mashta | BIM.02 | WED 9:45-10:45 | Room M102 | Integrated Cost Budgeting and Estimating
Model for Building Projects | Mr Sarmad Al-Mashta; Dr Sabah Alkass P Eng |
|
| Alqasrani | RISK.11 | WED 8:00-9:00 | Room M104 | Schedule Risk Management for Pipeline
Projects | Ms Renna Alqasrani; Mr Brent Kitson P Eng; Mr Richa Sahib |
|
| Anjaneyulu | CSC.09 | WED 1:15-2:15 | Room M302 | Performance Metrics Based on Forecast
Variance -- A Case Study | Mr Logan Anjaneyulu PSP CEP |
|
| Anzidei | CDR.01 | MON 10:00-11:00 | Room Int'l A | Demystifying the Law of Lost Productivity
Claims | Mr Christopher J Brasco Esq; Mr Christopher Michael Anzidei |
|
| Avalon | PS.01 | MON 10:00-11:00 | Room M106 | Schedule Quality Assurance
Procedures | Mr Andrew Avalon PE PSP; Mr. Curtis W. Foster |
|
| Bakhshi | RISK.14 | WED 1:15-2:15 | Room M104 | Effect of Escalation on Large Construction
Programs | Dr Ali Touran PE; Mr. Payam Bakhshi |
|
| Bean | PM.06 | WED 8:00-9:00 | Room M103 | Recovering a Troubled
Telecommunications Project | Mr Thomas Bean |
|
| Bennink | CDR.05 | TUE 8:00-9:00 | Room Int'l A | Revisiting Lost Productivity: A Primer and
Update for the Industry | Mr John J Ciccarelli PE CCE PSP; Mr Michael J Bennink PE CCE PSP |
|
| Bhaumik | EST.03 | MON 2:00-3:00 | Room Int'l B | Avoid Cost Overrun for Mega
Projects | Mr Himansu Bhaumik PE |
|
| Bhaumik | PS.07 | TUE 9:45-10:45 | Room M106 | Essentials of early planning for Mega
Projects | Mr Himansu Bhaumik PE |
|
| Bissett | CSC.S02 | TUE 8:00-9:00 | Room M302 | Where Has the Cost Focus Gone? | Ms Trudi Bissett; Dr John G Buchan |
|
| Brandell | PM.09 | WED 1:15-2:15 | Room M103 | Integrated project teams with multi office execution, A Study of EPC Project/s in Canada | Dr. Pattita Brandell, Mr Tanveer Nabi Ahmed CCE; Dr Janaka Y Ruwanpura |
|
| Brasco | CDR.01 | MON 10:00-11:00 | Room Int'l A | Demystifying the Law of Lost Productivity
Claims | Mr Christopher J Brasco Esq; Mr Christopher Michael Anzidei |
|
| Brown | EVM.02 | MON 11:15-12:15 | Room M302 | Implementing an EVMS/Cost Controls System for
FAA's TAMR Program | Mr Mark Walden; Mr Tom Brown; Mr Rohit Iyer |
|
| Buchan | CSC.S02 | TUE 8:00-9:00 | Room M302 | Where Has the Cost Focus Gone? | Ms Trudi Bissett; Dr John G Buchan |
|
| Byng | EST.10 | TUE 3:30-4:30 | Room Int'l B | New Rules of Measurement in the
UK | Mr. Michael Byng |
|
| Caddell | RISK.07 | TUE 11:00-12:00 | Room M104 | Understanding Dampening in Cost Risk
Models | Mr Christopher P Caddell PE |
|
| Caddell | RISK.08 | TUE 1:45-2:45 | Room M104 | Understanding Merge Bias in Schedule Risk
Analysis | Mr. Jeffrey Valdahl; Mr Christopher P Caddell PE |
|
| Calvey | PS.06 | TUE 8:00-9:00 | Room M106 | Order-Of-Magnitude Scheduling | Mr
Timothy T Calvey PE PSP |
|
| Carson | EVM.04 | MON 3:45-4:45 | Room M302 | Mitigation and Performance Recovery Using Earned
Value | Mr. John C. Potter PSP; Mr Christopher W Carson PSP; Mr Patrick M. Kelly PSP |
|
| Carson | PS.08 | TUE 11:00-12:00 | Room M106 | Planning A Complex Project -- An Under
