| Last | Track | Time | Room | Title | AllAuthors |
| Ahmad | OWN-1301 | TUE 11:00-12:00 | Wilson B | Project Controls Systems Implementation for Owners | Mr Aftab Ahmad; Ms Peggy Chao |
| Al-Gahtani | CDR-1353 | SUN 4:30-5:30 | Wilson C | Responsibility of Nonworking Days in Analyzing Delay Claims | Dr Khalid S Al-Gahtani; Mr Ibrahim A. Al-Sulaihu; Dr Abdullah Alsehaimi |
| Alkuwari | PS-1357 | MON 11:15-12:15 | Wilson B | Schedule Update Analysis: Retained Logic versus Progress Override | Mr Devdas K Tamboli CCE PSP; Ms Julie K Owen CCC PSP; Mr Ahmad Ali Ahmed Alkuwari |
| Alsehaimi | CDR-1353 | SUN 4:30-5:30 | Wilson C | Responsibility of Nonworking Days in Analyzing Delay Claims | Dr Khalid S Al-Gahtani; Mr Ibrahim A. Al-Sulaihu; Dr Abdullah Alsehaimi |
| Al-Sulaihu | CDR-1353 | SUN 4:30-5:30 | Wilson C | Responsibility of Nonworking Days in Analyzing Delay Claims | Dr Khalid S Al-Gahtani; Mr Ibrahim A. Al-Sulaihu; Dr Abdullah Alsehaimi |
| Andersen | PS-1347 | SUN 4:30-5:30 | Wilson B | Staying out of Legal Trouble through Effective Schedule Practice | Mr Michael Andersen |
| Anderson | IND-1454 | MON 5:00-6:00 | Taylor | Industry Focus: U.S Federal Government - (Presentation) Fifteen Undeniable Truths About Project Cost Estimates, or Why You Need an Independent Cost Estimate | Mr Jim Baratta; Mr Timothy P Anderson |
| Annis | PM-1229 | TUE 9:45-10:45 | Wilson A | Using Complexity Footprints to Manage Complexity in Construction Projects | Mr Isaac Annis; Dr Kelly Strong; Dr Carla Lopez del Puerto CCC; Dr Rebecca Atadero |
| Anzidei | CDR-1404 | TUE 11:00-12:00 | Wilson C | Adapting Alternative Dispute Resolution to Meet the Demands of Modern Projects | Mr Christopher M. Anzidei; Mr Christopher J Brasco; Mr Adam M Tuckman; Mr Blake V. Peck PE; Mr Brian M. Perlberg |
| Atadero | PM-1229 | TUE 9:45-10:45 | Wilson A | Using Complexity Footprints to Manage Complexity in Construction Projects | Mr Isaac Annis; Dr Kelly Strong; Dr Carla Lopez del Puerto CCC; Dr Rebecca Atadero |
| Badala | CDR-1240 | MON 10:00-11:00 | Wilson C | Trends in International Construction Arbitration | Mr Peter V. Badala; Mr James G Zack Jr CFCC |
| Baratta | IND-1454 | MON 5:00-6:00 | Taylor | Industry Focus: U.S Federal Government - (Presentation) Fifteen Undeniable Truths About Project Cost Estimates, or Why You Need an Independent Cost Estimate | Mr Jim Baratta; Mr Timothy P Anderson |
| Barnard | CDR-1256 | MON 2:00-3:00 | Wilson C | Challenges of the Measured Mile Concept for Productivity Loss Claims | Mr Philip D Barnard PE CCE |
| Basche | EVM-1390 | TUE 3:45-4:45 | Harding | EVM Self-Surveillance Approach | Ms Sheri L. Crowe EVP; Ms Amy D Basche |
| Bastianelli | RISK-1408 | MON 3:45-4:45 | Hoover | Project Development and Strategies for Success | Mr Lawrence A Bastianelli CCE; Mr Terry Yeager; Mr Bradley D. Wolf PE; Mr Richard D. Fultineer |
| Binet | EST-1310 | WED 9:45-10:45 | Coolidge | Estimating Escalation Costs for Thermal Power Plants | Mr Bruno N. Rodrigues; Ms Clemence R. Dawed; Mr Antoine de Chillaz; Mr Bastien Durand; Mr Sebastien Binet |
| Bolyard | EVM-1262 | TUE 11:00-12:00 | Harding | Earned Value Analysis and CPM Schedule Review in Construction | Ms Omoniyi O. Ladipo CCE EVP; Mr Charles E Bolyard Jr CFCC PSP; Ms Mairav R. Mintz PE |
| Bonilla | COM-1477 | MON 5:00-6:00 | Harding | Mining and Mineral Processing Industries SIG Meeting | Mr Nelson E Bonilla CCE |
| Borowicz | COM-1441 | TUE 5:00-6:00 | Hoover | Utilities and Energy SIG Meeting | Mr Jeffery J Borowicz CCC CEP PSP |
| Brady | RISK-1241 | MON 10:00-11:00 | Hoover | (Presentation) Planning for Risk Management - A Review of Recommended Practice 72R-12 | Mr David C. Brady P.Eng. |
