Authors/Presenters

There are over 100 hours of presentations to choose from over a four day period, organized in a variety of tracks (SUBJECT TO CHANGE)

Last NameTrackTimeLocationTitleAll Authors/Presenters
(Primary author is listed first)
Abdel-MageedOWN-810WED 8:00-9:00Salon DField Projects Controls Roles in Managing Different Contracts (Owner’s Approach)Mr Mohamed Hosny Abdel-Mageed CCE
AkhibiTCM-906SUN 2:45-3:45 Conference Room 11Strategic Options for Corporate SurvivalMr Gregory Osagie Akhibi CCC
AlborzfardOWN-1012MON 11:15-12:15Salon DA Framework for Life Cycle Cost Analysis of Sustainability Features in BuildingsMs Nakisa Alborzfard
Al-HusseinCSC-913WED 9:45-10:45Salon KThe Impact of Lost Time on the Project Estimate: A Lean Manufacturing Approach Ms Nataliya Sadovska; Dr Mohamed Al-Hussein P Eng
AlkassCDR-850WED 9:45-10:45Salon CA Model for Construction Delays Claims AssessmentMr Sasan Golnaraghi; Dr Sabah Alkass P Eng
ArrowRISK-845TUE 9:45-10:45Salon ARisk Intelligence and Measuring Excellence in Project Risk ManagementMr James E Arrow FRICS
ArroyoEVM-1049SUN 4:30-5:30 Conference Room 11A Pragmatic Earned Value Model to Effectively Plan and Control Construction ProjectsMr Luis Miguel Arroyo
ArroyoRISK-1054WED 8:00-9:00Salon AAn Integrated, Pragmatic Approach to Effectively Manage Project RiskMr Luis Miguel Arroyo
BadalaEST-1104SUN 2:45-3:45 Salon APricing Contractor Delay CostsMr James G Zack Jr CFCC; Mr Peter V. Badala
BarnhartPS-858MON 2:00-3:00Salon BAerospace versus Construction Scheduling: Different Yet Similar Approaches and GoalsMr Thomas W Barnhart PSP; Ms Carmelita Thorndike PSP; Ms Julie K Owen CCC PSP
BarshopRISK-1100MON 10:00-11:00Salon AQuantifying Estimate Accuracy and Precision for the Process Industries: A Review of Industry DataMr Alex Ogilvie; Mr Robert A Brown Jr; Mr. Frederick P. Biery; Mr. Paul H. Barshop
BassfordCSC-929MON 2:00-3:00Salon KConstruction Schedules for Better Cash Flow ManagementMr Pete A Bassford PSP; Mr Brian C Smith CCC
BennettDEV-1122WED 11:00-12:00Salon JQualifications and Barriers to Professional Recognition in Cost EngineeringMr Nic Bennett; Ms Alexia A Nalewaik FRICS CCE
BergerudIT-922MON 10:00-11:00Salon LL.A.’s $40B Transportation Program: Success of a Program Management Information SystemMr Christen Bergerud; Ms Julie K Owen CCC PSP; Mr Brian Criss PSP
BieryRISK-1100MON 10:00-11:00Salon AQuantifying Estimate Accuracy and Precision for the Process Industries: A Review of Industry DataMr Alex Ogilvie; Mr Robert A Brown Jr; Mr. Frederick P. Biery; Mr. Paul H. Barshop
BlodgettOWN-1055TUE 5:00-6:00Salon DImplementing Primavera P6 Release 8.1: Leading Change in a Large Owner OrganizationMr John Wallace Blodgett; Mr Brian Criss PSP
BorowiczCOM-1119MON 5:00-6:00Salon LUtilities and Energy SIG MeetingMr Jeffery J Borowicz CCC CEP PSP
BoukendourPM-1002SUN 4:30-5:30 Conference Room 12A New Risk Sharing Formula for Target Cost ContractsDr. Said Boukendour
BradfordCDR-876TUE 9:45-10:45Salon CWhen's the Measured Mile, Not the Measured Mile?Mr Mark F Nagata PSP; Ms Elizabeth Bradford
BradyRISK-878TUE 2:00-3:00Salon JWhy Become a Decision and Risk Management Professional?Mr David C Brady P Eng; Mr David A Norfleet CCC CFCC