Appreciated Effort | Mr Christopher W Carson PSP; Mr Glen R Palmer PSP CFCC |
|
| Carson | PS.14 | WED 1:15-2:15 | Room M106 | (Panel Discussion) The Great Debate: "Should
Schedule Revisions Require Owner Approval?" | Mr Christopher W Carson PSP; Mr Mark C Sanders PE CCE PSP; Mr John James Stauffer PSP; Mr. John C. Potter PSP |
|
| Cheek | CSC.S04 | WED 9:45-10:45 |
Room M302 |
Developing Subcontract Pricing as Applied to Building Construction | Mr John Cheek |
|
| Ciccarelli | CDR.05 | TUE 8:00-9:00 | Room Int'l A | Revisiting Lost Productivity: A Primer and
Update for the Industry | Mr John J Ciccarelli PE CCE PSP; Mr Michael J Bennink PE CCE PSP |
|
| Coppo | EST.S02 | TUE 9:45-10:45 | Room Int'l B | Estimate Conversion to Historical Model | Mr. Robert J. Coppo; Mr. Waymon D. Lofton |
|
| Criss | PM.05 | MON 5:00-6:00 | Room M103 | Los Angeles $40 Billion Transportation Program Using
P6 | Ms Julie K Owen CCC PSP; Mr. Brian Criss |
|
| Curran | RISK.02 | MON 11:15-12:15 | Room M104 | Handling the Truth in Risk
Management | Mr. Kevin M Curran; Mr. Michael W Curran |
|
| Curran | RISK.02 | MON 11:15-12:15 | Room M104 | Handling the Truth in Risk
Management | Mr. Kevin M Curran; Mr. Michael W Curran |
|
| Curran | COM.05 | MON 5:00-6:00 | Room M104 | Decision and Risk Management Committee
Meeting | Mr. Michael W Curran |
|
| Datta | RISK.09 | TUE 3:30-4:30 | Room M104 | Capital Projects Risk Development and
Management | Mr Abhijnan Datta |
|
| Davis | EST.12 | WED 9:45-10:45 | Room Int'l B | Mathematical models of contingency for errors
of omission | Dr Steve Davis; Yuan Peng |
|
| Debiak | EVM.03 | MON 2:00-3:00 | Room M302 | EVM Perfromance Metrics - Simplifying the
Benchmarking and Strategic Analysis of the Constructor | Mr Michael Debiak PSP, EVP |
|
| Dehghan | PS.04 | MON 3:45-4:45 | Room M106 | A New Algorithm for Project Activity
Overlapping | Mr Reza Dehghan; Dr Janaka Y Ruwanpura |
|
| Delarue | EVM.S01 | MON 5:00-6:00 | Room M302 | Monitoring Productivity with EVA |
Mr Aldo Dorea Mattos; Mr Richard Delarue |
|
| Dell'Isola | PM.08 | WED 11:00-12:00 | Room M103 | Expanded Facility Condition Assessment
Becomes Strategic Facility Consulting | Mr Michael D Dell'Isola PE; Mr. Benjamin Dutton |
|
| Dieterle | CDR.07 | TUE 11:00-12:00 | Room Int'l A | Practical Issues in Loss of Efficiency
Claims | Mr Robert A Dieterle CCE; Mr Thomas A Gaines |
|
| Douglas | PS.13 | WED 9:45-10:45 | Room M106 | Managing Schedule
Contingency | Mr Edward E Douglas III CCC PSP |
|
| Douglas | ADV.01 | WED 1:15-2:15 | Room M102 | (Panel Discussion - Part 1) Planning for Post-
Disaster Project Controls | Dr Randy R Rapp PE CCE; Mr Edward E Douglas III CCC PSP |
|
| Douglas | ADV.02 | WED 2:30-3:30 | Room M102 | (Panel Discussion - Part 2) Project Controls for
Natural Disaster Recovery | Mr Edward E Douglas III CCC PSP; Dr Randy R Rapp PE CCE |
|
| Draper | CSC.08 | WED 11:00-12:00 | Room M302 | Change Control That Saves Big Bucks!