| Bramble | RISK-1330 | TUE 2:00-3:00 | Hoover | Use of Dynamic Progress Method (DPM) on Guaranteed Maximum Price (GMP) Contracts | Mr Mark P. McDowell CCC PSP; Mr Barry B. Bramble; Mr J. Chris White |
| Brasco | CDR-1404 | TUE 11:00-12:00 | Wilson C | Adapting Alternative Dispute Resolution to Meet the Demands of Modern Projects | Mr Christopher M. Anzidei; Mr Christopher J Brasco; Mr Adam M Tuckman; Mr Blake V. Peck PE; Mr Brian M. Perlberg |
| Cabano | OWN-1286 | TUE 9:45-10:45 | Wilson B | Owner Gaps in Project Control – An Industry Overview | Mr Steven T. Cuneo; Mr Stephen L. Cabano |
| Caddell | COM-1449 | MON 5:00-6:00 | Hoover | Decision and Risk Management Subcommittee Meeting | Mr Christopher P Caddell PE CCE |
| Campbell | OWN-1434 | WED 9:45-10:45 | Wilson A | Public Private Partnerships: A Sustainable Procurement Option for Highways | Dr Andries C. Hauptfleisch; Dr Malene M. Campbell |
| Carson | PS-1386 | MON 2:00-3:00 | Wilson B | Planning and Facilitating a Schedule Risk Workshop | Mr Christopher W Carson PSP |
| Chao | OWN-1301 | TUE 11:00-12:00 | Wilson B | Project Controls Systems Implementation for Owners | Mr Aftab Ahmad; Ms Peggy Chao |
| Chen | OTH-1429 | MON 3:45-4:45 | Coolidge | Personal Financial Management for Cost Professionals | Mr Mark T Chen PE CCE |
| Cholakis | PM-1219 | TUE 2:00-3:00 | Wilson A | Project Delivery Methods of the Future, Cloud Computing, and BIM | Mr Peter N. Cholakis; Mr Nicholas Cholakis |
| Cholakis | PM-1219 | TUE 2:00-3:00 | Wilson A | Project Delivery Methods of the Future, Cloud Computing, and BIM | Mr Peter N. Cholakis; Mr Nicholas Cholakis |
| Cirafesi | INT-1423 | WED 11:00:12:00 | Harding | Globalizing a Project Process - Lessons Learned | Mr Joeseph J. Cirafesi |
| Crowe | EVM-1390 | TUE 3:45-4:45 | Harding | EVM Self-Surveillance Approach | Ms Sheri L. Crowe EVP; Ms Amy D Basche |
| Crowley | INT-1335 | TUE 11:00-12:00 | Coolidge | Understanding and Estimating Skilled Labor Shortages | Ms Laura Hodges; Ms Emily Crowley |
| Cuneo | OWN-1286 | TUE 9:45-10:45 | Wilson B | Owner Gaps in Project Control – An Industry Overview | Mr Steven T. Cuneo; Mr Stephen L. Cabano |
| Dawed | EST-1310 | WED 9:45-10:45 | Coolidge | Estimating Escalation Costs for Thermal Power Plants | Mr Bruno N. Rodrigues; Ms Clemence R. Dawed; Mr Antoine de Chillaz; Mr Bastien Durand; Mr Sebastien Binet |
| de Chillaz | EST-1310 | WED 9:45-10:45 | Coolidge | Estimating Escalation Costs for Thermal Power Plants | Mr Bruno N. Rodrigues; Ms Clemence R. Dawed; Mr Antoine de Chillaz; Mr Bastien Durand; Mr Sebastien Binet |
| Dell'Isola | PM-1417 | MON 11:15-12:15 | Harding | Better Utilizing Value Engineering in Project Delivery | Mr Michael D. Dell'Isola PE |
| DiCianni | CDR-1436 | TUE 3:45-4:45 | Wilson C | Generating Claims through Contract Provisions and Management Practices | Mr Mark F Nagata PSP; Mr Frank DiCianni |
| Dixit | CSC-1430 | SUN 2:45-3:45 | Wilson A | Developing a Project Control System for a Transmission Grid | Mr Vidya C Dixit CCE PSP; Mr Mark von Leffern EVP PSP |
| Dorr | EST-1342 | WED 8:00-9:00 | Coolidge | FACTS: Factors, Analogies, CERs & Tools/Studies for Government Acquisitions | Ms Ruth Dorr; Mr Daniel J. Harper |
| Dougherty | EST-1239 | TUE 8:00-9:00 | Coolidge | The Impact of Rework on Construction and Some Practical Remedies | Mr Jason M. Dougherty; Mr Nigel Hughes; Mr James G Zack Jr CFCC |
| Driessnack | IND-1453 | MON 3:45-4:45 | Taylor | Industry Focus: U.S Federal Government - (Presentation) Risk & Opportunity Management in the Federal Government and Academia | Dr Homayoun Khamooshi; Mr John D. Driessnack |
| Druker | PM-1203 | TUE 8:00-9:00 | Wilson A | Analytical Program Management: Integrating Cost, Schedule, and Risk | Mr Eric Druker; Graham Gilmer |
| Dungan | CDR-1246 | MON 11:15-12:15 | Wilson C | Avoiding the Pitfalls in Implementing the Measured Mile Method | Dr Tong Zhao PE PSP; Mr J. Mark Dungan |