BrascoCDR-1056MON 2:00-3:00Salon C(Panel Discussion) Smart-Money Guide to the RP/FSA: The Least Cost Way to Achieve Good-Faith ComplianceMr Kenji P Hoshino CFCC PSP; Mr Christopher W Carson PSP; Mr Jeffrey E Fuchs PE; Mr Christopher J Brasco Esq; Mr Brett Broadhead
BrascoCDR-974SUN 2:45-3:45 Salon BWhen an Owner's Hard-Line Claims Negotiations are Also a Breach of ContractMr Christopher J Brasco Esq; Mr Adam M Tuckman; Mr Thomas F Peters PE CFCC
BredehoeftBIM-1107TUE 8:00-9:00Salon LCost Estimating in Building Information Modeling: Process Development ReportMs Tamera Lee McCuen; Mr Peter R Bredehoeft Jr CEP
BroadheadCDR-1056MON 2:00-3:00Salon C(Panel Discussion) Smart-Money Guide to the RP/FSA: The Least Cost Way to Achieve Good-Faith ComplianceMr Kenji P Hoshino CFCC PSP; Mr Christopher W Carson PSP; Mr Jeffrey E Fuchs PE; Mr Christopher J Brasco Esq; Mr Brett Broadhead
BrownRISK-1100MON 10:00-11:00Salon AQuantifying Estimate Accuracy and Precision for the Process Industries: A Review of Industry DataMr Alex Ogilvie; Mr Robert A Brown Jr; Mr. Frederick P. Biery; Mr. Paul H. Barshop
BuddCSC-1066TUE 11:00-12:00Salon KLeveraging the Power of Schedule MarginMr Charles I Budd EVP; Dr Charlene Spoede Budd
BuddCSC-1066TUE 11:00-12:00Salon KLeveraging the Power of Schedule MarginMr Charles I Budd EVP; Dr Charlene Spoede Budd
CabanoOWN-1042MON 2:00-3:00Salon DOwners: What to Look for in a Contractor's Project Control CapabilityMr. Stephen L. Cabano; Mr Paul G Williams
CaddellPS-1086MON 10:00-11:00Salon BSchedule Compression Warning ToolsMr Peter A. Jackson; Mr Aaron M Vernon; Mr Christopher P Caddell PE CCE
CaddellRISK-910SUN 2:45-3:45 Salon CRP 64R-11 - CPM Schedule Risk Modeling and Analysis: Special ConsiderationsMr Christopher P Caddell PE CCE
CaoOWN-843WED 9:45-10:45Salon DApply Lean Project Controls Management Practice from an Owner’s PerspectiveMr Weirui Cao CCE
CarsonCDR-1056MON 2:00-3:00Salon C(Panel Discussion) Smart-Money Guide to the RP/FSA: The Least Cost Way to Achieve Good-Faith ComplianceMr Kenji P Hoshino CFCC PSP; Mr Christopher W Carson PSP; Mr Jeffrey E Fuchs PE; Mr Christopher J Brasco Esq; Mr Brett Broadhead
CarsonEST-1013SUN 1:30-2:30 Salon AAn Effective and Ethical Approach to the GC Bid ProcessMr Christopher W Carson PSP
CarsonPS-1014TUE 8:00-9:00Salon BDealing with Contractor's Schedules that Cannot be ApprovedMr Christopher W Carson PSP
ChatzisymeonBIM-846TUE 9:45-10:45Salon LApplication of BIM and GIS in Class 1-5 Cost EstimatesMr. Apostolos Chatzisymeon PE; Mr. Nick Papadopoulos; Mr George Chatzisymeon
ChatzisymeonBIM-846TUE 9:45-10:45Salon LApplication of BIM and GIS in Class 1-5 Cost EstimatesMr. Apostolos Chatzisymeon PE; Mr. Nick Papadopoulos; Mr George Chatzisymeon
ChenINT-1024 MON 11:15-12:15Salon LEstablishment of Sino-Foreign Strategic Alliance in the Chinese Construction IndustryMr Bill Chen; Yuhong Wang; Dr. Jiachuan Li
ColangeloEST-1057TUE 5:00-6:00Salon JPresenting an Estimate to Your clientMr David Colangelo CCC
CollinsCDR-815MON 10:00-11:00Salon CForensic Schedule Analysis - Chapter 2: Delay Analysis on Non-CPM Scheduled ProjectsMr James G Zack Jr CFCC; Mr. Steven A. Collins
CrabtreeADV-882MON 3:45-4:45Salon JAcceptance of a Formalized Cost Engineering ImplementationMr Wayne A Crabtree; Mr James Wolf; Mr Timothy John Havranek