| Mr. Dave Draper EVP |
|
| Dutton | PM.08 | WED 11:00-12:00 | Room M103 | Expanded Facility Condition Assessment Becomes
Strategic Facility Consulting | Mr Michael D Dell'Isola PE; Mr. Benjamin Dutton |
|
| Elnajaar | RISK.05 | TUE 8:00-9:00 | Room M104 | Risk Indentification and Response for
Construction Middle East | Mr Mohamed Hendy; Mr. Mohamed Talat; Mr. Mohamed Elnajaar |
|
| Evans | DEV.05 | TUE 1:45-2:45 | Room M103 | (Panel Discussion) Managing a Cost Engineer
Business Entity | Dr John O Evans III PSP |
|
| Evrenosoglu | PS.10 | TUE 3:30-4:30 | Room M106 | Thinking Enterprise with P6 | Mr Faik Burak Evrenosoglu CCE PSP |
|
| Evrenosoglu | CDR.13 | WED 1:15-2:15 | Room Int'l A | Differing Site Conditions - Why, What and
How? | Mr Faik Burak Evrenosoglu CCE PSP |
|
| Figueiredo | OWN.09 | TUE 1:45-2:45 | Room M102 | Developing and Implementing a Project
Knowledge Management System (PKMS) | Ms Cristina Figueiredo P Eng; Mr Ray S Philipenko P Eng |
|
| Findley | CDR.S01 | MON 3:45-4:45 | Room Int'l A | Changing the Boundaries of Client/Contractor Shared Risk | Mr Douglas Alan Findley CCC PSP
EVP |
|
| Foster | PS.01 | MON 10:00-11:00 | Room M106 | Schedule Quality Assurance
Procedures | Mr Andrew Avalon PE PSP; Mr. Curtis W. Foster |
|
| Franklin | SK.01 | MON 10:00-12:15 | Room M105 | Skills & Knowledge: Written and Oral
Communication | Mr Michael Steven Franklin CCE |
|
| Gaines | CDR.07 | TUE 11:00-12:00 | Room Int'l A | Practical Issues in Loss of Efficiency
Claims | Mr Robert A Dieterle CCE; Mr Thomas A Gaines |
|
| Gardiner | CDR.04 | MON 3:45-4:45 | Room Int'l A | Implications of Mandatory Court-Ordered Construction Mediation | Dr Aijbade Ayodeji Aibinu; Dr Lola Akin-Ojelabi; Blair Gardiner |
|
| Gholami | PM.01 | MON 10:00-11:00 | Room M103 | Factors Affecting Subcontracting Strategies in
Industrial Mega Projects | Ms Mahsa Taghi Zadeh; Dr Janaka Y Ruwanpura; Mr Farshid Gholami |
|
| Gholami | PM.03 | MON 2:00-3:00 | Room M103 | Cost Impact of Constructaility Analysis in Mega
Projects | Mr Farshid Gholami; Dr Janaka Y Ruwanpura; Ms Mahsa Taghi Zadeh |
|
| Gransberg | CSC.03 | TUE 11:00-12:00 | Room M302 | Infrastructure Asset Life Cycle Cost
Analysis Issues | Dr Douglas D Gransberg PE CCE; Mr. Eric Scheepbouwer |
|
| Gransberg | PS.09 | TUE 1:45-2:45 | Room M106 | Linear Scheduling for Production Home
Building | Ms. Carla Lopez del Puerto CCC; Dr Douglas D Gransberg PE CCE |
|
| Hagmann | EST.S03 | TUE 8:00-9:00 | Room Int'l B | Infrastructure Cost Planning - Information System for Cost Prediction | Mr. Christopher Hagmann; Dr Christian Stoy |
|
| Hanna | PM.10 | WED 2:30-3:30 | Room M103 | Integrated Project Management System: Dynamic EPC
Execution Strategies | Mr Mikhail Alfy Hanna |
|
| Hannon | DEV.01 | TUE 8:00-9:00 | Room M103 | Curriculum Development Based Upon TCM
Framework | Mr John Jeffrey Hannon CEP |
|
| Harmon | CDR.10 | WED 8:00-9:00 | Room Int'l A | Disadvantages and Advantages of Dispute Review
Boards | Dr Kathleen M J Harmon |
|
| Hendy | RISK.05 | TUE 8:00-9:00 | Room M104 | Risk Indentification and Response for
Construction Middle East | Mr Mohamed Hendy; Mr. Mohamed Talat; Mr. Mohamed Elnajaar |
|
| Heravi | PM.02 | MON 11:15-12:15 | Room M103 | Forecasting Construction Project Performance
Using Monte-Carlo Simulation Approach | Mr. Mohammad Ilbeigi; Dr Gholamreza Heravi |
|
| Hollmann | RISK.01 | MON 10:00-11:00 | Room M104 | Alternate Method For Integrated Cost &
Schedule Contingency Estimating | Mr John K Hollmann PE CCE CEP |
|
| Honsinger | EST.S01 | MON 5:00-6:00 | Room Int'l B | Developing A Long-Term Historical Cost Database | Mr Scott Newell Wasley CEP; Mr Joseph B Martin CCT; Mr. Robert Roy Honsinger CEP;Mr Bruce William Wallace CEP |
|
| Hulett | RISK.03 | MON 2:00-3:00 | Room M104 | Integrated Cost-Schedule Risk Analysis and
Prioritizing Risks | Dr David T. Hulett |
|
| Humes | OWN.02 | MON 11:15-12:15 | Room M102 | Front-End Engineering and Development (FEED)