| Durand | EST-1310 | WED 9:45-10:45 | Coolidge | Estimating Escalation Costs for Thermal Power Plants | Mr Bruno N. Rodrigues; Ms Clemence R. Dawed; Mr Antoine de Chillaz; Mr Bastien Durand; Mr Sebastien Binet |
| Dysert | EST-1394 | MON 10:00-11:00 | Coolidge | (Presentation) The AACE Recommended Practice on the Principles of Estimate Accuracy | Mr Larry R Dysert CCC CEP |
| Dysert | OWN-1393 | TUE 2:00-3:00 | Wilson B | The Owner’s Estimate Requirements Document | Mr Larry R Dysert CCC CEP |
| Florence | EST-1199 | TUE 9:45-10:45 | Coolidge | Maintaining Definable Labor Rates for Deterministic Estimates | Mr Leland Kim Florence CEP |
| Fultineer | RISK-1408 | MON 3:45-4:45 | Hoover | Project Development and Strategies for Success | Mr Lawrence A Bastianelli CCE; Mr Terry Yeager; Mr Bradley D. Wolf PE; Mr Richard D. Fultineer |
| Gilmer | PM-1203 | TUE 8:00-9:00 | Wilson A | Analytical Program Management: Integrating Cost, Schedule, and Risk | Mr Eric Druker; Graham Gilmer |
| Godbee | PS-1379 | MON 5:00-6:00 | Wilson B | How to Improve Schedule Implementation and Practices | Mr W Roy Godbee Jr; Mr Kenneth Thrower |
| Goldhorn | EVM-1280 | TUE 9:45-10:45 | Harding | LOE and AE Earned Value Calculation | Mr Paul E Goldhorn |
| Griesmyer | SK-1473 | TUE 9:45-12:00 | Taylor | Skills and Knowledge of Cost Engineering: Planning and Scheduling | Mr Peter W Griesmyer |
| Gupta | EST-1411 | TUE 3:45-4:45 | Coolidge | Construction Indirect Estimate Challenges and Opportunities | Mr Rakesh K. Gupta |
| Harper | EST-1342 | WED 8:00-9:00 | Coolidge | FACTS: Factors, Analogies, CERs & Tools/Studies for Government Acquisitions | Ms Ruth Dorr; Mr Daniel J. Harper |
| Hart | CDR-1212 | SUN 1:30-2:30 | Wilson C | Forensic Analysis of Superstorm Sandy Damage | Mr William M Hart PE CFCC PSP |
| Hartman | RISK-1237 | MON 2:00-3:00 | Hoover | Capital Investment Decisions: Two Teams with Differing Intentions | Ms Diana Nada; Dr Francis T Hartman P.Eng. |
| Hauptfleisch | OWN-1434 | WED 9:45-10:45 | Wilson A | Public Private Partnerships: A Sustainable Procurement Option for Highways | Dr Andries C. Hauptfleisch; Dr Malene M. Campbell |
| Havranek | RISK-1317 | SUN 1:30-2:30 | Hoover | Conducting Risk Assessments Using a Combined Cost and Schedule Model | Mr Timothy J. Havranek; Ms Leigh Hostetter |
| Hodges | INT-1335 | TUE 11:00-12:00 | Coolidge | Understanding and Estimating Skilled Labor Shortages | Ms Laura Hodges; Ms Emily Crowley |
| Hombach | IT-1274 | MON 10:00-11:00 | McKinley | Building a Cross-Cutting Historical Cost Database for Mega-Projects | Mr William G Hombach CCC; Mr Peter C. Sanford |
| Hong | BIM-1415 | MON 3:45-4:45 | McKinley | BIM Based Cost Management for Large Scale Construction Projects | Mr Sandy MacElheron; Dr Gang Hong P.Eng.; Mr Ben Swan |
| Hoshino | CDR-1382 | TUE 9:45-10:45 | Wilson C | Schedule Activity Density Analysis | Mr Jeffery L. Ottesen PE CFCC PSP; Mr Kenji P Hoshino CFCC PSP |
| Hostetter | RISK-1317 | SUN 1:30-2:30 | Hoover | Conducting Risk Assessments Using a Combined Cost and Schedule Model | Mr Timothy J. Havranek; Ms Leigh Hostetter |
| Hughes | EST-1239 | TUE 8:00-9:00 | Coolidge | The Impact of Rework on Construction and Some Practical Remedies | Mr Jason M. Dougherty; Mr Nigel Hughes; Mr James G Zack Jr CFCC |
| Hulett | RISK-1238 | MON 11:15-12:15 | Hoover | Use Decision Trees to Make Important Project Decisions | Dr David T. Hulett |
| Hunter | SK-1474 | TUE 2:00-6:00 | Taylor | Skills and Knowledge of Cost Engineering: Earned Value Management | Ms Kimberly Anne Hunter EVP; Ms Kimberly Meyer |
| Jackson | PS-1290 | MON 10:00-11:00 | Wilson B | Lessons Learned: P6™ Resource Updating for the Beginner | Mr Charlie Jackson PSP; Ms Hannah E Schumacher PSP |