CrabtreeRISK-925TUE 2:00-3:00Salon AScope Analytics: A Quantitative Approach to Scope Management for Environmental Remediation ProjectsMr James Wolf; Mr Wayne A Crabtree; Mr Timothy John Havranek
CrissIT-922MON 10:00-11:00Salon LL.A.’s $40B Transportation Program: Success of a Program Management Information SystemMr Christen Bergerud; Ms Julie K Owen CCC PSP; Mr Brian Criss PSP
CrissOWN-1055TUE 5:00-6:00Salon DImplementing Primavera P6 Release 8.1: Leading Change in a Large Owner OrganizationMr John Wallace Blodgett; Mr Brian Criss PSP
CurranCOM-1103TUE 5:00-6:00Salon ADecision and Risk Management Subcommittee MeetingMr Michael W Curran
DaneshyarPS-827MON 3:45-4:45Salon BSchedule Levels - Structure, Example and Method of Preparation in PrimaveraMr Syd Daneshyar
DekkerCSC-816TUE 2:00-3:00Salon KAccepted Standards and Emerging Trends in Over Target Baseline (OTB) ContractsMr Simon Dekker
Dell'IsolaEST-912MON 2:00-3:00Salon JPricing Projects in a Continuing Hyper Competitive MarketMr Michael D Dell'Isola PE FRICS
DieterleCDR-1003TUE 2:00-3:00Salon CProving the Hidden Costs of AccelerationMr Robert A Dieterle CCE; Mr Thomas A Gaines CCC
DouglasDEV-951WED 8:00-9:00Salon JTake a Memo - Communicate EffectivelyMr Edward E Douglas III CCC PSP
DouglasPS-953TUE 9:45-10:45Salon BUsing the AACE International Recommended Practice on Project PlanningMr Edward E Douglas III CCC PSP
DunganCDR-980WED 11:00-12:00Salon CProving Engineering Productivity LossDr. Tong Zhao PE PSP; Mr John Mark Dungan
ElliottPM-869SUN 2:45-3:45 Conference Room 12Cost-Benefit Analysis of Construction Safety Incentive ProgramsDr Carla Lopez del Puerto CCC; Mr Jon Elliott
EvrenosogluPS-947MON 11:15-12:15Salon BSchedule Change Management - Every Project Needs ItMr Faik Burak Evrenosoglu PE CCE PSP
FeinblumRISK-849MON 2:00-3:00Salon AUsing Probabilistic Risk Based Scheduling to Balance the Project TriangleMr Daniel Feinblum
FigueroaRISK-880TUE 3:45-4:45Salon AKey Elements for a Practical Schedule Risk AnalysisMr. Luis Oscar Figueroa
FordDEV-1072TUE 9:45-10:45Salon JAn Industry/Academia Partnership for Construction Project Control EducationDr David N Ford; Mr Michael R Nosbisch CCC PSP
FoxPS-950TUE 2:00-3:00Salon BSchedule Target Setting to Improve Project Execution CompetitivenessMr Andres Blake Thein Fox P Eng
FrahmEVM-1059MON 10:00-11:00Salon KDesigning a Tailored Earned Value Management System (EVMS)Ms Vicki L. Frahm EVP
FratangeloRISK-965MON 5:00-6:00Salon AEvaluating the Costs of Putting a Construction Project on Hold to Resolve IssuesMr Jake Ortego PE CCE; Mr Antonio Fratangelo CCC
FuchsCDR-1056MON 2:00-3:00Salon C(Panel Discussion) Smart-Money Guide to the RP/FSA: The Least Cost Way to Achieve Good-Faith ComplianceMr Kenji P Hoshino CFCC PSP; Mr Christopher W Carson PSP; Mr Jeffrey E Fuchs PE; Mr Christopher J Brasco Esq; Mr Brett Broadhead
GainesCDR-1003TUE 2:00-3:00Salon CProving the Hidden Costs of AccelerationMr Robert A Dieterle CCE; Mr Thomas A Gaines CCC
GermainBIM-995TUE 11:00-12:00Salon L4D Scheduling Using Delmia® and Microsoft Project® on Hydroelectric Construction ProjectsMr Michel Guevremont PE PSP; Ms Chantale Germain