Influence over a Project's Outcome | Mr James D Whiteside II PE; Mr. Tyler Humes |
|
| Hunt | CSC.02 | TUE 9:45-10:45 | Room M302 | Budgeting for Federal Buildings using Parametric Models | Mr William H Hunt CCC PSP CEP; Mr. Peter Henry Morris |
|
| Hyde | OWN.06 | MON 5:00-6:00 | Room M102 | Best Practices by Owners for Controlling Cost and Schedules on Large Projects | Ms Marlene M Hyde CCE EVP; Mr John P Orr PSP; Mr Michael E
Peek PE |
|
| Ilbeigi | PM.02 | MON 11:15-12:15 | Room M103 | Forecasting Construction Project Performance
Using Monte-Carlo Simulation Approach | Mr. Mohammad Ilbeigi; Dr Gholamreza Heravi |
|
| Inal | PS.03 | MON 2:00-3:00 | Room M106 | Project Controls and Planning of ATP During
Acceleration Period | Mr. Kayhan Sen; Dr. Fulya Inal |
|
| Itagi | OWN.04 | MON 3:45-4:45 | Room M102 | Stumbling Blocks in Implementing Project Controls
Standards in Small to Midsize Owner | Mr. Subhash (P.Eng) Itagi PMP,RMP,SP PSP, CCE |
|
| Iyer | EVM.02 | MON 11:15-12:15 | Room M302 | Implementing an EVMS/Cost Controls System for
FAA's TAMR Program | Mr Mark Walden; Mr Tom Brown; Mr Rohit Iyer |
|
| Jackson | PS.11 | TUE 4:45-5:45 | Room M106 | P6 Lessons Learned -- Schedule
Development | Ms Hannah E Schumacher PSP; Mr Charlie Jackson |
|
| Kelly | EVM.04 | MON 3:45-4:45 | Room M302 | Mitigation and Performance Recovery Using Earned
Value | Mr. John C. Potter PSP; Mr Christopher W Carson PSP; Mr Patrick M. Kelly PSP |
|
| Kim | RISK.15 | WED 2:30-3:30 | Room M104 | A Risk Visualizing Method by Object-oriented
Model | Dr Jae-Seob Lee; Woo-Ram Kim |
|
| Kitson | RISK.11 | WED 8:00-9:00 | Room M104 | Schedule Risk Management for Pipeline
Projects | Ms Renna Alqasrani; Mr Brent Kitson P Eng; Mr Richa Sahib |
|
| Kraus | DEV.03 | TUE 11:00-12:00 | Room M103 | Increasing Productivity in a Volunteer
Organization | Mr William E Kraus PE CCE; Mr Patrick Steven Ray CCC |
|
| Kumar | RISK.S02 | TUE 4:45-5:45 | Room M104 | Risk Assessment & Quantification for Technology Projects | Mr Amit Kumar |
|
| Kuprenas | CSC.04 | TUE 1:45-2:45 | Room M302 | Influence of Green Building on Project
Costs | Dr. John A. Kuprenas PE |
|
| Larson | COM.07 | TUE 4:15-5:45 | Room M102 | BIM Committee Meeting | Mr Philip D Larson CCE PSP CEP |
|
| Larson | EST.02 | MON 11:15-12:15 | Room Int'l B | Web Technology - Centralized & Collaborative
Estimating | Mr Philip D Larson CCE PSP CEP; Mr. Stephen F. Williams |
|
| Lee | RISK.15 | WED 2:30-3:30 | Room M104 | A Risk Visualizing Method by Object-oriented
Model | Dr Jae-Seob Lee; Woo-Ram Kim |
|
| Leo | COM.02 | MON 5:00-6:00 | Room Int'l B | Cost Estimating Committee
Meeting | Mr Bernard A Pietlock CCC CEP; Mr. Douglas W Leo, CCC CEP
MRICS |
|
| Livengood | COM.03 | MON 5:00-6:00 | Room Int'l A | Claims and Dispute Resolution Committee
Meeting (1) | Mr John C Livengood CFCC |
|
| Livengood | CDR.06 | TUE 9:45-10:45 | Room Int'l A | The As-Built Critical Path - Quest or
Discovery? | Mr John C Livengood CFCC; Mr. Jeffery L. Ottesen PE PSP CFCC |
|
| Livengood | COM.04 | TUE 4:45-5:45 | Room Int'l A | Claims and Dispute Resolution Committee
Meeting (2) | Mr John C Livengood CFCC |
|
| Lofton | EST.S02 | TUE 9:45-10:45 | Room Int'l B | Estimate Conversion to Historical Model | Mr. Robert J. Coppo; Mr. Waymon D. Lofton |
|
| Lopez del Puerto | PS.09 | TUE 1:45-2:45 | Room M106 | Linear Scheduling for Production Home
Building | Ms. Carla Lopez del Puerto CCC; Dr Douglas D Gransberg PE CCE |
|
| Lucas | OWN.05 | TUE 8:00-9:00 | Room M102 | Integrated Project Controls: An Owner's
Perspective | Mr. David Andrew Lucas |
|
| Lukas | PM.04 | MON 3:45-4:45 | Room M103 | Top 10 Mistakes Made in Project
Negotiations | Mr Joseph Arthur Lukas PE CCE |
|
| Madl | DEV.02 | TUE 9:45-10:45 | Room M103 | Downstream Schedule Analysis for NON-
Schedulers | Ms Amanda M Madl |
|
| Marshall | COM.06 | TUE 4:45-5:45 | Room M302 | Earned Value Management Committee Meeting |
Dr. Rorbert A Marshall |
|
| Martin | CDR.03 | MON 2:00-3:00 | Room Int'l A | CPMs Half Century Gold Rush | Mr.