| Jerz | CDR-1254 | TUE 8:00-9:00 | Wilson C | EOT Claims: Successful Navigation through a Legal and Technical Minefield | Dr Anamaria I Popescu PE PSP; Mr John C. Jerz |
| Keffer | PS-1373 | MON 3:45-4:45 | Wilson B | Baseline CPM Schedules - Communicating the Plan | Mr David M. Keffer PE PSP; Mr Praduman Maraj PE |
| Kelkar | CSC-1396 | SUN 4:30-5:30 | Wilson A | (Mis) Managing Change | Mr Sanjay Kelkar P.Eng. |
| Kelly | PS-1361 | WED 9:45-10:45 | Wilson B | (Panel Discussion) The Great Debate: Is CPM Past Its Prime? | Mr Patrick M Kelly PE PSP; Mr Mark F Nagata PSP; Mr Mark C Sanders PE CFCC; Ms Carmelita Thorndike PSP |
| Kelly | COM-1443 | MON 5:00-6:00 | Wilson C | Claims and Dispute Resolution Subcommittee Meeting (1 of 2) | Mr Patrick M Kelly PE PSP |
| Kelly | COM-1444 | TUE 5:00-6:00 | Wilson C | Claims and Dispute Resolution Subcommittee Meeting (2 of 2) | Mr Patrick M Kelly PE PSP |
| Kelly | CDR-1273 | MON 3:45-4:45 | Wilson C | Forensic Schedule Analysis on Risk Adjusted Schedules | Mr John C Livengood CFCC PSP; Mr Patrick M Kelly PE PSP |
| Kelly | CDR-1402 | WED 8:00-9:00 | Wilson C | Mis-Using the Measured Mile Concept to Make a Claim | Mr Robert D. Kelly Jr CFCC PSP |
| Khamooshi | IND-1453 | MON 3:45-4:45 | Taylor | Industry Focus: U.S Federal Government - (Presentation) Risk & Opportunity Management in the Federal Government and Academia | Dr Homayoun Khamooshi; Mr John D. Driessnack |
| Kranz | IND-1450 | MON 10:00-11:00 | Taylor | Industry Focus: U.S Federal Government - (Panel Discussion) Project Control & Governance within the Federal Government (1 of 2) | Mr Gordon M. Kranz; Ms Karen Richey; Ms Kimberly Meyer; Ms Maureen Wakeland |
| Ladipo | EVM-1262 | TUE 11:00-12:00 | Harding | Earned Value Analysis and CPM Schedule Review in Construction | Ms Omoniyi O. Ladipo CCE EVP; Mr Charles E Bolyard Jr CFCC PSP; Ms Mairav R. Mintz PE |
| Lamba | RISK-1363 |
TUE 8:00-9:00 | Hoover | Performance Audits of Construction Projects | Ms Maria Petrov PE CFCC; Mr Gaurav Lamba PE CCE |
| Lametrie | RISK-1329 | TUE 3:45-4:45 | Hoover | An Approach to Implementing Risk Management on Environmental Remediation Projects | Ms Christine W. Lametrie |
| Lee | CDR-1230 | WED 9:45-10:45 | Wilson C | A Comparison of EVM to Measured Mile in Calculating Inefficiency | Dr Jae-Seob Lee |
| Lee | IND-1451 | MON 11:15-12:15 | Taylor | Industry Focus: U.S Federal Government - (Panel Discussion) Project Control & Governance within the Federal Government (2 of 2) | Mr Michael A Peek PE CCE; Mr Jason T. Lee; Mr David Nelson |
| Lefman | RISK-1284 | TUE 9:45-10:45 | Hoover | Tailored Project Risk Management Assessment Tool | Mr Bryan A Skokan PE; Mr Dan Melamed CCC EVP; Mr Rodney Lehman; Mr Jake Lefman |
| Lehman | RISK-1284 | TUE 9:45-10:45 | Hoover | Tailored Project Risk Management Assessment Tool | Mr Bryan A Skokan PE; Mr Dan Melamed CCC EVP; Mr Rodney Lehman; Mr Jake Lefman |
| Leo | COM-1445 | SUN 1:30-2:30 | Coolidge | Cost Estimating Subcommitte Meeting - Recommeded Practice Development Session (1 of 3) | Mr Douglas W Leo CCC CEP |
| Leo | COM-1446 | SUN 2:45-3:45 | Coolidge | Cost Estimating Subcommitte Meeting - Recommeded Practice Development Session (2 of 3) | Mr Douglas W Leo CCC CEP |
| Leo | COM-1447 | SUN 4:30-5:30 | Coolidge | Cost Estimating Subcommitte Meeting - Recommeded Practice Development Session (3 of 3) | Mr Douglas W Leo CCC CEP |
| Leo | COM-1476 | TUE 5:00-6:00 | Coolidge | Cost Estimating Subcommittee Meeting | Mr Douglas W Leo CCC CEP |
| Lindsay | EVM-1354 | TUE 2:00-3:00 | Harding | Lessons Learned in Earned Value Management System Certification | Mr Scott E. Lindsay PSP; Ms Michelle A M Lindsay PSP; Mr Jeffrey M G Morton |
| Lindsay | EVM-1354 | TUE 2:00-3:00 | Harding | Lessons Learned in Earned Value Management System Certification | Mr Scott E. Lindsay PSP; Ms Michelle A M Lindsay PSP; Mr Jeffrey M G Morton |