GiammalvoDEV-886WED 9:45-10:45Salon JCreating a Competency Assessment for Cost EstimatorsDr Paul D Giammalvo CCE
GolnaraghiCDR-850WED 9:45-10:45Salon CA Model for Construction Delays Claims AssessmentMr Sasan Golnaraghi; Dr Sabah Alkass P Eng
GransbergEST-821MON 10:00-11:00Salon JEstimating the Green Premium: An Oklahoma City Case StudyMs. Rachel Mosier; Dr Douglas D Gransberg PE FRICS CCE
GreenPS-818SUN 2:45-3:45 Conference Room 3&4Improved Graphics for MS Project and Primavera SchedulesMr Greg Green PSP
GuevremontBIM-995TUE 11:00-12:00Salon L4D Scheduling Using Delmia® and Microsoft Project® on Hydroelectric Construction ProjectsMr Michel Guevremont PE PSP; Ms Chantale Germain
HamiltonDEV-1034TUE 3:45-4:45Salon JRisk Management - Skills & Knowledge v6Mr Allen C Hamilton CCE
HansenRISK-1053SUN 4:30-5:30 Salon CGoal Orientated Risk Management Practices for Construction ProjectsMs Jean G Hansen CFCC PSP
HarmonCDR-1047SUN 1:30-2:30 Salon BHow to Win at MediationDr Kathleen M J Harmon; Mr. Steven J. Weber
HarmonCDR-1048MON 3:45-4:45Salon CUse of Project Controls on Mega-Projects to Minimize DisputesDr Kathleen M J Harmon; Mr Bruce M Stephan PE
HartCDR-963SUN 1:30-2:30 Conference Room 11Case Study of a CM’s QA/QC Performance Using the TCM FrameworkMr William M Hart PE CFCC PSP
HavranekADV-882MON 3:45-4:45Salon JAcceptance of a Formalized Cost Engineering ImplementationMr Wayne A Crabtree; Mr James Wolf; Mr Timothy John Havranek
HavranekRISK-925TUE 2:00-3:00Salon AScope Analytics: A Quantitative Approach to Scope Management for Environmental Remediation ProjectsMr James Wolf; Mr Wayne A Crabtree; Mr Timothy John Havranek
HeymansRISK-823WED 11:00-12:00Salon AQuantifying Risks Related to the Execution of Mega ProjectsMr Rashad Zahi Zein CCE PSP; Mr. Luc Heymans
HollmannRISK-1027MON 11:15-12:15Salon AEstimate Accuracy: Dealing with RealityMr John K Hollmann PE CCE CEP
HorsakEST-809TUE 8:00-9:00Salon JUsing Monte Carlo Analysis to Estimate Remediation Costs for Contaminated Oilfield SitesMr Randy D Horsak
HoshinoCDR-1056MON 2:00-3:00Salon C(Panel Discussion) Smart-Money Guide to the RP/FSA: The Least Cost Way to Achieve Good-Faith ComplianceMr Kenji P Hoshino CFCC PSP; Mr Christopher W Carson PSP; Mr Jeffrey E Fuchs PE; Mr Christopher J Brasco Esq; Mr Brett Broadhead
HulettRISK-1043TUE 8:00-9:00Salon AIntegrated Cost-Schedule Risk AnalysisDr David T. Hulett; Mr Michael R Nosbisch CCC PSP
JacksonPS-1086MON 10:00-11:00Salon BSchedule Compression Warning ToolsMr Peter A. Jackson; Mr Aaron M Vernon; Mr Christopher P Caddell PE CCE
JacksonPS-962TUE 3:45-4:45Salon BLessons Learned - P6™ - Resource Planning for the BeginnerMr Charlie Jackson PSP; Ms Hannah E Schumacher PSP
JamiesonCSC-847 MON 5:00-6:00Salon KRecommended Approach to Offshore Cost and Schedule BenchmarkingMs. Aileen Anne Jamieson
KeaneBIM-837TUE 3:45-4:45Salon LBuilding Information Modeling - The Cost Estimator's RoleMr Edward Keane CCC
KellyCDR-923WED 8:00-9:00Salon CRecommended Contractual Methods for Resolving Delay Events Prospectively or RetrospectivelyMr Patrick M Kelly PSP
KellyCDR-966SUN 4:30-5:30 Salon BCreating Mid-Period Schedules in Window Analysis Using Primavera Version 6Mr Patrick M Kelly PSP