Jeffery L. Ottesen PE PSP CFCC; Ms Greta A Martin PSP |
|
| Martin | EST.S01 | MON 5:00-6:00 | Room Int'l B | Developing A Long-Term Historical Cost Database | Mr Scott Newell Wasley CEP; Mr Joseph B Martin CCT; Mr. Robert Roy Honsinger CEP;Mr Bruce William Wallace CEP |
|
| Martinez | CDR.12 | WED 11:00-12:00 | Room Int'l A | Dealing With Cumulative Impact
Claims | Ms Emelyn Warde Martinez CCC |
|
| Matas | SK.05 | WED 8:00-12:00 | Room M105 | Skills & Knowledge: Earned Value | Dr
Sean Thomas Regan CCE CEP; Ms Lisa Dianne Matas EVP |
|
| Mattos | EVM.S01 | MON 5:00-6:00 | Room M302 | Monitoring Productivity with EVA |
Mr Aldo Dorea Mattos; Mr Richard Delarue |
|
| McCuen | BIM.01 | WED 8:00-9:00 | Room M102 | Underdeveloped and Underutilized: Cost Estimating
in BIM | Ms Tamera Lee McCuen |
|
| McDonald | SK.06 | WED 1:15-3:45 | Room M105 | Skills & Knowledge: Change Management for EPC
Contracting | Mr Donald F McDonald Jr PE CCE PSP |
|
| Mills | EST.13 | WED 11:00-12:00 | Room Int'l B | Nuclear Decommissioning Cost Estimate
Lifecycle Management | Mr Mark Mills |
|
| Montler | BIM.03 | WED 11:00-12:00 | Room M102 |
Sharing Project Data Reduces
Conflict | Mr William R Zollinger III PE; Mr. David L. Sutton PE; Mr. Gary R. Montler PSP; Mr. Mark M. Seifried PE |
|
| Morris | CSC.02 | TUE 9:45-10:45 | Room M302 | Budgeting for Federal Buildings using Parametric Models | Mr William H Hunt CCC PSP CEP; Mr. Peter Henry Morris |
|
| Morris | PM.07 | WED 9:45-10:45 | Room M103 | Enterprise Project/Cost Management Systems
Implementation -- Lessons Learned | Mr Anthony Jerome Morris |
|
| Morrison | EST.11 | WED 8:00-9:00 | Room Int'l B | Organizational Considerations for Bidding
and Pricing Work | Mr Eric Ryan Morrison CCT |
|
| Nagata | CDR.02 | MON 11:15-12:15 | Room Int'l A | Which Critical Path: As-Planned,
Contemporaneous, or As-Built? | Mr Mark F Nagata |
|
| Neidecker | CSC.S01 | WED 8:00-9:00 | Room M302 | Value Engineering Applications in Construction | Mr Thomas H Neidecker PE |
|
| Nalewaik | CSC.10 | TUE 3:30-4:30 | Room M103 | Change is the Only Constant | Ms
Alexia A Nalewaik MRICS CCE |
|
| Nalewaik | CSC.S12 | TUE 4:45-5:45 | Room M103 | Controls and Audit Devices for Claims Management | Ms
Alexia A Nalewaik MRICS CCE |
|
| Nelson | OWN.07 | TUE 9:45-10:45 | Room M102 | Addressing the Uncertainty Associated with
Integrated Project Delivery | Mr John R Spittler PE; Mr Eric Nelson |
|
| Nosbisch | EVM.01 | MON 10:00-11:00 | Room M302 | ECI: The Future of EVM in Defense
Contracting? | Mr Michael R Nosbisch CCC PSP |
|
| O'Neill | RISK.06 | TUE 9:45-10:45 | Room M104 | Steel Fabrication Costs in China: Myth versus
Reality | Mr Stephen O'Neill; Mrs Limor Rozmarin |
|
| Orczyk | SK.03 | TUE 8:00-12:00 | Room M105 | Skills & Knowledge: Planning and
Scheduling | Dr Joseph J Orczyk PE; Dr Randy R Rapp PE CCE |
|
| Orczyk | SK.04 | TUE 1:45-5:45 | Room M105 | Skills & Knowledge: Statusing for Progress and
Forecasting Trends | Dr Joseph J Orczyk PE; Dr Randy R Rapp PE CCE |
|
| Orr | OWN.03 | MON 2:00-3:00 | Room M102 | Timely Time Extensions: The Owner's
Duty | Mr John P Orr PSP |
|
| Orr | OWN.06 | MON 5:00-6:00 | Room M102 | Best Practices by Owners for Controlling Cost and Schedules on Large Projects | Ms Marlene M Hyde CCE EVP; Mr John P Orr PSP; Mr Michael E Peek PE |
|
| Orsinellli | EST.S05 | TUE 1:45-2:45 | Room Int'l B | Using Equipment Costs to Estimate Total Conceptual Level Costs | Mr Desmond Orsinelli PE CEP |
|
| Ortego | OWN.08 | TUE 11:00-12:00 | Room M102 | The Unexpected Cost of Contract Multiplier
Calculation Methods | Mr. Jack Ortego PE |
|
| Ottesen | CDR.03 | MON 2:00-3:00 | Room Int'l A | CPMs Half Century Gold Rush | Mr.