| Livengood | CDR-1273 | MON 3:45-4:45 | Wilson C | Forensic Schedule Analysis on Risk Adjusted Schedules | Mr John C Livengood CFCC PSP; Mr Patrick M Kelly PE PSP |
| Loop | EVM-1232 | WED 8:00-9:00 | Harding | EVM Light or Effective EVM Implementation? | Mr Robert Loop EVP PSP |
| Loop | EVM-1227 | SUN 2:45-3:45 | Harding | Schedule Metrics Reliability and Predictability | Mr Robert Loop EVP PSP |
| Lopez del Puerto | PM-1229 | TUE 9:45-10:45 | Wilson A | Using Complexity Footprints to Manage Complexity in Construction Projects | Mr Isaac Annis; Dr Kelly Strong; Dr Carla Lopez del Puerto CCC; Dr Rebecca Atadero |
| Lu | CSC-1285 | MON 3:45-4:45 | Wilson A | Modularization Program Execution Optimization on Mega Oil Sands Projects | Mr Yuhong Wu CCE; Dr Ming Lu |
| Lukas | PM-1319 | MON 10:00-11:00 | Harding | How to Maximize the Value of Virtual Teams | Mr Joseph A. Lukas PE CCE |
| Lukas | DEV-1318 | MON 3:45-4:45 | Harding | Pardon Me – Your Personality Is Showing! | Mr Joseph A. Lukas PE CCE |
| MacElheron | BIM-1415 | MON 3:45-4:45 | McKinley | BIM Based Cost Management for Large Scale Construction Projects | Mr Sandy MacElheron; Dr Gang Hong P.Eng.; Mr Ben Swan |
| Maraj | PS-1373 | MON 3:45-4:45 | Wilson B | Baseline CPM Schedules - Communicating the Plan | Mr David M. Keffer PE PSP; Mr Praduman Maraj PE |
| Martin | CDR-1356 | TUE 2:00-3:00 | Wilson C | Windows Analysis versus Half-Step Analysis Progress Impact Quantification | Ms Greta A Martin PE PSP |
| Mattos | CSC-1268 |
MON 5:00-6:00 | Wilson A | S-Curve: A Relevant Planning Tool | Mr Aldo D. Mattos |
| McCuen | COM-1440 | MON 5:00-6:00 | McKinley | BIM Subcommittee Meeting - (Presentation) National BIM Standard Session | Ms Dana Kennish (Deke) Smith; Ms Tamera L. McCuen |
| McCuen | BIM-1348 | MON 2:00-3:00 | McKinley | Validating a Quantity Takeoff Generated by a Building Information Model | Ms Tamera L. McCuen |
| McDowell | RISK-1330 | TUE 2:00-3:00 | Hoover | Use of Dynamic Progress Method (DPM) on Guaranteed Maximum Price (GMP) Contracts | Mr Mark P. McDowell CCC PSP; Mr Barry B. Bramble; Mr J. Chris White |
| McNamara | CSC-1218 | SUN 1:30-2:30 | Wilson A | Contingency Use in Forecasting | Mr David W McNamara |
| Melamed | RISK-1284 | TUE 9:45-10:45 | Hoover | Tailored Project Risk Management Assessment Tool | Mr Bryan A Skokan PE; Mr Dan Melamed CCC EVP; Mr Rodney Lehman; Mr Jake Lefman |
| Mendez | OWN-1200 | TUE 8:00-9:00 | Wilson B | Critical Factors to the Success of Alliances in Australia | Dr Anthony J Mills; Mr Mario Mendez; Dr Alexia A Nalewaik CCE |
| Meyer | IND-1450 | MON 10:00-11:00 | Taylor | Industry Focus: U.S Federal Government - (Panel Discussion) Project Control & Governance within the Federal Government (1 of 2) | Mr Gordon M. Kranz; Ms Karen Richey; Ms Kimberly Meyer; Ms Maureen Wakeland |
| Meyer | SK-1474 | TUE 2:00-6:00 | Taylor | Skills and Knowledge of Cost Engineering: Earned Value Management | Ms Kimberly Anne Hunter EVP; Ms Kimberly Meyer |
| Mills | OWN-1200 | TUE 8:00-9:00 | Wilson B | Critical Factors to the Success of Alliances in Australia | Dr Anthony J Mills; Mr Mario Mendez; Dr Alexia A Nalewaik CCE |
| Mintz | EVM-1262 | TUE 11:00-12:00 | Harding | Earned Value Analysis and CPM Schedule Review in Construction | Ms Omoniyi O. Ladipo CCE EVP; Mr Charles E Bolyard Jr CFCC PSP; Ms Mairav R. Mintz PE |
| Morton | EVM-1354 | TUE 2:00-3:00 | Harding | Lessons Learned in Earned Value Management System Certification | Mr Scott E. Lindsay PSP; Ms Michelle A M Lindsay PSP; Mr Jeffrey M G Morton |
| Nada | RISK-1237 | MON 2:00-3:00 | Hoover | Capital Investment Decisions: Two Teams with Differing Intentions | Ms Diana Nada; Dr Francis T Hartman P.Eng. |