KellyPS-1015WED 9:45-10:45Salon B(Panel Discussion) Great Debate 2012: Implementation Considerations between Enterprise Scheduling or Stand-Alone SchedulingMr Mark C Sanders PE CCE PSP; Ms Carmelita Thorndike PSP; Mr Mark F Nagata PSP; Mr Patrick M Kelly PSP
KellyPS-841TUE 11:00-12:00Salon BThe Law of SchedulesMr John C Livengood CFCC PSP; Mr Patrick M Kelly PSP
KhadkaCDR-978 TUE 8:00-9:00Salon CEvaluating Cost Escalation Using Cost-loaded Schedules Mr. Sagar B. Khadka CCE PSP; Mr Christopher J Payne PE CFCC PSP
KohliOWN-927 MON 10:00-11:00Salon DPractical Implementation of a Project Delivery ModelVikesh Kohli; Mr H Lance Stephenson CCC
KrausCDR-867SUN 4:30-5:30 Salon AEstimating Escalation Experienced During Project Delay - A Case StudyMr William E Kraus PE FRICS CCE
KrausPM-838TUE 11:00-12:00Salon DCognitive Biases - Improving Project Team's WorkMr William E Kraus PE FRICS CCE
LeePS-1098MON 5:00-6:00Salon BReducing Risk of a Recovery Schedule through Resource LoadingMr Gregory B Lee CCC PSP
LeoCOM-1102MON 5:00-6:00Salon JCost Estimating Subcommittee MeetingMr Douglas W Leo FRICS CCC CEP
LeoOWN-921MON 3:45-4:45Salon DReview of a Third Party Capital Estimate from the Owner's PerspectiveMr David B Roggenkamp CCE; Mr Douglas W Leo FRICS CCC CEP
LewisPS-1020SUN 1:30-2:30 Conference Room 3&4A Case Study: Enterprise Schedule DevelopmentDr Gary Rock Spencer PE CCE PSP; Ms Rose Mary Lewis PE
LiINT-1024 MON 11:15-12:15Salon LEstablishment of Sino-Foreign Strategic Alliance in the Chinese Construction IndustryMr Bill Chen; Yuhong Wang; Dr. Jiachuan Li
LivengoodCDR-842TUE 3:45-4:45Salon CMulti-Primes and Multiple Critical PathsMr John C Livengood CFCC PSP
LivengoodPS-841TUE 11:00-12:00Salon BThe Law of SchedulesMr John C Livengood CFCC PSP; Mr Patrick M Kelly PSP
Lloyd-WalkerOWN-939MON 5:00-6:00Salon DDeveloping Infrastructure Projects Using AlliancesDr Anthony J Mills; Dr. Derek Walker; Beverly Lloyd-Walker
LongfellowRISK-808MON 3:45-4:45Salon APortfolio Management in Commercially Oriented Businesses: Project Selection, Prioritization and MeasurementMr Michael Shawn Longfellow
Lopez del PuertoCSC-889TUE 8:00-9:00Salon KDesigning to Budget: New Mississippi River Bridge Case StudyDr. Kelly Strong; Dr Carla Lopez del Puerto CCC; Dr Jennifer S. Shane; Ms Megan Miller
Lopez del PuertoPM-869SUN 2:45-3:45 Conference Room 2Cost-Benefit Analysis of Construction Safety Incentive ProgramsDr Carla Lopez del Puerto CCC; Mr Jon Elliott
LukasRISK-944TUE 11:00-12:00Salon ACommon Errors in Dealing with Project RisksMr Joseph Arthur Lukas PE CCE
MarajCOM-1106TUE 5:00-6:00Salon CClaims and Dispute Resolution Subcommittee MeetingMr Praduman Maraj PSP
McCuenBIM-1107TUE 8:00-9:00Salon LCost Estimating in Building Information Modeling: Process Development ReportMs Tamera Lee McCuen; Mr Peter R Bredehoeft Jr CEP
McCuenCOM-1120TUE 5:00-6:00Salon LBIM Subcommittee MeetingMs Tamera Lee McCuen
MillerCSC-889TUE 8:00-9:00Salon KDesigning to Budget: New Mississippi River Bridge Case StudyDr. Kelly Strong; Dr Carla Lopez del Puerto CCC; Dr Jennifer S. Shane; Ms Megan Miller
MillsOWN-939MON 5:00-6:00Salon DDeveloping Infrastructure Projects Using AlliancesDr Anthony J Mills; Dr. Derek Walker; Beverly Lloyd-Walker
MontaserBIM-918TUE 2:00-3:00Salon LRFID and BIM for Automated Progress ReportingMr Ali Montaser; Dr Osama El Sayed Moselhi P Eng