Jeffery L. Ottesen PE PSP CFCC; Ms Greta A Martin PSP |
|
| Ottesen | CDR.06 | TUE 9:45-10:45 | Room Int'l A | The As-Built Critical Path - Quest or
Discovery? | Mr John C Livengood CFCC; Mr. Jeffery L. Ottesen PE PSP CFCC |
|
| Owen | PM.05 | MON 5:00-6:00 | Room M103 | Los Angeles $40 Billion Transportation Program Using
P6 | Ms Julie K Owen CCC PSP; Mr. Brian Criss |
|
| Palmer | PS.08 | TUE 11:00-12:00 | Room M106 | Planning A Complex Project -- An Under
Appreciated Effort | Mr Christopher W Carson PSP; Mr Glen R Palmer PSP CFCC |
|
| Peek | OWN.06 | MON 5:00-6:00 | Room M102 | Best Practices by Owners for Controlling Cost and Schedules on Large Projects | Ms Marlene M Hyde CCE EVP; Mr John P Orr PSP; Mr Michael E Peek PE |
|
| Peng | EST.12 | WED 9:45-10:45 | Room Int'l B | Mathematical models of contingency for errors
of omission | Dr Steve Davis; Yuan Peng |
|
| Philipenko | OWN.09 | TUE 1:45-2:45 | Room M102 | Developing and Implementing a Project
Knowledge Management System (PKMS) | Ms Cristina Figueiredo P Eng; Mr Ray S Philipenko P Eng |
|
| Pietlock | OWN.01 | MON 10:00-11:00 | Room M102 | Why Owners Do What They Do | Mr
Bernard A Pietlock CCC CEP |
|
| Pietlock | COM.02 | MON 5:00-6:00 | Room Int'l B | Cost Estimating Committee
Meeting | Mr Bernard A Pietlock CCC CEP; Mr. Douglas W Leo, CCC CEP
MRICS |
|
| Pille | EST.15 | WED 2:30-3:30 | Room Int'l B | Estimating and Pre-Contracts Quantity
Surveying | Mr Paratharajan Natarajan Pille |
|
| Plotnick | CDR.08 | TUE 1:45-2:45 | Room Int'l A | Evidence Issues in Forensic Use of CPM
Scheduling | Dr. Fredric L. Plotnick PE |
|
| Ponce de Leon | PS.12 | WED 8:00-9:00 | Room M106 | Phantom Float - Caveat Emptor | Dr
Gui Ponce de Leon; Mr John M Zann PE PSP |
|
| Potter | EVM.04 | MON 3:45-4:45 | Room M302 | Mitigation and Performance Recovery Using Earned
Value | Mr. John C. Potter PSP; Mr Christopher W Carson PSP; Mr Patrick M. Kelly PSP |
|
| Potter | PS.14 | WED 1:15-2:15 | Room M106 | (Panel Discussion) The Great Debate: "Should
Schedule Revisions Require Owner Approval?" | Mr Christopher W Carson PSP; Mr Mark C Sanders PE CCE PSP; Mr John James Stauffer PSP; Mr. John C. Potter PSP |
|
| Prentice | CDR.11 | WED 9:45-10:45 | Room Int'l A | The Spearin Doctrine
Revisited | Mr Jean-Paul Prentice CCE |
|
| Rahbar | PS.05 | MON 5:00-6:00 | Room M106 | Rapid Recovery from Schedule Slippage (RRSS)
| Dr Faramarz Fred Rahbar |
|
| Rapp | SK.03 | TUE 8:00-12:00 | Room M105 | Skills & Knowledge: Planning and
Scheduling | Dr Joseph J Orczyk PE; Dr Randy R Rapp PE CCE |
|
| Rapp | SK.04 | TUE 1:45-5:45 | Room M105 | Skills & Knowledge: Statusing for Progress and
Forecasting Trends | Dr Joseph J Orczyk PE; Dr Randy R Rapp PE CCE |
|
| Rapp | ADV.01 | WED 1:15-2:15 | Room M102 | (Panel Discussion - Part 1) Planning for Post-
Disaster Project Controls | Dr Randy R Rapp PE CCE; Mr Edward E Douglas III CCC PSP |
|
| Rapp | ADV.02 | WED 2:30-3:30 | Room M102 | (Panel Discussion - Part 2) Project Controls for
Natural Disaster Recovery | Mr Edward E Douglas III CCC PSP; Dr Randy R Rapp PE CCE |
|
| Ray | DEV.03 | TUE 11:00-12:00 | Room M103 | Increasing Productivity in a Volunteer
Organization | Mr William E Kraus PE CCE; Mr Patrick Steven Ray CCC |
|
| Ray | CDR.09 | TUE 3:30-4:30 | Room Int'l A | Bumps in the Road on the Way to