| Nagata | PS-1361 | WED 9:45-10:45 | Wilson B | (Panel Discussion) The Great Debate: Is CPM Past Its Prime? | Mr Patrick M Kelly PE PSP; Mr Mark F Nagata PSP; Mr Mark C Sanders PE CFCC; Ms Carmelita Thorndike PSP |
| Nagata | CDR-1436 | TUE 3:45-4:45 | Wilson C | Generating Claims through Contract Provisions and Management Practices | Mr Mark F Nagata PSP; Mr Frank DiCianni |
| Nalewaik | OWN-1200 | TUE 8:00-9:00 | Wilson B | Critical Factors to the Success of Alliances in Australia | Dr Anthony J Mills; Mr Mario Mendez; Dr Alexia A Nalewaik CCE |
| Nalewaik | PM-1202 | TUE 3:45-4:45 | Wilson A | Economy, Efficiency, and Effectiveness of Capital Projects | Dr Alexia A Nalewaik CCE |
| Nelson | IND-1451 | MON 11:15-12:15 | Taylor | Industry Focus: U.S Federal Government - (Panel Discussion) Project Control & Governance within the Federal Government (2 of 2) | Mr Michael A Peek PE CCE; Mr Jason T. Lee; Mr David Nelson |
| Neumeier | PS-1263 | SUN 2:45-3:45 | Wilson B | Background, Method and Application of the “T-Week” Scheduling Process | Mr Jared M. Neumeier PSP |
| Ogunsemi | OTH-1355 | WED 9:45-10:45 | Harding | Australian Construction Economy in the face of Global, Euro and Asian Crises | Dr Oluwole Alfred Olatunji; Willy Sher; Dr Deji Rufus Ogunsemi |
| Olatunji | OTH-1355 | WED 9:45-10:45 | Harding | Australian Construction Economy in the face of Global, Euro and Asian Crises | Dr Oluwole Alfred Olatunji; Willy Sher; Dr Deji Rufus Ogunsemi |
| Ottesen | CDR-1382 | TUE 9:45-10:45 | Wilson C | Schedule Activity Density Analysis | Mr Jeffery L. Ottesen PE CFCC PSP; Mr Kenji P Hoshino CFCC PSP |
| Owen | PS-1357 | MON 11:15-12:15 | Wilson B | Schedule Update Analysis: Retained Logic versus Progress Override | Mr Devdas K Tamboli CCE PSP; Ms Julie K Owen CCC PSP; Mr Ahmad Ali Ahmed Alkuwari |
| Parkar | CSC-1206 | MON 2:00-3:00 | Wilson A | Estimating Theme Parks and Attractions | Mr Asif Parkar CCC CEP EVP PSP |
| Peck | CDR-1404 | TUE 11:00-12:00 | Wilson C | Adapting Alternative Dispute Resolution to Meet the Demands of Modern Projects | Mr Christopher M. Anzidei; Mr Christopher J Brasco; Mr Adam M Tuckman; Mr Blake V. Peck PE; Mr Brian M. Perlberg |
| Peek | IND-1451 | MON 11:15-12:15 | Taylor | Industry Focus: U.S Federal Government - (Panel Discussion) Project Control & Governance within the Federal Government (2 of 2) | Mr Michael A Peek PE CCE; Mr Jason T. Lee; Mr David Nelson |
| Perlberg | CDR-1404 | TUE 11:00-12:00 | Wilson C | Adapting Alternative Dispute Resolution to Meet the Demands of Modern Projects | Mr Christopher M. Anzidei; Mr Christopher J Brasco; Mr Adam M Tuckman; Mr Blake V. Peck PE; Mr Brian M. Perlberg |
| Perry | CDR-1213 | SUN 2:45-3:45 | Wilson C | An Introduction to Dispute Boards and All Its Forms | Mr James Charles Perry |
| Petrov | RISK-1363 |
TUE 8:00-9:00 | Hoover | Performance Audits of Construction Projects | Ms Maria Petrov PE CFCC; Mr Gaurav Lamba PE CCE |
| Plotnick | CDR-1278 | WED 11:00:12:00 | Wilson C | Disruption Analysis by CPM Out-of-Sequence Methodology | Dr Fredric L. Plotnick PE |
| Plumery | EVM-1269 | SUN 4:30-5:30 | Harding | Best Value Performance Measurement | Mr Richard C Plumery EVP |
| Popescu | CDR-1254 | TUE 8:00-9:00 | Wilson C | EOT Claims: Successful Navigation through a Legal and Technical Minefield | Dr Anamaria I Popescu PE PSP; Mr John C. Jerz |
| Poskie | RISK-1419 | WED 9:45-10:45 | Hoover | Managing Risk and Contingency from the Earliest Stages of Capital Planning | Mr Joseph M. Poskie |
| Regan | SK-1475 | WED 8:00-12:00 | Taylor | Skills and Knowledge of Cost Engineering: Change Management for EPC Contracting | Dr Sean Thomas Regan CCE CEP |