MoselhiBIM-918TUE 2:00-3:00Salon LRFID and BIM for Automated Progress ReportingMr Ali Montaser; Dr Osama El Sayed Moselhi P Eng
MosierEST-821MON 10:00-11:00Salon JEstimating the Green Premium: An Oklahoma City Case StudyMs. Rachel Mosier; Dr Douglas D Gransberg PE FRICS CCE
NagataCDR-876TUE 9:45-10:45Salon CWhen's the Measured Mile, Not the Measured Mile?Mr Mark F Nagata PSP; Ms Elizabeth Bradford
NagataPS-1015WED 9:45-10:45Salon B(Panel Discussion) Great Debate 2012: Implementation Considerations between Enterprise Scheduling or Stand-Alone SchedulingMr Mark C Sanders PE CCE PSP; Ms Carmelita Thorndike PSP; Mr Mark F Nagata PSP; Mr Patrick M Kelly PSP
NalewaikDEV-1122WED 11:00-12:00Salon JQualifications and Barriers to Professional Recognition in Cost EngineeringMr Nic Bennett; Ms Alexia A Nalewaik FRICS CCE
NalewaikRISK-998SUN 1:30-2:30 Salon CAn Enterprise Architecture Approach to Project OptimizationMs. Claudia Rose; Ms Alexia A Nalewaik FRICS CCE
NorfleetRISK-878TUE 2:00-3:00Salon JWhy Become a Decision and Risk Management Professional?Mr David C Brady P Eng; Mr David A Norfleet CCC CFCC
NosbischDEV-1072TUE 9:45-10:45Salon JAn Industry/Academia Partnership for Construction Project Control EducationDr David N Ford; Mr Michael R Nosbisch CCC PSP
NosbischRISK-1043TUE 8:00-9:00Salon AIntegrated Cost-Schedule Risk AnalysisDr David T. Hulett; Mr Michael R Nosbisch CCC PSP
OgilvieRISK-1100MON 10:00-11:00Salon AQuantifying Estimate Accuracy and Precision for the Process Industries: A Review of Industry DataMr Alex Ogilvie; Mr Robert A Brown Jr; Mr. Frederick P. Biery; Mr. Paul H. Barshop
O'NeillIT-861 MON 2:00-3:00Salon LData Collection Automation Using Everyday ToolsMs Limor Rozmarin; Mr Stephen O'Neill
OrtegoRISK-965MON 5:00-6:00Salon AEvaluating the Costs of Putting a Construction Project on Hold to Resolve IssuesMr Jake Ortego PE CCE; Mr Antonio Fratangelo CCC
OttesenCDR-948TUE 11:00-12:00Salon CUsing the Measured Mile to Increase Calculated Delay QuantumMr Glen R Palmer CFCC PSP; Mr. Jeffery L. Ottesen PE CFCC PSP
OwenIT-922MON 10:00-11:00Salon LL.A.’s $40B Transportation Program: Success of a Program Management Information SystemMr Christen Bergerud; Ms Julie K Owen CCC PSP; Mr Brian Criss PSP
OwenPS-858MON 2:00-3:00Salon BAerospace versus Construction Scheduling: Different Yet Similar Approaches and GoalsMr Thomas W Barnhart PSP; Ms Carmelita Thorndike PSP; Ms Julie K Owen CCC PSP
PalmerCDR-948TUE 11:00-12:00Salon CUsing the Measured Mile to Increase Calculated Delay QuantumMr Glen R Palmer CFCC PSP; Mr. Jeffery L. Ottesen PE CFCC PSP
PapadopoulosBIM-846TUE 9:45-10:45Salon LApplication of BIM and GIS in Class 1-5 Cost EstimatesMr. Apostolos Chatzisymeon PE; Mr. Nick Papadopoulos; Mr George Chatzisymeon
PayneCDR-978 TUE 8:00-9:00Salon CEvaluating Cost Escalation Using Cost-loaded Schedules Mr. Sagar B. Khadka CCE PSP; Mr Christopher J Payne PE CFCC PSP
PetersCDR-974SUN 2:45-3:45 Salon BWhen an Owner's Hard-Line Claims Negotiations are Also a Breach of ContractMr Christopher J Brasco Esq; Mr Adam M Tuckman; Mr Thomas F Peters PE CFCC
PetrisorCSC-1035MON 3:45-4:45Salon KCPM Based Cost Optimization on Non-Schedule Driven Major ProjectsMr Yuhong Wu CCE; Ms Kathryn Petrisor P Eng