Trial | Mr Michael C Ray PE CCE PSP |
|
| Regan | SK.05 | WED 8:00-12:00 | Room M105 | Skills & Knowledge: Earned Value | Dr
Sean Thomas Regan CCE CEP; Ms Lisa Dianne Matas EVP |
|
| Rozmarin | RISK.06 | TUE 9:45-10:45 | Room M104 | Steel Fabrication Costs in China: Myth
versus Reality | Mr Stephen O'Neill; Mrs Limor Rozmarin |
|
| Ruwanpura | PM.01 | MON 10:00-11:00 | Room M103 | Factors Affecting Subcontracting Strategies in
Industrial Mega Projects | Ms Mahsa Taghi Zadeh; Dr Janaka Y Ruwanpura; Mr Farshid Gholami |
|
| Ruwanpura | PM.03 | MON 2:00-3:00 | Room M103 | Cost Impact of Constructaility Analysis in Mega
Projects | Mr Farshid Gholami; Dr Janaka Y Ruwanpura; Ms Mahsa Taghi Zadeh |
|
| Ruwanpura | PS.04 | MON 3:45-4:45 | Room M106 | A New Algorithm for Project Activity
Overlapping | Mr Reza Dehghan; Dr Janaka Y Ruwanpura |
|
| Ruwanpura | PM.09 | WED 1:15-2:15 | Room M103 | Integrated project teams with multi office
execution, A Study of EPC Project/s in Canada | Dr Pattita Brandell; Mr Tanveer Nabi Ahmed CCE; Dr Janaka Y Ruwanpura |
|
| Sahib | RISK.11 | WED 8:00-9:00 | Room M104 | Schedule Risk Management for Pipeline
Projects | Ms Renna Alqasrani; Mr Brent Kitson P Eng; Mr Richa Sahib |
|
| Sandberg | RISK.S03 | WED 11:00-12:00 | Room M104 | Why Is Risk So Hard To Communicate? | Mr Finn H. Sandberg |
|
| Sanders | PS.14 | WED 1:15-2:15 | Room M106 | (Panel Discussion) The Great Debate: "Should
Schedule Revisions Require Owner Approval?" | Mr Christopher W Carson PSP; Mr Mark C Sanders PE CCE PSP; Mr John James Stauffer PSP; Mr. John C. Potter PSP |
|
| Scheepbouwer | CSC.03 | TUE 11:00-12:00 | Room M302 | Infrastructure Asset Life Cycle Cost
Analysis Issues | Dr Douglas D Gransberg PE CCE; Mr. Eric Scheepbouwer |
|
| Schumacher | PS.11 | TUE 4:45-5:45 | Room M106 | P6 Lessons Learned -- Schedule
Development | Ms Hannah E Schumacher PSP; Mr Charlie Jackson |
|
| Seifried | BIM.03 | WED 11:00-12:00 | Room M102 | Sharing Project Data Does Reduce
Conflict | Mr William R Zollinger III PE; Mr. David L. Sutton PE; Mr. Gary R. Montler PSP; Mr. Mark M. Seifried PE |
|
| Sen | PS.03 | MON 2:00-3:00 | Room M106 | Project Controls and Planning of ATP During
Acceleration Period | Mr. Kayhan Sen; Dr. Fulya Inal |
|
| Serpell | EST.14 | WED 1:15-2:15 | Room Int'l B | Modeling projects' scope for conceptual cost
estimating | Mr Alfredo F Serpell |
|
| Shaikh | PS.02 | MON 11:15-12:15 | Room M106 | LOB Scheduling Application to a Particular
Operation Within a Large-Scale Project | Mr Ghulam Mujtaba Shaikh |
|
| Smith | RISK.12 | WED 9:45-10:45 | Room M104 | PRI (Performance Risk Index) Analysis: Doing
the Basics Right | Mr. Michael J. Smith |
|
| Spittler | OWN.07 | TUE 9:45-10:45 | Room M102 | Addressing the Uncertainty Associated with
Integrated Project Delivery | Mr John R Spittler PE; Mr Eric Nelson |
|
| Stauffer | PS.14 | WED 1:15-2:15 | Room M106 | (Panel Discussion) The Great Debate: "Should
Schedule Revisions Require Owner Approval?" | Mr Christopher W Carson PSP; Mr Mark C Sanders PE CCE PSP; Mr John James Stauffer PSP; Mr. John C. Potter PSP |
|
| Stoy | EST.S03 | TUE 8:00-9:00 | Room Int'l B | Infrastructure Cost Planning - Information System for Cost Prediction | Mr. Christopher Hagmann; Dr Christian Stoy |
|