| Richey | IND-1450 | MON 10:00-11:00 | Taylor | Industry Focus: U.S Federal Government - (Panel Discussion) Project Control & Governance within the Federal Government (1 of 2) | Mr Gordon M. Kranz; Ms Karen Richey; Ms Kimberly Meyer; Ms Maureen Wakeland |
| Rodrigues | EST-1310 | WED 9:45-10:45 | Coolidge | Estimating Escalation Costs for Thermal Power Plants | Mr Bruno N. Rodrigues; Ms Clemence R. Dawed; Mr Antoine de Chillaz; Mr Bastien Durand; Mr Sebastien Binet |
| Sanders | PS-1361 | WED 9:45-10:45 | Wilson B | (Panel Discussion) The Great Debate: Is CPM Past Its Prime? | Mr Patrick M Kelly PE PSP; Mr Mark F Nagata PSP; Mr Mark C Sanders PE CFCC; Ms Carmelita Thorndike PSP |
| Sanders | OWN-1426 | WED 8:00-9:00 | Wilson A | What the Fossil Plant Owner Wants from the EPC | Mr Mark C Sanders PE CFCC |
| Sanford | IT-1274 | MON 10:00-11:00 | McKinley | Building a Cross-Cutting Historical Cost Database for Mega-Projects | Mr William G Hombach CCC; Mr Peter C. Sanford |
| Schumacher | PS-1264 | SUN 1:30-2:30 | Wilson B | Creating Half-Step Schedules using P6’s Update Baseline Utility | Ms Hannah E Schumacher PSP; Mr Ronald M Winter PSP |
| Schumacher | PS-1290 | MON 10:00-11:00 | Wilson B | Lessons Learned: P6™ Resource Updating for the Beginner | Mr Charlie Jackson PSP; Ms Hannah E Schumacher PSP |
| Scott | IND-1452 | MON 2:00-3:00 | Taylor | Industry Focus: U.S Federal Government - (Presentation) Agile Planning and Performance Metrics for Government Projects: USCIS's Agile Approach to Developing New Software Releases | Mr Henry Van Demark; Mr David Scott |
| Shash | PM-1272 | WED 11:00:12:00 | Wilson A | The Status of the Relationship Between General Contractors and Subcontractors | Dr Ali A. Shash |
| Shaw | EST-1247 | MON 11:15-12:15 | Coolidge | The Cost Impact of LEED-NC v3.0 Minimum Energy Performance Prerequisite 2 on Warehouse Design | Ms Leigh Shaw; Dr Khalid Siddiqi |
| Sher | OTH-1355 | WED 9:45-10:45 | Harding | Australian Construction Economy in the face of Global, Euro and Asian Crises | Dr Oluwole Alfred Olatunji; Willy Sher; Dr Deji Rufus Ogunsemi |
| Siddiqi | EST-1247 | MON 11:15-12:15 | Coolidge | The Cost Impact of LEED-NC v3.0 Minimum Energy Performance Prerequisite 2 on Warehouse Design | Ms Leigh Shaw; Dr Khalid Siddiqi |
| Singh | SK-1472 | TUE 8:00-9:00 | Taylor | Skills and Knowldege of Cost Engineering: Estimating | Mr Rohit Singh P Eng CCE |
| Skokan | RISK-1284 | TUE 9:45-10:45 | Hoover | Tailored Project Risk Management Assessment Tool | Mr Bryan A Skokan PE; Mr Dan Melamed CCC EVP; Mr Rodney Lehman; Mr Jake Lefman |
| Smith | COM-1440 | MON 5:00-6:00 | McKinley | BIM Subcommittee Meeting - (Presentation) National BIM Standard Session | Ms Dana Kennish (Deke) Smith; Ms Tamera L. McCuen |
| Steele | RISK-1333 | SUN 4:30-5:30 | Hoover | An Earned Value Analysis Framework for Evaluating Project Portfolios | Mr Mark D Steele PE CCE |
| Strong | PM-1229 | TUE 9:45-10:45 | Wilson A | Using Complexity Footprints to Manage Complexity in Construction Projects | Mr Isaac Annis; Dr Kelly Strong; Dr Carla Lopez del Puerto CCC; Dr Rebecca Atadero |
| Swan | BIM-1415 | MON 3:45-4:45 | McKinley | BIM Based Cost Management for Large Scale Construction Projects | Mr Sandy MacElheron; Dr Gang Hong P.Eng.; Mr Ben Swan |
| Tamboli | PS-1357 | MON 11:15-12:15 | Wilson B | Schedule Update Analysis: Retained Logic versus Progress Override | Mr Devdas K Tamboli CCE PSP; Ms Julie K Owen CCC PSP; Mr Ahmad Ali Ahmed Alkuwari |
| Thomas | RISK-1308 | TUE 11:00-12:00 | Hoover | Managing Operator Risk Profile for Upstream Projects | Ms Tina Sara Thomas |
| Thorndike | PS-1361 | WED 9:45-10:45 | Wilson B | (Panel Discussion) The Great Debate: Is CPM Past Its Prime? | Mr Patrick M Kelly PE PSP; Mr Mark F Nagata PSP; Mr Mark C Sanders PE CFCC; Ms Carmelita Thorndike PSP |
| Thrower | PS-1379 | MON 5:00-6:00 | Wilson B | How to Improve Schedule Implementation and Practices | Mr W Roy Godbee Jr; Mr Kenneth Thrower |