PillaiCOM-1121 WED 8:00-9:00Salon KEarned Value Management Subcommittee MeetingMr Asoka K Pillai CCE EVP
RogersPM-804TUE 8:00-9:00Salon DAchieving Design CapacityMr James D Whiteside II PE; Ms Jennifer K Rogers
RoggenkampOWN-921MON 3:45-4:45Salon DReview of a Third Party Capital Estimate from the Owner's PerspectiveMr David B Roggenkamp CCE; Mr Douglas W Leo FRICS CCC CEP
RoseRISK-998SUN 1:30-2:30 Salon CAn Enterprise Architecture Approach to Project OptimizationMs. Claudia Rose; Ms Alexia A Nalewaik FRICS CCE
RozmarinIT-861 MON 2:00-3:00Salon LData Collection Automation Using Everyday ToolsMs Limor Rozmarin; Mr Stephen O'Neill
SadovskaCSC-913WED 9:45-10:45Salon KThe Impact of Lost Time on the Project Estimate: A Lean Manufacturing Approach Ms Nataliya Sadovska; Dr Mohamed Al-Hussein P Eng
SandersCDR-870MON 11:15-12:15Salon CForensic Schedule Analysis: Example Implementations, Part 3Mr Mark C Sanders PE CCE PSP
SandersPS-1015WED 9:45-10:45Salon B(Panel Discussion) Great Debate 2012: Implementation Considerations between Enterprise Scheduling or Stand-Alone SchedulingMr Mark C Sanders PE CCE PSP; Ms Carmelita Thorndike PSP; Mr Mark F Nagata PSP; Mr Patrick M Kelly PSP
SchumacherPS-962TUE 3:45-4:45Salon BLessons Learned - P6™ - Resource Planning for the BeginnerMr Charlie Jackson PSP; Ms Hannah E Schumacher PSP
ShaneCSC-889TUE 8:00-9:00Salon KDesigning to Budget: New Mississippi River Bridge Case StudyDr. Kelly Strong; Dr Carla Lopez del Puerto CCC; Dr Jennifer S. Shane; Ms Megan Miller
ShashPM-1037SUN 1:30-2:30 Conference Room 12Delays in Gas, Oil, and Water Wells ProjectsDr. Ali Ali Shash
SmithCSC-929MON 2:00-3:00Salon KConstruction Schedules for Better Cash Flow ManagementMr Pete A Bassford PSP; Mr Brian C Smith CCC
SparksCSC-1058TUE 5:00-6:00Salon KImplementing Project Control Process from Planning Through Project CompletionMr Kenneth W Sparks PSP
SpeightPM-851TUE 2:00-3:00Salon DLessons Learned from a Wetlands Restoration ProjectMr Calvin J Speight Jr CCE
SpencerPS-1020SUN 1:30-2:30 Conference Room 3&4A Case Study: Enterprise Schedule DevelopmentDr Gary Rock Spencer PE CCE PSP; Ms Rose Mary Lewis PE
StephanCDR-1048MON 3:45-4:45Salon CUse of Project Controls on Mega-Projects to Minimize DisputesDr Kathleen M J Harmon; Mr Bruce M Stephan PE
StephensonCSC-834TUE 9:45-10:45Salon KRP 60R-10: Developing the Project Controls PlanMr H Lance Stephenson CCC
StephensonOWN-927 MON 10:00-11:00Salon DPractical Implementation of a Project Delivery ModelVikesh Kohli; Mr H Lance Stephenson CCC
StrongCSC-889TUE 8:00-9:00Salon KDesigning to Budget: New Mississippi River Bridge Case StudyDr. Kelly Strong; Dr Carla Lopez del Puerto CCC; Dr Jennifer S. Shane; Ms Megan Miller
ThorndikePS-1015WED 9:45-10:45Salon B(Panel Discussion) Great Debate 2012: Implementation Considerations between Enterprise Scheduling or Stand-Alone SchedulingMr Mark C Sanders PE CCE PSP; Ms Carmelita Thorndike PSP; Mr Mark F Nagata PSP; Mr Patrick M Kelly PSP
ThorndikePS-858MON 2:00-3:00Salon BAerospace versus Construction Scheduling: Different Yet Similar Approaches and GoalsMr Thomas W Barnhart PSP; Ms Carmelita Thorndike PSP; Ms Julie K Owen CCC PSP