| Sutton | BIM.03 | WED 11:00-12:00 | Room M102 | Sharing Project Data Does Reduce
Conflict | Mr William R Zollinger III PE; Mr. David L. Sutton PE; Mr. Gary R. Montler PSP; Mr. Mark M. Seifried PE |
|
| Talat | RISK.05 | TUE 8:00-9:00 | Room M104 | Risk Indentification and Response for
Construction Middle East | Mr Mohamed Hendy; Mr. Mohamed Talat; Mr. Mohamed Elnajaar |
|
| Touran | RISK.14 | WED 1:15-2:15 | Room M104 | Effect of Escalation on Large Construction
Programs | Dr Ali Touran PE; Mr. Payam Bakhshi |
|
| Uppal | EST.01 | MON 10:00-11:00 | Room Int'l B | Pitfalls of Early Estimates and Scope
Definition | Mr Kul B Uppal PE CEP |
|
| Valdahl | RISK.08 | TUE 1:45-2:45 | Room M104 | Understanding Merge Bias in Schedule Risk
Analysis | Mr. Jeffrey Valdahl; Mr Christopher P Caddell PE |
|
| Verveniotis | OWN.10 | TUE 3:30-4:30 | Room M102 | Fully-Automated Cash Flow
Forecasting | Mr Paul Verveniotis PE |
|
| Wageman | CSC.05 | TUE 3:30-4:30 | Room M302 | Project Baseline Management and Change
Control | Mr Steven W Wageman CCC PSP EVP |
|
| Walden | EVM.02 | MON 11:15-12:15 | Room M302 | Implementing an EVMS/Cost Controls System for
FAA's TAMR Program | Mr Mark Walden; Mr Tom Brown; Mr Rohit Iyer |
|
| Wallace | EST.S01 | MON 5:00-6:00 | Room Int'l B | Developing A Long-Term Historical Cost Database | Mr Scott Newell Wasley CEP; Mr Joseph B Martin CCT; Mr. Robert Roy Honsinger CEP;Mr Bruce William Wallace CEP |
|
| Wasley | EST.S01 | MON 5:00-6:00 | Room Int'l B | Developing A Long-Term Historical Cost Database | Mr Scott Newell Wasley CEP; Mr Joseph B Martin CCT; Mr. Robert Roy Honsinger CEP;Mr Bruce William Wallace CEP |
|
| Watt | EST.04 | MON 3:45-4:45 | Room Int'l B | Leveraging Cost History to Accurately Respond to
Future Opportunities | Mr. Steve Watt |
|
| Wells | RISK.04 | MON 3:45-4:45 | Room M104 | Systemic Risk Management Using Lean Construction
Methods | Mr Robert F Wells CEP |
|
| Whiteside | OWN.02 | MON 11:15-12:15 | Room M102 | Front-End Engineering and Development (FEED)
Influence over a Project's Outcome | Mr James D Whiteside II PE; Mr. Tyler Humes |
|
| Williams | EST.02 | MON 11:15-12:15 | Room Int'l B | Web Technology - Centralized &
Collaborative Estimating | Mr Philip D Larson CCE PSP CEP; Mr. Stephen F. Williams |
|
| Winter | COM.01 | WED 11:00-12:00 | Room M106 | Planning and Scheduling Committee
Meeting | Mr. Ronald M Winter PSP |
|
| Winter | PS.15 | WED 2:30-3:30 | Room M106 | Rectification of CPM Schedules | Mr.
Ronald M Winter PSP |
|
| Woodward | SK.02 | MON 12:00-6:00 | Room M105 | Skills & Knowledge: Estimating | Mr
Charles P Woodward PE CCE CEP |
|
| Zadeh | PM.01 | MON 10:00-11:00 | Room M103 | Factors Affecting Subcontracting Strategies in
Industrial Mega Projects | Ms Mahsa Taghi Zadeh; Dr Janaka Y Ruwanpura; Mr Farshid Gholami |
|
| Zadeh | PM.03 | MON 2:00-3:00 | Room M103 | Cost Impact of Constructaility Analysis in Mega
Projects | Mr Farshid Gholami; Dr Janaka Y Ruwanpura; Ms Mahsa Taghi Zadeh |
|
| Zann | PS.12 | WED 8:00-9:00 | Room M106 | Phantom Float - Caveat Emptor | Dr Gui
Ponce de Leon; Mr John M Zann PE PSP |
|
| Zollinger | BIM.03 | WED 11:00-12:00 | Room M102 | Sharing Project Data Does Reduce
Conflict | Mr William R Zollinger III PE; Mr. David L. Sutton PE; Mr. Gary R. Montler PSP; Mr. Mark M. Seifried PE |