| Tsuu | RISK-1427 | WED 8:00-9:00 | Hoover | Schedule Risk Analysis Essentials for Project Success | Mr Calvenn Tsuu CCE |
| Tuckman | CDR-1404 | TUE 11:00-12:00 | Wilson C | Adapting Alternative Dispute Resolution to Meet the Demands of Modern Projects | Mr Christopher M. Anzidei; Mr Christopher J Brasco; Mr Adam M Tuckman; Mr Blake V. Peck PE; Mr Brian M. Perlberg |
| Uppal | RISK-1407 | SUN 2:45-3:45 | Hoover | Synergies between Risk Management and Project Management | Mr Kul B Uppal PE CEP |
| Van Demark | IND-1452 | MON 2:00-3:00 | Taylor | Industry Focus: U.S Federal Government - (Presentation) Agile Planning and Performance Metrics for Government Projects: USCIS's Agile Approach to Developing New Software Releases | Mr Henry Van Demark; Mr David Scott |
| von Leffern | CSC-1430 | SUN 2:45-3:45 | Wilson A | Developing a Project Control System for a Transmission Grid | Mr Vidya C Dixit CCE PSP; Mr Mark von Leffern EVP PSP |
| Wakeland | IND-1450 | MON 10:00-11:00 | Taylor | Industry Focus: U.S Federal Government - (Panel Discussion) Project Control & Governance within the Federal Government (1 of 2) | Mr Gordon M. Kranz; Ms Karen Richey; Ms Kimberly Meyer; Ms Maureen Wakeland |
| Wallwork | CSC-1352 | MON 10:00-11:00 | Wilson A | Controlling Cost through the Estimating and Risk Assessment Process | Mr Joseph W Wallwork PE CCE CFCC PSP |
| Warhoe | PM-1432 | MON 2:00-3:00 | Harding | Modelling Productivity Loss Using System Dynamics to Understand Cumulative Impact | Dr Stephen P Warhoe PE CCE CFCC |
| Watenpaugh | EVM-1388 | TUE 8:00-9:00 | Harding | Workshop: Variance Analysis Report (VAR) - Analysis and Preparation | Ms Robin A. Watenpaugh EVP |
| White | RISK-1330 | TUE 2:00-3:00 | Hoover | Use of Dynamic Progress Method (DPM) on Guaranteed Maximum Price (GMP) Contracts | Mr Mark P. McDowell CCC PSP; Mr Barry B. Bramble; Mr J. Chris White |
| Whiteside | PM-1216 | TUE 11:00-12:00 | Wilson A | Practical Corporate Investment Decision-Making Guide | Mr James D Whiteside II PE |
| Whiteside | CSC-1327 | MON 11:15-12:15 | Wilson A | The Cost of Change | Mr Gregory J. Whiteside CCT |
| Winter | PS-1264 | SUN 1:30-2:30 | Wilson B | Creating Half-Step Schedules using P6’s Update Baseline Utility | Ms Hannah E Schumacher PSP; Mr Ronald M Winter PSP |
| Winter | COM-1442 | WED 11:00:12:00 | Wilson B | Planning and Scheduling Subcommittee Meeting | Mr Ronald M Winter PSP |
| Winter | PS-1197 | WED 8:00-9:00 | Wilson B | The Half-Step Schedule is Just the Start: Introducing the Zero-Step Schedule | Mr Ronald M Winter PSP |
| Wolf | RISK-1408 | MON 3:45-4:45 | Hoover | Project Development and Strategies for Success | Mr Lawrence A Bastianelli CCE; Mr Terry Yeager; Mr Bradley D. Wolf PE; Mr Richard D. Fultineer |
| Wu | CSC-1285 | MON 3:45-4:45 | Wilson A | Modularization Program Execution Optimization on Mega Oil Sands Projects | Mr Yuhong Wu CCE; Dr Ming Lu |
| Yeager | RISK-1408 | MON 3:45-4:45 | Hoover | Project Development and Strategies for Success | Mr Lawrence A Bastianelli CCE; Mr Terry Yeager; Mr Bradley D. Wolf PE; Mr Richard D. Fultineer |
| Yglesias | OTH-1439 | MON 2:00-3:00 | Coolidge | (Presentation) Envisioning a Nation's Capital: L’Enfant’s Urban Design for Washington, DC | Dr Caren Yglesias |
| Zack | EST-1239 | TUE 8:00-9:00 | Coolidge | The Impact of Rework on Construction and Some Practical Remedies | Mr Jason M. Dougherty; Mr Nigel Hughes; Mr James G Zack Jr CFCC |
| Zack | CDR-1240 | MON 10:00-11:00 | Wilson C | Trends in International Construction Arbitration | Mr Peter V. Badala; Mr James G Zack Jr CFCC |
| Zhao | CDR-1246 | MON 11:15-12:15 | Wilson C | Avoiding the Pitfalls in Implementing the Measured Mile Method | Dr Tong Zhao PE PSP; Mr J. Mark Dungan |