TuckmanCDR-974SUN 2:45-3:45 Salon BWhen an Owner's Hard-Line Claims Negotiations are Also a Breach of ContractMr Christopher J Brasco Esq; Mr Adam M Tuckman; Mr Thomas F Peters PE CFCC
UppalEST-901MON 11:15-12:15Salon JProject Scope of Work and Cost EstimatingMr Kul B Uppal PE CEP
Van der MerwePS-1092SUN 4:30-5:30 Conference Room 3&4Strategic Planning Preceding Contracting for Successful Project ExecutionMr Gerard Wouter Van der Merwe CCC EVP
van der SteegeCSC-986WED 11:00-12:00Salon KSmart Data Integration in Cost ReportingMr. Anton Willem van der Steege CCE
VandenhaakPM-994TUE 9:45-10:45Salon DLong Term Objectives are Beneficial for JV PartnersMr Carlos Manuel Vara CFCC PSP; Mr Todd M Vandenhaak PE CCE CFCC
VaraPM-994TUE 9:45-10:45Salon DLong Term Objectives are Beneficial for JV PartnersMr Carlos Manuel Vara CFCC PSP; Mr Todd M Vandenhaak PE CCE CFCC
VernonPS-1086MON 10:00-11:00Salon BSchedule Compression Warning ToolsMr Peter A. Jackson; Mr Aaron M Vernon; Mr Christopher P Caddell PE CCE
WalkerOWN-939MON 5:00-6:00Salon DDeveloping Infrastructure Projects Using AlliancesDr Anthony J Mills; Dr. Derek Walker; Beverly Lloyd-Walker
WangINT-1024 MON 11:15-12:15Salon LEstablishment of Sino-Foreign Strategic Alliance in the Chinese Construction IndustryMr Bill Chen; Yuhong Wang; Dr. Jiachuan Li
WeberCDR-1047SUN 1:30-2:30 Salon BHow to Win at MediationDr Kathleen M J Harmon; Mr. Steven J. Weber
WhitesideCSC-990TUE 3:45-4:45Salon KChange Management for Entry-Level Cost Control ProfessionalsMr Gregory James Whiteside CCT
WhitesidePM-804TUE 8:00-9:00Salon DAchieving Design CapacityMr James D Whiteside II PE; Ms Jennifer K Rogers
WilliamsOWN-1042MON 2:00-3:00Salon DOwners: What to Look for in a Contractor's Project Control CapabilityMr. Stephen L. Cabano; Mr Paul G Williams
WinterCOM-1105WED 11:00-12:00Salon BPlanning and Scheduling Subcommittee MeetingMr. Ronald M Winter PSP
WinterPS-825WED 8:00-9:00Salon BLiving with P6 DatabasesMr. Ronald M Winter PSP
WolfADV-882MON 3:45-4:45Salon JAcceptance of a Formalized Cost Engineering ImplementationMr Wayne A Crabtree; Mr James Wolf; Mr Timothy John Havranek
WolfRISK-902WED 9:45-10:45Salon AProject Execution Risk Management in the Biopharmaceutical Industry - A Life Cycle ApproachMr Britton L Wolf
WolfRISK-925TUE 2:00-3:00Salon AScope Analytics: A Quantitative Approach to Scope Management for Environmental Remediation ProjectsMr James Wolf; Mr Wayne A Crabtree; Mr Timothy John Havranek
WolterDEV-1030TUE 11:00-12:00Salon JThe Value of Project Team EngagementMr William F Wolter
WuCSC-1035MON 3:45-4:45Salon KCPM Based Cost Optimization on Non-Schedule Driven Major ProjectsMr Yuhong Wu CCE; Ms Kathryn Petrisor P Eng
ZackCDR-815MON 10:00-11:00Salon CForensic Schedule Analysis - Chapter 2: Delay Analysis on Non-CPM Scheduled ProjectsMr James G Zack Jr CFCC; Mr. Steven A. Collins
ZackEST-1104SUN 2:45-3:45Salon JPricing Contractor Delay CostsMr James G Zack Jr CFCC; Mr Peter V. Badala
ZeinRISK-823WED 11:00-12:00Salon AQuantifying Risks Related to the Execution of Mega ProjectsMr Rashad Zahi Zein CCE PSP; Mr. Luc Heymans
ZhaoCDR-980WED 11:00-12:00Salon CProving Engineering Productivity LossDr. Tong Zhao PE PSP; Mr John Mark Dungan
ZimmermanEVM-971MON 11:15-12:15Salon KInsights into the Baseline Execution IndexMs Leah V Zimmerman CCC EVP PSP